For projects in Amsterdam
Venue and restaurant acoustics in Amsterdam
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Church buildings, civic halls and converted industrial spaces have long decay times and hard surfaces throughout.
- Containment
- Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
- Table level comfort
- Absorption at the ceiling so guests stop raising their voices at each other.
- Entrance and service
- Doors, lobbies and extract paths, which is where most of the leakage actually is.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What this is, and what it changes in a Amsterdam room
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.
Church buildings, civic halls and converted industrial spaces have long decay times and hard surfaces throughout.
Work reaching us from Amsterdam is mostly canal house apartments, hotels, offices in Zuid and Noord, studios, bars, clinics.
- Canal houses carry everything Seventeenth century houses were built narrow and tall with timber floors on shared party walls. Footfall and speech travel down and sideways, which is why a resilient layer under the finish beats anything hung on a wall.
- Listed facades, internal fixes only On a monument you cannot change the outside and often cannot change the structure. Everything has to be done from the inside, shallow, and ideally reversible.
- Venue noise limits are enforced Amsterdam operators live with real decibel and low frequency conditions on their permits, and the low end is what gets them into trouble. Containment is not optional here, it is the licence.
- Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Amsterdam.
Nightclub and venue soundproofing SoundBlanket mass loaded vinyl
02 / The build-up
What goes where, from the structure in
-

Layer 1
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Amsterdam, balanced mechanical ventilation is standard, so duct and terminal unit noise replace open window noise.
Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.
-

Layer 2
Wooden slat acoustic panels
Timber slats on an acoustic backing. In Amsterdam, church buildings, civic halls and converted industrial spaces have long decay times and hard surfaces throughout.
Slats on felt backing. The standard. Absorption comes from the backing behind the gaps, so the slat gap ratio is an acoustic decision, not only a visual one.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Amsterdam, school buildings are well insulated and airtight with hard cleanable surfaces, so rooms stay live and ventilation noise is always present.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
Architects working in Amsterdam usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / In this market
What we see driving Amsterdam briefs
- Canal houses carry everything
Seventeenth century houses were built narrow and tall with timber floors on shared party walls. Footfall and speech travel down and sideways, which is why a resilient layer under the finish beats anything hung on a wall.
- Listed facades, internal fixes only
On a monument you cannot change the outside and often cannot change the structure. Everything has to be done from the inside, shallow, and ideally reversible.
- Venue noise limits are enforced
Amsterdam operators live with real decibel and low frequency conditions on their permits, and the low end is what gets them into trouble. Containment is not optional here, it is the licence.
- Recycled content gets asked first
Our PET felt is made from recycled bottle flake. In Dutch tenders that question comes before the acoustic one, and it is the easiest one for us to answer honestly.
- Assembly and performance rooms
Church buildings, civic halls and converted industrial spaces have long decay times and hard surfaces throughout.
04 / Room by room
Space by space, for Amsterdam briefs
-

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Seventeenth century houses were built narrow and tall with timber floors on shared party walls. Footfall and speech travel down and sideways, which is why a resilient layer under the finish beats anything hung on a wall.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Acoustic carpet and rugs, High density polyester
-

Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other. On a monument you cannot change the outside and often cannot change the structure. Everything has to be done from the inside, shallow, and ideally reversible.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Acoustic carpet and rugs, Felt
-

Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is. Amsterdam operators live with real decibel and low frequency conditions on their permits, and the low end is what gets them into trouble. Containment is not optional here, it is the licence.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
- Acoustic carpet and rugs, 64 sq ft per pack
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Climate and durability
What the Amsterdam climate rules in and rules out
Amsterdam is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Worth knowing
What we watch go wrong on jobs like this
-
Panels on the wall as a neighbour noise solution
This is the one that comes back as a second fit-out rather than a snag.
-
A lobby with both doors able to open at once
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Extract ducting that bypasses every wall you built
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Treating it as a generic Amsterdam job
Seventeenth century houses were built narrow and tall with timber floors on shared party walls. Footfall and speech travel down and sideways, which is why a resilient layer under the finish beats anything hung on a wall.
05 / Getting it there
Supply into Amsterdam, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Rotterdam, then a short road run into the city |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Rotterdam |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we tell you that before you order, not after.
Sea freight into Rotterdam, then road into Amsterdam. Being close to the port keeps the inland cost low. Air freight for samples and urgent quantities.
Questions from Amsterdam projects
What makes venue and restaurant acoustics different in Amsterdam?
Church buildings, civic halls and converted industrial spaces have long decay times and hard surfaces throughout. Seventeenth century houses were built narrow and tall with timber floors on shared party walls. Footfall and speech travel down and sideways, which is why a resilient layer under the finish beats anything hung on a wall.
Where should the budget go first on a Amsterdam project?
Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.
Do you have an office or installation team in Amsterdam?
No. We manufacture in India and supply into Amsterdam. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Amsterdam site?
ships from: Palwal, Haryana, India, arrives at: Rotterdam, then a short road run into the city, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we tell you that before you order, not after.
What goes wrong most often on this kind of project?
Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.