Home > Jordan > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Jordan

HVAC, plant and machine noise control in Jordan

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split units and central plant with seasonal heating and cooling, condensers on roofs and balconies.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / The material

What you are buying, and what it fixes in Jordan

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Split units and central plant with seasonal heating and cooling, condensers on roofs and balconies.

Work reaching us from Jordan is mostly hotels and hospitality, offices, institutional buildings, hospitals, schools, venues.

  • Dry heat and sealed rooms Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.
  • Stone inside and out Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.
  • Aqaba, then the drive north The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Jordan.

HVAC duct soundproofing Machine noise control

02 / The build-up

How the layers stack, from the structure inwards

  1. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 1

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Jordan, split units and central plant with seasonal heating and cooling, condensers on roofs and balconies.

    Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.

  2. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 2

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Jordan, mosques, churches and civic halls are stone volumes with very long reverberation.

    Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Jordan, school and university buildings are stone and concrete with high ceilings and long corridors that carry every sound.

    Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / In this market

What we see driving Jordan briefs

  • Dry heat and sealed rooms

    Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.

  • Stone inside and out

    Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

  • Aqaba, then the drive north

    The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.

  • Institutional and assembly spaces

    Large halls in stone and concrete where speech stops being intelligible long before the room sounds obviously wrong.

  • Plant and HVAC

    Split units and central plant with seasonal heating and cooling, condensers on roofs and balconies.

04 / Room by room

What each space in a Jordan project needs

  • Insulated HVAC ducts that need acoustic lagging

    At source

    Enclosure, barrier or anti vibration mounts at the machine. Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.

  • Air handling units in an industrial plant room

    In the path

    Duct lining, attenuators and lagging on the first run out of the plant. Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

  • Boiler and pipework room that needs noise control

    At the receiver

    Only after the first two, and only for what is left. The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Climate

What the Jordan climate rules in and rules out

Jordan is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.

Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.

The failure we design against here is dust ingress and thermal movement in long runs.

On a Jordan job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Straight talk

Where this kind of project usually fails

  • Absorption on the office wall for a plant room problem

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Ignoring structure borne vibration through the mounts

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating it as a generic Jordan job

    Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.

05 / Supply

What the route into Jordan actually looks like

Supply into Jordan
Ships fromPalwal, Haryana, India
Arrives atAqaba, then road north to Amman
Dispatch4 to 7 working days
FreightSea via Aqaba, then road
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Aqaba, then road north to Amman and beyond. Air freight for samples and urgent quantities.

FAQ

Questions from Jordan projects

What makes HVAC, plant and machine noise control different in Jordan?

Split units and central plant with seasonal heating and cooling, condensers on roofs and balconies. Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

Where should the budget go first on a Jordan project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Jordan?

No. We manufacture in India and supply into Jordan. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Jordan site?

ships from: Palwal, Haryana, India, arrives at: Aqaba, then road north to Amman, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.