For projects in Amsterdam
Recording studio acoustics and soundproofing in Amsterdam
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. Rooms are fitted into terraces and converted warehouses where the party wall decides what is achievable.
- Isolation
- A measured background level, agreed before anything is bought.
- Low frequency
- Corner and boundary absorption with real depth, not surface foam.
- Early reflections
- Controlled at the mix position, and only there.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What you are buying, and what it fixes in Amsterdam
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.
Rooms are fitted into terraces and converted warehouses where the party wall decides what is achievable.
Work reaching us from Amsterdam is mostly canal house apartments, hotels, offices in Zuid and Noord, studios, bars, clinics.
- Canal houses carry everything Seventeenth century houses were built narrow and tall with timber floors on shared party walls. Footfall and speech travel down and sideways, which is why a resilient layer under the finish beats anything hung on a wall.
- Listed facades, internal fixes only On a monument you cannot change the outside and often cannot change the structure. Everything has to be done from the inside, shallow, and ideally reversible.
- Venue noise limits are enforced Amsterdam operators live with real decibel and low frequency conditions on their permits, and the low end is what gets them into trouble. Containment is not optional here, it is the licence.
- Isolation A measured background level, agreed before anything is bought.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Amsterdam.
02 / The build-up
The build-up, layer by layer
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Amsterdam, balanced mechanical ventilation is standard, so duct and terminal unit noise replace open window noise.
Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Amsterdam, church buildings, civic halls and converted industrial spaces have long decay times and hard surfaces throughout.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
-

Layer 3
Soundproof curtains
A layered curtain with a mass loaded vinyl core, used where an opening has to stay an opening. In Amsterdam, school buildings are well insulated and airtight with hard cleanable surfaces, so rooms stay live and ventilation noise is always present.
Double layer at a doorway. Two curtains with an air gap where a single layer will not reach the target.
If you are specifying for a Amsterdam project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / In this market
What decides the build-up in Amsterdam
- Canal houses carry everything
Seventeenth century houses were built narrow and tall with timber floors on shared party walls. Footfall and speech travel down and sideways, which is why a resilient layer under the finish beats anything hung on a wall.
- Listed facades, internal fixes only
On a monument you cannot change the outside and often cannot change the structure. Everything has to be done from the inside, shallow, and ideally reversible.
- Venue noise limits are enforced
Amsterdam operators live with real decibel and low frequency conditions on their permits, and the low end is what gets them into trouble. Containment is not optional here, it is the licence.
- Recycled content gets asked first
Our PET felt is made from recycled bottle flake. In Dutch tenders that question comes before the acoustic one, and it is the easiest one for us to answer honestly.
- The housing stock
Narrow terraced houses and canal buildings share party walls, with timber floors upstairs and concrete below. Neighbours on both sides is the default condition.
- The studio and content scene
Rooms are fitted into terraces and converted warehouses where the party wall decides what is achievable.
04 / Room by room
Space by space, for Amsterdam briefs
-

Isolation
A measured background level, agreed before anything is bought. Seventeenth century houses were built narrow and tall with timber floors on shared party walls. Footfall and speech travel down and sideways, which is why a resilient layer under the finish beats anything hung on a wall.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Soundproof curtains, 5.5 kg per sq m
-

Low frequency
Corner and boundary absorption with real depth, not surface foam. On a monument you cannot change the outside and often cannot change the structure. Everything has to be done from the inside, shallow, and ideally reversible.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Soundproof curtains, Up to 30 dB
-

Early reflections
Controlled at the mix position, and only there. Amsterdam operators live with real decibel and low frequency conditions on their permits, and the low end is what gets them into trouble. Containment is not optional here, it is the licence.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
- Soundproof curtains, 30
For a Amsterdam interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Conditions
What the Amsterdam climate rules in and rules out
Amsterdam is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
Where a consultant is already engaged on a Amsterdam project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Read this first
Six mistakes that turn into a second fit-out
-
Buying foam to solve an isolation problem
It sounds like a small detail until the room is finished and the complaint arrives.
-
Treating the room before the shell is isolated
This is the one that comes back as a second fit-out rather than a snag.
-
Killing the room completely and calling it controlled
We would rather calculate the area and sell you less of it than line every surface and call it thorough.
-
Treating it as a generic Amsterdam job
Seventeenth century houses were built narrow and tall with timber floors on shared party walls. Footfall and speech travel down and sideways, which is why a resilient layer under the finish beats anything hung on a wall.
05 / Logistics
How material reaches a Amsterdam site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Rotterdam, then a short road run into the city |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Rotterdam |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we tell you that before you order, not after.
Sea freight into Rotterdam, then road into Amsterdam. Being close to the port keeps the inland cost low. Air freight for samples and urgent quantities.
Questions from Amsterdam projects
What makes recording studio acoustics and soundproofing different in Amsterdam?
Rooms are fitted into terraces and converted warehouses where the party wall decides what is achievable. Seventeenth century houses were built narrow and tall with timber floors on shared party walls. Footfall and speech travel down and sideways, which is why a resilient layer under the finish beats anything hung on a wall.
Where should the budget go first on a Amsterdam project?
Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.
Do you have an office or installation team in Amsterdam?
No. We manufacture in India and supply into Amsterdam. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Amsterdam site?
ships from: Palwal, Haryana, India, arrives at: Rotterdam, then a short road run into the city, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we tell you that before you order, not after.
What goes wrong most often on this kind of project?
Buying foam to solve an isolation problem. Treating the room before the shell is isolated.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.