Home > Dublin > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Dublin

HVAC, plant and machine noise control in Dublin

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / What it is

The material, and what it actually does on a Dublin job

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.

Work reaching us from Dublin is mostly build-to-rent apartments, Georgian conversions, docklands offices, pubs and venues, clinics.

  • The port is in the city Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.
  • Build-to-rent party walls Thousands of units built to the same separating detail. When that detail underperforms, it underperforms in every flat, so it is worth getting right on the drawing.
  • Georgian conversions High ceilings, lath and plaster, timber floors and protected fabric. Everything has to be done internally and shallow, and often reversibly.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Dublin.

HVAC duct soundproofing Machine noise control

02 / The build-up

The stack, in the order it is installed

  1. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 1

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Dublin, heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.

    With a porous backing. Board over mineral backing where the room needs more than the board alone gives.

  2. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 2

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Dublin, church buildings, parish halls and school halls carry speech and music in the same hard volume.

    Corner loading. Low frequency energy collects in corners, so absorber in the corners does more than the same area spread across a wall.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Dublin, school buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building.

    Horizontal clouds. Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.

Architects working in Dublin usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / In this market

What decides the build-up in Dublin

  • The port is in the city

    Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.

  • Build-to-rent party walls

    Thousands of units built to the same separating detail. When that detail underperforms, it underperforms in every flat, so it is worth getting right on the drawing.

  • Georgian conversions

    High ceilings, lath and plaster, timber floors and protected fabric. Everything has to be done internally and shallow, and often reversibly.

  • Late trading under homes

    Pubs and venues now sit beneath apartments that were not there ten years ago. The low end and the footfall are what generate the complaints.

  • Plant and HVAC

    Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.

04 / Room by room

What each space in a Dublin project needs

  • Insulated HVAC ducts that need acoustic lagging

    At source

    Enclosure, barrier or anti vibration mounts at the machine. Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.

  • Air handling units in an industrial plant room

    In the path

    Duct lining, attenuators and lagging on the first run out of the plant. Thousands of units built to the same separating detail. When that detail underperforms, it underperforms in every flat, so it is worth getting right on the drawing.

  • Boiler and pipework room that needs noise control

    At the receiver

    Only after the first two, and only for what is left. High ceilings, lath and plaster, timber floors and protected fabric. Everything has to be done internally and shallow, and often reversibly.

For a Dublin interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate and durability

What the Dublin climate rules in and rules out

Dublin is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The failure we design against here is condensation behind linings in older, poorly insulated stock.

On a Dublin job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Straight talk

Where this kind of project usually fails

  • Absorption on the office wall for a plant room problem

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Ignoring structure borne vibration through the mounts

    Small on the drawing, expensive on site, and almost always found after handover.

  • Treating it as a generic Dublin job

    Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.

05 / Route to site

How material reaches a Dublin site

Supply into Dublin
Ships fromPalwal, Haryana, India
Arrives atDublin Port, minutes from most city sites
Dispatch4 to 7 working days
FreightSea into Dublin Port
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight direct into Dublin Port, then a short road run to site. Air freight for samples and urgent quantities.

FAQ

Questions from Dublin projects

What makes HVAC, plant and machine noise control different in Dublin?

Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries. Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.

Where should the budget go first on a Dublin project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Dublin?

No. We manufacture in India and supply into Dublin. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Dublin site?

ships from: Palwal, Haryana, India, arrives at: Dublin Port, minutes from most city sites, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.