Home > South Korea > Office acoustics and soundproofing
For projects in South Korea
Office acoustics and soundproofing in South Korea
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Central plant and split units, with risers and duct runs carrying noise between floors.
- Open plan
- Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
- Meeting rooms
- Privacy between rooms. That is partition and door work, not panels.
- Cabins and calls
- Short RT so a call sounds clean. A small amount of well placed absorber.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this is, and what it changes in a South Korea room
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.
Central plant and split units, with risers and duct runs carrying noise between floors.
Work reaching us from South Korea is mostly apartment towers, manufacturing plants, offices, hotels, schools, studios.
- Noise between floors is the issue Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
- Concrete towers throughout The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.
- Precise expectations Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.
- Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in South Korea.
Office and conference room acoustics Acoustic office screens
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In South Korea, central plant and split units, with risers and duct runs carrying noise between floors.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In South Korea, church buildings, halls and auditoria are large hard volumes carrying amplified speech and music.
Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In South Korea, school and academy buildings are hard surfaced with long corridors and very intensive use.
Ceiling first. In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.
Architects working in South Korea usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / On the ground
What we see driving South Korea briefs
- Noise between floors is the issue
Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
- Concrete towers throughout
The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.
- Precise expectations
Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.
- Two strong ports
Busan and Incheon are both well served from India, so we route to whichever suits the site.
- Plant and HVAC
Central plant and split units, with risers and duct runs carrying noise between floors.
04 / Room by room
What each space in a South Korea project needs
-

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
- Ceiling baffles and clouds, 100% PET non-woven, the panel family
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
-

Meeting rooms
Privacy between rooms. That is partition and door work, not panels. The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.
- Ceiling baffles and clouds, 9 to 24 mm
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- SoundBlanket mass loaded vinyl, 12.6 kg per sq m, STC on request
-

Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber. Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.
- Ceiling baffles and clouds, Made to the drawing, standard and custom
- Acoustic panels, ASTM C423
- SoundBlanket mass loaded vinyl, 5 x 1.2 m, 6 sq m per roll
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate
Durability in South Korea, before acoustics is discussed
South Korea is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The failure we design against here is wet-season humidity behind linings.
Where a consultant is already engaged on a South Korea project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Worth knowing
The six errors that cost the most
-
Lining every wall while leaving the ceiling bare
A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.
-
Treating a privacy problem with absorption
If the complaint is being overheard, no amount of absorption inside the room will fix it. That is a partition job and we will say so.
-
Glass cabins specified without a door and head detail
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Treating it as a generic South Korea job
Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
05 / Getting it there
What the route into South Korea actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Busan or Incheon, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Busan |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Busan or Incheon, then road to site. Air freight for samples and urgent quantities.
Questions from South Korea projects
What makes office acoustics and soundproofing different in South Korea?
Central plant and split units, with risers and duct runs carrying noise between floors. Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
Where should the budget go first on a South Korea project?
Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.
Do you have an office or installation team in South Korea?
No. We manufacture in India and supply into South Korea. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a South Korea site?
ships from: Palwal, Haryana, India, arrives at: Busan or Incheon, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.