Home > South Korea > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in South Korea

HVAC, plant and machine noise control in South Korea

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Central plant and split units, with risers and duct runs carrying noise between floors.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / What it is

The product, described honestly, for a South Korea brief

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Central plant and split units, with risers and duct runs carrying noise between floors.

Work reaching us from South Korea is mostly apartment towers, manufacturing plants, offices, hotels, schools, studios.

  • Noise between floors is the issue Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
  • Concrete towers throughout The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.
  • Precise expectations Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in South Korea.

HVAC duct soundproofing Machine noise control

02 / The build-up

What goes where, from the structure in

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In South Korea, central plant and split units, with risers and duct runs carrying noise between floors.

    Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.

  2. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 2

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In South Korea, church buildings, halls and auditoria are large hard volumes carrying amplified speech and music.

    Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In South Korea, school and academy buildings are hard surfaced with long corridors and very intensive use.

    Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / What drives the brief

The South Korea conditions that change the answer

  • Noise between floors is the issue

    Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.

  • Concrete towers throughout

    The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.

  • Precise expectations

    Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.

  • Two strong ports

    Busan and Incheon are both well served from India, so we route to whichever suits the site.

  • Plant and HVAC

    Central plant and split units, with risers and duct runs carrying noise between floors.

04 / Room by room

Space by space, for South Korea briefs

  • Insulated HVAC ducts that need acoustic lagging

    At source

    Enclosure, barrier or anti vibration mounts at the machine. Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.

  • Air handling units in an industrial plant room

    In the path

    Duct lining, attenuators and lagging on the first run out of the plant. The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.

  • Boiler and pipework room that needs noise control

    At the receiver

    Only after the first two, and only for what is left. Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Climate and durability

The South Korea climate decides the material list

South Korea is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

06 / Straight talk

The six errors that cost the most

  • Absorption on the office wall for a plant room problem

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Ignoring structure borne vibration through the mounts

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating it as a generic South Korea job

    Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.

05 / Supply

Getting it to South Korea, with real dates

Supply into South Korea
Ships fromPalwal, Haryana, India
Arrives atBusan or Incheon, then road to site
Dispatch4 to 7 working days
FreightSea via Busan
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Busan or Incheon, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from South Korea projects

What makes HVAC, plant and machine noise control different in South Korea?

Central plant and split units, with risers and duct runs carrying noise between floors. Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.

Where should the budget go first on a South Korea project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in South Korea?

No. We manufacture in India and supply into South Korea. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a South Korea site?

ships from: Palwal, Haryana, India, arrives at: Busan or Incheon, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.