Home > Dublin > School and classroom acoustics

Modern school classroom with felt acoustic panels on walls

For projects in Dublin

School and classroom acoustics in Dublin

Hard floors, bare walls and long corridors that amplify everything. Children with developing language, and anyone with a hearing difficulty, lose more from a live classroom than adults do, which is why intelligibility is the target rather than quiet. School buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building.

Classroom RT
A number, set against room volume, achieved mostly at the ceiling.
Corridor spill
Long hard circulation feeds every room off it. Treating the corridor helps every classroom at once.
Halls and gyms
Dual use rooms carrying speech, music and sport, where durability decides the product.
Quote
From a plan and a section, within 48 hours

01 / The product

What this is, and what it changes in a Dublin room

Hard floors, bare walls and long corridors that amplify everything. Children with developing language, and anyone with a hearing difficulty, lose more from a live classroom than adults do, which is why intelligibility is the target rather than quiet.

School buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building.

Work reaching us from Dublin is mostly build-to-rent apartments, Georgian conversions, docklands offices, pubs and venues, clinics.

  • The port is in the city Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.
  • Build-to-rent party walls Thousands of units built to the same separating detail. When that detail underperforms, it underperforms in every flat, so it is worth getting right on the drawing.
  • Georgian conversions High ceilings, lath and plaster, timber floors and protected fabric. Everything has to be done internally and shallow, and often reversibly.
  • Classroom RT A number, set against room volume, achieved mostly at the ceiling.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for school acoustics are on the main product page. This page covers what that means for a project in Dublin.

School and classroom acoustics PET felt acoustic panels

02 / The build-up

What goes where, from the structure in

  1. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 1

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Dublin, heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.

    With a porous backing. Board over mineral backing where the room needs more than the board alone gives.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Dublin, church buildings, parish halls and school halls carry speech and music in the same hard volume.

    Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.

  3. Acoustic carpet tiles and rugs on a modern floor

    Layer 3

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Dublin, school buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building.

    Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / On the ground

What the buildings in Dublin do to the specification

  • The port is in the city

    Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.

  • Build-to-rent party walls

    Thousands of units built to the same separating detail. When that detail underperforms, it underperforms in every flat, so it is worth getting right on the drawing.

  • Georgian conversions

    High ceilings, lath and plaster, timber floors and protected fabric. Everything has to be done internally and shallow, and often reversibly.

  • Late trading under homes

    Pubs and venues now sit beneath apartments that were not there ten years ago. The low end and the footfall are what generate the complaints.

  • Assembly and performance rooms

    Church buildings, parish halls and school halls carry speech and music in the same hard volume.

  • School and campus buildings

    School buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building.

04 / Room by room

Space by space, for Dublin briefs

  • Classroom walls treated with felt acoustic panels

    Classroom RT

    A number, set against room volume, achieved mostly at the ceiling. Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.

  • Library with felt acoustic panels

    Corridor spill

    Long hard circulation feeds every room off it. Treating the corridor helps every classroom at once. Thousands of units built to the same separating detail. When that detail underperforms, it underperforms in every flat, so it is worth getting right on the drawing.

  • School corridor treated with felt acoustic panels

    Halls and gyms

    Dual use rooms carrying speech, music and sport, where durability decides the product. High ceilings, lath and plaster, timber floors and protected fabric. Everything has to be done internally and shallow, and often reversibly.

For a Dublin interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate and durability

Why the climate in Dublin changes the material, not the target

Dublin is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The failure we design against here is condensation behind linings in older, poorly insulated stock.

On a Dublin job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Read this first

Six mistakes that turn into a second fit-out

  • Panels at child height where they get damaged

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating one classroom and leaving the corridor

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Choosing a product that cannot take a football

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Treating it as a generic Dublin job

    Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.

05 / Route to site

How material reaches a Dublin site

Supply into Dublin
Ships fromPalwal, Haryana, India
Arrives atDublin Port, minutes from most city sites
Dispatch4 to 7 working days
FreightSea into Dublin Port
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight direct into Dublin Port, then a short road run to site. Air freight for samples and urgent quantities.

FAQ

Questions from Dublin projects

What makes school and classroom acoustics different in Dublin?

School buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building. Containers land at Dublin Port and are on site the same day. That is the practical reason a factory in India can compete here on landed cost and on timing.

Where should the budget go first on a Dublin project?

Classroom RT. A number, set against room volume, achieved mostly at the ceiling. Corridor spill. Long hard circulation feeds every room off it. Treating the corridor helps every classroom at once.

Do you have an office or installation team in Dublin?

No. We manufacture in India and supply into Dublin. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Dublin site?

ships from: Palwal, Haryana, India, arrives at: Dublin Port, minutes from most city sites, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Panels at child height where they get damaged. Treating one classroom and leaving the corridor.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.