For projects in Dublin
Hospital and healthcare acoustics in Dublin
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
- Consulting room privacy
- Speech privacy between rooms, which is partition, door and ceiling void work.
- Ward noise floor
- Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
- Cleanability
- Non shedding, non absorbent surfaces that survive a cleaning regime.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The product, described honestly, for a Dublin brief
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.
Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
Work reaching us from Dublin is mostly build-to-rent apartments, Georgian conversions, docklands offices, pubs and venues, clinics.
- The port is in the city Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.
- Build-to-rent party walls Thousands of units built to the same separating detail. When that detail underperforms, it underperforms in every flat, so it is worth getting right on the drawing.
- Georgian conversions High ceilings, lath and plaster, timber floors and protected fabric. Everything has to be done internally and shallow, and often reversibly.
- Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in Dublin.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Dublin, heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
-

Layer 2
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Dublin, church buildings, parish halls and school halls carry speech and music in the same hard volume.
Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Dublin, school buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building.
Ceiling first. In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.
For a Dublin practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / In this market
What we see driving Dublin briefs
- The port is in the city
Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.
- Build-to-rent party walls
Thousands of units built to the same separating detail. When that detail underperforms, it underperforms in every flat, so it is worth getting right on the drawing.
- Georgian conversions
High ceilings, lath and plaster, timber floors and protected fabric. Everything has to be done internally and shallow, and often reversibly.
- Late trading under homes
Pubs and venues now sit beneath apartments that were not there ten years ago. The low end and the footfall are what generate the complaints.
- Plant and HVAC
Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
04 / Room by room
Space by space, for Dublin briefs
-

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work. Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.
- Acoustic carpet and rugs, 500 x 500 mm
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling. Thousands of units built to the same separating detail. When that detail underperforms, it underperforms in every flat, so it is worth getting right on the drawing.
- Acoustic carpet and rugs, 4 mm
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
-

Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime. High ceilings, lath and plaster, timber floors and protected fabric. Everything has to be done internally and shallow, and often reversibly.
- Acoustic carpet and rugs, High density polyester
- SoundBlanket mass loaded vinyl, 12.6 kg per sq m, STC on request
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
For a Dublin interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Climate and durability
Durability in Dublin, before acoustics is discussed
Dublin is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
Where a consultant is already engaged on a Dublin project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Read this first
Where this kind of project usually fails
-
Fabric wrapped products in a clinical area
Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.
-
Absorption used where privacy was the requirement
If the complaint is being overheard, no amount of absorption inside the room will fix it. That is a partition job and we will say so.
-
Ceiling void left open above a partition
The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.
-
Treating it as a generic Dublin job
Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.
05 / Logistics
Getting it to Dublin, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Dublin Port, minutes from most city sites |
| Dispatch | 4 to 7 working days |
| Freight | Sea into Dublin Port |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight direct into Dublin Port, then a short road run to site. Air freight for samples and urgent quantities.
Questions from Dublin projects
What makes hospital and healthcare acoustics different in Dublin?
Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries. Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.
Where should the budget go first on a Dublin project?
Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Do you have an office or installation team in Dublin?
No. We manufacture in India and supply into Dublin. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Dublin site?
ships from: Palwal, Haryana, India, arrives at: Dublin Port, minutes from most city sites, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.