Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Church buildings, halls and auditoria are large hard volumes carrying amplified speech and music.
- Containment
- Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
- Table level comfort
- Absorption at the ceiling so guests stop raising their voices at each other.
- Entrance and service
- Doors, lobbies and extract paths, which is where most of the leakage actually is.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
What this material is and where it earns its place in South Korea
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.
Church buildings, halls and auditoria are large hard volumes carrying amplified speech and music.
Work reaching us from South Korea is mostly apartment towers, manufacturing plants, offices, hotels, schools, studios.
- Noise between floors is the issue Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
- Concrete towers throughout The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.
- Precise expectations Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.
- Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in South Korea.
Nightclub and venue soundproofing SoundBlanket mass loaded vinyl
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In South Korea, central plant and split units, with risers and duct runs carrying noise between floors.
Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
-

Layer 2
Wooden slat acoustic panels
Timber slats on an acoustic backing. In South Korea, church buildings, halls and auditoria are large hard volumes carrying amplified speech and music.
Feature wall only. Slats where they are seen, plain felt elsewhere, to hold the budget where it shows.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In South Korea, school and academy buildings are hard surfaced with long corridors and very intensive use.
Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
For a South Korea practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / Local conditions
What we see driving South Korea briefs
- Noise between floors is the issue
Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
- Concrete towers throughout
The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.
- Precise expectations
Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.
- Two strong ports
Busan and Incheon are both well served from India, so we route to whichever suits the site.
- Assembly and performance rooms
Church buildings, halls and auditoria are large hard volumes carrying amplified speech and music.
04 / Room by room
What each space in a South Korea project needs
-

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Wooden slat acoustic panels, 2440 x 192 mm and 2440 x 128 mm
-

Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other. The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Wooden slat acoustic panels, 14, 16 and 18 mm
-

Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is. Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Wooden slat acoustic panels, 96 sq ft per unit
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate and durability
Durability in South Korea, before acoustics is discussed
South Korea is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The failure we design against here is wet-season humidity behind linings.
On a South Korea job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
06 / Before you buy
Six mistakes that turn into a second fit-out
-
Panels on the wall as a neighbour noise solution
It sounds like a small detail until the room is finished and the complaint arrives.
-
A lobby with both doors able to open at once
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Extract ducting that bypasses every wall you built
Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.
-
Treating it as a generic South Korea job
Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
05 / Route to site
What the route into South Korea actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Busan or Incheon, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Busan |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Busan or Incheon, then road to site. Air freight for samples and urgent quantities.
Questions from South Korea projects
What makes venue and restaurant acoustics different in South Korea?
Church buildings, halls and auditoria are large hard volumes carrying amplified speech and music. Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
Where should the budget go first on a South Korea project?
Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.
Do you have an office or installation team in South Korea?
No. We manufacture in India and supply into South Korea. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a South Korea site?
ships from: Palwal, Haryana, India, arrives at: Busan or Incheon, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.