Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A growing media and broadcast sector fitting rooms into existing commercial and residential buildings, where the neighbouring tenancy sets the achievable noise floor.

Isolation
A measured background level, agreed before anything is bought.
Low frequency
Corner and boundary absorption with real depth, not surface foam.
Early reflections
Controlled at the mix position, and only there.
Quote
From a plan and a section, within 48 hours

01 / What it is

The product, described honestly, for a Jordan brief

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.

A growing media and broadcast sector fitting rooms into existing commercial and residential buildings, where the neighbouring tenancy sets the achievable noise floor.

Work reaching us from Jordan is mostly hotels and hospitality, offices, institutional buildings, hospitals, schools, venues.

  • Stone inside and out Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.
  • Aqaba, then the drive north The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.
  • Dry heat and sealed rooms Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.
  • Isolation A measured background level, agreed before anything is bought.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Jordan.

Recording studio soundproofing Acoustic foam and bass traps

02 / The build-up

What goes where, from the structure in

  1. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 1

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Jordan, split units and central plant with seasonal heating and cooling, condensers on roofs and balconies.

    Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Jordan, mosques, churches and civic halls are stone volumes with very long reverberation.

    Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.

  3. ...

    Layer 3

    Soundproof curtains

    A layered curtain with a mass loaded vinyl core, used where an opening has to stay an opening. In Jordan, school and university buildings are stone and concrete with high ceilings and long corridors that carry every sound.

    Full height with return. Curtain taken floor to soffit with a side return and an overlap, because the gap is what leaks, not the fabric.

If you are specifying for a Jordan project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / Local conditions

What decides the build-up in Jordan

  • Stone inside and out

    Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

  • Aqaba, then the drive north

    The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.

  • Dry heat and sealed rooms

    Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.

  • Institutional and assembly spaces

    Large halls in stone and concrete where speech stops being intelligible long before the room sounds obviously wrong.

  • The housing stock

    Stone faced concrete construction with hard floors throughout. Apartment blocks share slabs that pass footfall directly.

  • The studio and content scene

    A growing media and broadcast sector fitting rooms into existing commercial and residential buildings, where the neighbouring tenancy sets the achievable noise floor.

04 / Room by room

What each space in a Jordan project needs

  • Recording studio soundproof wall system

    Isolation

    A measured background level, agreed before anything is bought. Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

  • Acoustic foam and panels in a recording studio

    Low frequency

    Corner and boundary absorption with real depth, not surface foam. The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.

  • Studio door and control room window

    Early reflections

    Controlled at the mix position, and only there. Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

04 / Climate

What the Jordan climate rules in and rules out

Jordan is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.

Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.

The failure we design against here is dust ingress and thermal movement in long runs.

Where a consultant is already engaged on a Jordan project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Read this first

Where this kind of project usually fails

  • Buying foam to solve an isolation problem

    Small on the drawing, expensive on site, and almost always found after handover.

  • Treating the room before the shell is isolated

    Small on the drawing, expensive on site, and almost always found after handover.

  • Killing the room completely and calling it controlled

    More absorption is not better absorption. Past the target the room goes flat and people raise their voices to compensate.

  • Treating it as a generic Jordan job

    Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

05 / Getting it there

Supply into Jordan, start to site

Supply into Jordan
Ships fromPalwal, Haryana, India
Arrives atAqaba, then road north to Amman
Dispatch4 to 7 working days
FreightSea via Aqaba, then road
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Aqaba, then road north to Amman and beyond. Air freight for samples and urgent quantities.

FAQ

Questions from Jordan projects

What makes recording studio acoustics and soundproofing different in Jordan?

A growing media and broadcast sector fitting rooms into existing commercial and residential buildings, where the neighbouring tenancy sets the achievable noise floor. Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

Where should the budget go first on a Jordan project?

Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.

Do you have an office or installation team in Jordan?

No. We manufacture in India and supply into Jordan. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Jordan site?

ships from: Palwal, Haryana, India, arrives at: Aqaba, then road north to Amman, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Buying foam to solve an isolation problem. Treating the room before the shell is isolated.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.