Office acoustics and soundproofing in Dublin

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Meeting rooms
Privacy between rooms. That is partition and door work, not panels.
Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber.
Quote
From a plan and a section, within 48 hours

01 / The material

What this material is and where it earns its place in Dublin

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.

Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.

Work reaching us from Dublin is mostly build-to-rent apartments, Georgian conversions, docklands offices, pubs and venues, clinics.

  • The port is in the city Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.
  • Build-to-rent party walls Thousands of units built to the same separating detail. When that detail underperforms, it underperforms in every flat, so it is worth getting right on the drawing.
  • Georgian conversions High ceilings, lath and plaster, timber floors and protected fabric. Everything has to be done internally and shallow, and often reversibly.
  • Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Dublin.

Office and conference room acoustics Acoustic office screens

02 / The build-up

The build-up, layer by layer

  1. Acoustic hanging ceiling baffles in a large open space

    Layer 1

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Dublin, heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.

    Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.

  2. Acoustic carpet tiles and rugs on a modern floor

    Layer 2

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Dublin, church buildings, parish halls and school halls carry speech and music in the same hard volume.

    Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.

  3. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 3

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Dublin, school buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building.

    Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.

For a Dublin practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / In this market

The Dublin conditions that change the answer

  • The port is in the city

    Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.

  • Build-to-rent party walls

    Thousands of units built to the same separating detail. When that detail underperforms, it underperforms in every flat, so it is worth getting right on the drawing.

  • Georgian conversions

    High ceilings, lath and plaster, timber floors and protected fabric. Everything has to be done internally and shallow, and often reversibly.

  • Late trading under homes

    Pubs and venues now sit beneath apartments that were not there ten years ago. The low end and the footfall are what generate the complaints.

  • Plant and HVAC

    Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.

04 / Room by room

Where the money goes on a Dublin project

  • Office ceiling with acoustic clouds and baffles

    Open plan

    Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.

  • Acoustic wall panels in office

    Meeting rooms

    Privacy between rooms. That is partition and door work, not panels. Thousands of units built to the same separating detail. When that detail underperforms, it underperforms in every flat, so it is worth getting right on the drawing.

  • Office acoustic carpet tiles and rugs

    Cabins and calls

    Short RT so a call sounds clean. A small amount of well placed absorber. High ceilings, lath and plaster, timber floors and protected fabric. Everything has to be done internally and shallow, and often reversibly.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Climate and durability

What the Dublin climate rules in and rules out

Dublin is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The failure we design against here is condensation behind linings in older, poorly insulated stock.

Where a consultant is already engaged on a Dublin project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Read this first

What we watch go wrong on jobs like this

  • Lining every wall while leaving the ceiling bare

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating a privacy problem with absorption

    If the complaint is being overheard, no amount of absorption inside the room will fix it. That is a partition job and we will say so.

  • Glass cabins specified without a door and head detail

    A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.

  • Treating it as a generic Dublin job

    Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.

05 / Logistics

Supply into Dublin, start to site

Supply into Dublin
Ships fromPalwal, Haryana, India
Arrives atDublin Port, minutes from most city sites
Dispatch4 to 7 working days
FreightSea into Dublin Port
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight direct into Dublin Port, then a short road run to site. Air freight for samples and urgent quantities.

FAQ

Questions from Dublin projects

What makes office acoustics and soundproofing different in Dublin?

Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries. Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.

Where should the budget go first on a Dublin project?

Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.

Do you have an office or installation team in Dublin?

No. We manufacture in India and supply into Dublin. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Dublin site?

ships from: Palwal, Haryana, India, arrives at: Dublin Port, minutes from most city sites, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.