Home > South Korea > Recording studio acoustics and soundproofing

Recording studio with acoustic treatment and soundproofing

For projects in South Korea

Recording studio acoustics and soundproofing in South Korea

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A very large music and content industry with rooms built inside commercial buildings to measured targets.

Isolation
A measured background level, agreed before anything is bought.
Low frequency
Corner and boundary absorption with real depth, not surface foam.
Early reflections
Controlled at the mix position, and only there.
Quote
From a plan and a section, within 48 hours

01 / What it is

The product, described honestly, for a South Korea brief

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.

A very large music and content industry with rooms built inside commercial buildings to measured targets.

Work reaching us from South Korea is mostly apartment towers, manufacturing plants, offices, hotels, schools, studios.

  • Noise between floors is the issue Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.
  • Concrete towers throughout The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.
  • Precise expectations Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.
  • Isolation A measured background level, agreed before anything is bought.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in South Korea.

Recording studio soundproofing Acoustic foam and bass traps

02 / The build-up

What goes where, from the structure in

  1. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 1

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In South Korea, central plant and split units, with risers and duct runs carrying noise between floors.

    Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In South Korea, church buildings, halls and auditoria are large hard volumes carrying amplified speech and music.

    Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.

  3. ...

    Layer 3

    Soundproof curtains

    A layered curtain with a mass loaded vinyl core, used where an opening has to stay an opening. In South Korea, school and academy buildings are hard surfaced with long corridors and very intensive use.

    Full height with return. Curtain taken floor to soffit with a side return and an overlap, because the gap is what leaks, not the fabric.

For a South Korea practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / In this market

The South Korea conditions that change the answer

  • Noise between floors is the issue

    Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.

  • Concrete towers throughout

    The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.

  • Precise expectations

    Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.

  • Two strong ports

    Busan and Incheon are both well served from India, so we route to whichever suits the site.

  • The housing stock

    Reinforced concrete apartment towers with underfloor heating and hard floors. Impact noise between floors is the single biggest residential complaint.

  • The studio and content scene

    A very large music and content industry with rooms built inside commercial buildings to measured targets.

04 / Room by room

Room by room, on a typical South Korea job

  • Recording studio soundproof wall system

    Isolation

    A measured background level, agreed before anything is bought. Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.

  • Acoustic foam and panels in a recording studio

    Low frequency

    Corner and boundary absorption with real depth, not surface foam. The structure carries mass, so airborne transfer is rarely the problem. Structure-borne and impact paths are.

  • Studio door and control room window

    Early reflections

    Controlled at the mix position, and only there. Specifications here are written carefully and checked. Send us the target and we will say plainly what our material reaches.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Climate

Durability in South Korea, before acoustics is discussed

South Korea is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

On a South Korea job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Read this first

What we watch go wrong on jobs like this

  • Buying foam to solve an isolation problem

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating the room before the shell is isolated

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Killing the room completely and calling it controlled

    More absorption is not better absorption. Past the target the room goes flat and people raise their voices to compensate.

  • Treating it as a generic South Korea job

    Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.

05 / Route to site

Getting it to South Korea, with real dates

Supply into South Korea
Ships fromPalwal, Haryana, India
Arrives atBusan or Incheon, then road to site
Dispatch4 to 7 working days
FreightSea via Busan
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Busan or Incheon, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from South Korea projects

What makes recording studio acoustics and soundproofing different in South Korea?

A very large music and content industry with rooms built inside commercial buildings to measured targets. Impact from the flat above is the defining residential complaint in this market. It is a floor build-up question, and a ceiling treatment below will not answer it.

Where should the budget go first on a South Korea project?

Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.

Do you have an office or installation team in South Korea?

No. We manufacture in India and supply into South Korea. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a South Korea site?

ships from: Palwal, Haryana, India, arrives at: Busan or Incheon, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Buying foam to solve an isolation problem. Treating the room before the shell is isolated.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.