f Restaurant, Bar & Nightclub Soundproofing in Jordan

Home > Jordan > Venue and restaurant acoustics

Nightclub and premium restaurant interior with acoustic treatment

For projects in Jordan

Venue and restaurant acoustics in Jordan

Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Mosques, churches and civic halls are stone volumes with very long reverberation.

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other.
Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is.
Quote
From a plan and a section, within 48 hours

01 / The material

What you are buying, and what it fixes in Jordan

Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.

Mosques, churches and civic halls are stone volumes with very long reverberation.

Work reaching us from Jordan is mostly hotels and hospitality, offices, institutional buildings, hospitals, schools, venues.

  • Stone inside and out Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.
  • Aqaba, then the drive north The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.
  • Dry heat and sealed rooms Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.
  • Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Jordan.

Nightclub and venue soundproofing SoundBlanket mass loaded vinyl

02 / The build-up

What goes where, from the structure in

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Jordan, split units and central plant with seasonal heating and cooling, condensers on roofs and balconies.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  2. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 2

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Jordan, mosques, churches and civic halls are stone volumes with very long reverberation.

    Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.

  3. Acoustic wooden slat wall and ceiling in a premium auditorium

    Layer 3

    Wooden slat acoustic panels

    Timber slats on an acoustic backing. In Jordan, school and university buildings are stone and concrete with high ceilings and long corridors that carry every sound.

    Slats on a cavity. Backing plus an air gap behind moves absorption lower, which matters in music rooms.

For a Jordan practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / Local conditions

The Jordan conditions that change the answer

  • Stone inside and out

    Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

  • Aqaba, then the drive north

    The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.

  • Dry heat and sealed rooms

    Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.

  • Institutional and assembly spaces

    Large halls in stone and concrete where speech stops being intelligible long before the room sounds obviously wrong.

  • Assembly and performance rooms

    Mosques, churches and civic halls are stone volumes with very long reverberation.

04 / Room by room

Room by room, on a typical Jordan job

  • Wall and ceiling soundproofing layers

    Containment

    Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

  • Walls with wood wool, felt and wooden slats

    Table level comfort

    Absorption at the ceiling so guests stop raising their voices at each other. The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.

  • Ceiling baffles and clouds in hospitality space

    Entrance and service

    Doors, lobbies and extract paths, which is where most of the leakage actually is. Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Conditions

The Jordan climate decides the material list

Jordan is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.

Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.

The failure we design against here is dust ingress and thermal movement in long runs.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Worth knowing

Where this kind of project usually fails

  • Panels on the wall as a neighbour noise solution

    Small on the drawing, expensive on site, and almost always found after handover.

  • A lobby with both doors able to open at once

    A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.

  • Extract ducting that bypasses every wall you built

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Treating it as a generic Jordan job

    Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

05 / Route to site

Supply into Jordan, start to site

Supply into Jordan
Ships fromPalwal, Haryana, India
Arrives atAqaba, then road north to Amman
Dispatch4 to 7 working days
FreightSea via Aqaba, then road
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Aqaba, then road north to Amman and beyond. Air freight for samples and urgent quantities.

FAQ

Questions from Jordan projects

What makes venue and restaurant acoustics different in Jordan?

Mosques, churches and civic halls are stone volumes with very long reverberation. Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

Where should the budget go first on a Jordan project?

Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.

Do you have an office or installation team in Jordan?

No. We manufacture in India and supply into Jordan. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Jordan site?

ships from: Palwal, Haryana, India, arrives at: Aqaba, then road north to Amman, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.