Manufactured in India, supplied in Jordan
Soundproofing materials in Jordan
We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Jordan. Made at our own plant in India and shipped into Aqaba on the Red Sea, then road north to Amman.
- SoundBlanket MLV
- 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- BassBloc
- 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Principle
- Mass, then decoupling, then cavity absorption, then sealing
- Test standards
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Lead time
- 4 to 7 working days for stock items
- ASTM E90 for the barrier, ASTM C423 for the absorber
- Made at our own plant, Palwal, Haryana, India
- One batch across the order, no blending between runs
We are the manufacturer. There is no local office and we do not claim approvals we do not hold. What you get is factory pricing, one consistent batch across the order, and a straight answer on what the material will and will not do.
01 / What it is
The product, described honestly, for a Jordan brief
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.
Work reaching us from Jordan is mostly hotels and hospitality, offices, institutional buildings, hospitals, schools, venues.
Stone faced concrete construction with hard floors throughout. Apartment blocks share slabs that pass footfall directly.
- Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
- Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
- Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
- What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Jordan.
SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems
02 / Specification sheet
The numbers, and they do not move by city
Nothing below changes by location. The decisions that do change are grade, thickness and how the material is mounted, and those are covered further down.
- Light retrofit2.5 mm membrane. Where depth is not available
- Standard partition4 mm membrane on an independent leaf. The common specification
- Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
| SoundBlanket MLV | 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6 |
|---|---|
| BassBloc | 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85 |
| Principle | Mass, then decoupling, then cavity absorption, then sealing |
| Test standards | ASTM E90 for the barrier, ASTM C423 for the absorber |
On a Jordan job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
03 / In this market
What decides the build-up in Jordan
- Stone inside and out
Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.
- Aqaba, then the drive north
The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.
- Dry heat and sealed rooms
Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.
- Institutional and assembly spaces
Large halls in stone and concrete where speech stops being intelligible long before the room sounds obviously wrong.
- Plant and HVAC
Split units and central plant with seasonal heating and cooling, condensers on roofs and balconies.
- The housing stock
Stone faced concrete construction with hard floors throughout. Apartment blocks share slabs that pass footfall directly.
Architects working in Jordan usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
04 / Climate and durability
Why the climate in Jordan changes the material, not the target
Jordan is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the sensible material list before acoustics is even discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The risk we design against here is dust ingress and thermal movement in long runs.
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
05 / Getting it there
What the route into Jordan actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Aqaba, then road north to Amman |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Aqaba, then road |
| Packing | Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list. |
| Lead time | 4 to 7 working days for stock items. |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Aqaba, then road north to Amman and beyond. Air freight for samples and urgent quantities.
06 / Straight talk
The things worth knowing before you place the order
-
The wrong product for the problem
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
-
Coverage bought instead of a target
Lining every surface is a purchase, not a result. We would rather calculate the area against a reverberation target and sell you less of it.
-
Local approvals that nobody actually holds
We hold no Jordan certification and we will not borrow one. The test data we publish is ours, and we will send the reports rather than describe them.
07 / In projects
In finished rooms
Jordan: questions we are actually asked
Is there a Jordan factory behind this product?
No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Jordan as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Aqaba on the Red Sea, then road north to Amman. You buy at factory prices with one consistent batch across the order.
What changes the specification on a Jordan job?
Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work. The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates. Those two things move the build-up far more than the panel figure does.
Does Jordan weather shorten the life of this material?
Jordan is hot and dry for most of the year, with dust and high daytime surface temperatures. Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves. The failure we design against here is dust ingress and thermal movement in long runs.
How does an order actually travel to Jordan?
ships from: Palwal, Haryana, India, arrives at: Aqaba, then road north to Amman, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
When are soundproofing materials the wrong purchase?
Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.
What is the minimum order and how is it packed?
Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Next step
Tell us the room, we will tell you the build-up
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.