Serious equipment in a room with no isolation plan. The complaint is almost never the speakers. It is bass leaving the room and an untreated box making the system sound worse than it is. Stone faced concrete construction with hard floors throughout. Apartment blocks share slabs that pass footfall directly.

Containment
Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point.
Low frequency inside
Corner absorption with depth, before any surface treatment.
Reflections
Side wall and ceiling first reflection points at the seating position.
Quote
From a plan and a section, within 48 hours

01 / What it is

The product, described honestly, for a Jordan brief

Serious equipment in a room with no isolation plan. The complaint is almost never the speakers. It is bass leaving the room and an untreated box making the system sound worse than it is.

Stone faced concrete construction with hard floors throughout. Apartment blocks share slabs that pass footfall directly.

Work reaching us from Jordan is mostly hotels and hospitality, offices, institutional buildings, hospitals, schools, venues.

  • Stone inside and out Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.
  • Aqaba, then the drive north The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.
  • Dry heat and sealed rooms Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.
  • Containment Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for home theatre soundproofing are on the main product page. This page covers what that means for a project in Jordan.

Home theatre soundproofing SoundBlanket mass loaded vinyl

02 / The build-up

What goes where, from the structure in

  1. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 1

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Jordan, split units and central plant with seasonal heating and cooling, condensers on roofs and balconies.

    Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.

  2. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 2

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Jordan, mosques, churches and civic halls are stone volumes with very long reverberation.

    Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.

  3. Acoustic carpet tiles and rugs on a modern floor

    Layer 3

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Jordan, school and university buildings are stone and concrete with high ceilings and long corridors that carry every sound.

    Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.

Architects working in Jordan usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / Local conditions

What the buildings in Jordan do to the specification

  • Stone inside and out

    Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

  • Aqaba, then the drive north

    The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.

  • Dry heat and sealed rooms

    Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.

  • Institutional and assembly spaces

    Large halls in stone and concrete where speech stops being intelligible long before the room sounds obviously wrong.

  • The housing stock

    Stone faced concrete construction with hard floors throughout. Apartment blocks share slabs that pass footfall directly.

04 / Room by room

Room by room, on a typical Jordan job

  • Home theatre acoustic fabric wall panels

    Containment

    Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point. Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

  • Felt acoustic panels in home theatre

    Low frequency inside

    Corner absorption with depth, before any surface treatment. The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.

  • Acoustic foam panels and bass traps

    Reflections

    Side wall and ceiling first reflection points at the seating position. Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Conditions

What the Jordan climate rules in and rules out

Jordan is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.

Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.

The failure we design against here is dust ingress and thermal movement in long runs.

On a Jordan job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Before you buy

The six errors that cost the most

  • Foam on the walls as a soundproofing measure

    This is the one that comes back as a second fit-out rather than a snag.

  • A standard door on a room built to hold bass

    A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.

  • Treating before the room is sealed

    Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.

  • Treating it as a generic Jordan job

    Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

05 / Logistics

Supply into Jordan, start to site

Supply into Jordan
Ships fromPalwal, Haryana, India
Arrives atAqaba, then road north to Amman
Dispatch4 to 7 working days
FreightSea via Aqaba, then road
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Aqaba, then road north to Amman and beyond. Air freight for samples and urgent quantities.

FAQ

Questions from Jordan projects

What makes home theatre soundproofing and acoustics different in Jordan?

Stone faced concrete construction with hard floors throughout. Apartment blocks share slabs that pass footfall directly. Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

Where should the budget go first on a Jordan project?

Containment. Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point. Low frequency inside. Corner absorption with depth, before any surface treatment.

Do you have an office or installation team in Jordan?

No. We manufacture in India and supply into Jordan. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Jordan site?

ships from: Palwal, Haryana, India, arrives at: Aqaba, then road north to Amman, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Foam on the walls as a soundproofing measure. A standard door on a room built to hold bass.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.