Home > Prague > Auditorium acoustics and soundproofing

Auditorium with acoustic panels and soundproofing

For projects in Prague

Auditorium acoustics and soundproofing in Prague

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Concert halls, church buildings and civic rooms are long-decay volumes in stone and plaster.

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Rear wall
The single worst surface in most halls, and the first one to treat.
Quote
From a plan and a section, within 48 hours

01 / What it is

The material, and what it actually does on a Prague job

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.

Concert halls, church buildings and civic rooms are long-decay volumes in stone and plaster.

Work reaching us from Prague is mostly hotel conversions, apartments, production and studio spaces, offices, restaurants, clinics.

  • Protected buildings, internal fixes only In the centre you often cannot alter the structure or the facade. The work has to be internal, shallow and ideally reversible, which rules out most thick framed systems.
  • Conversions into guest rooms Old buildings divided into hotel rooms and short lets put beds either side of walls that were never separating walls. Door and corridor details cause more complaints than anything else.
  • A production city Stages, edit rooms and post production spaces need the shell to isolate before anything else is decided. There is no partial credit on a room like that.
  • Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Prague.

Auditorium soundproofing Wood wool acoustic panels

02 / The build-up

The stack, in the order it is installed

  1. Acoustic wooden slat wall and ceiling in a premium auditorium

    Layer 1

    Wooden slat acoustic panels

    Timber slats on an acoustic backing. In Prague, mechanical ventilation in newer buildings and radiator heating in older stock, so duct noise is a newer problem than it looks.

    Slats on a cavity. Backing plus an air gap behind moves absorption lower, which matters in music rooms.

  2. PET acoustic felt wall panels in office interior

    Layer 2

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Prague, concert halls, church buildings and civic rooms are long-decay volumes in stone and plaster.

    Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.

  3. Acoustic carpet tiles and rugs on a modern floor

    Layer 3

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Prague, school buildings are hard surfaced with long corridors, and gymnasiums double as assembly halls.

    Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / Local conditions

What the buildings in Prague do to the specification

  • Protected buildings, internal fixes only

    In the centre you often cannot alter the structure or the facade. The work has to be internal, shallow and ideally reversible, which rules out most thick framed systems.

  • Conversions into guest rooms

    Old buildings divided into hotel rooms and short lets put beds either side of walls that were never separating walls. Door and corridor details cause more complaints than anything else.

  • A production city

    Stages, edit rooms and post production spaces need the shell to isolate before anything else is decided. There is no partial credit on a room like that.

  • Hard stone, long reverberation

    Stone, plaster and tile in tall rooms hold sound for a long time. Speech stops being intelligible well before the room sounds obviously wrong.

  • Assembly and performance rooms

    Concert halls, church buildings and civic rooms are long-decay volumes in stone and plaster.

  • School and campus buildings

    School buildings are hard surfaced with long corridors, and gymnasiums double as assembly halls.

04 / Room by room

Room by room, on a typical Prague job

  • Auditorium walls with wood wool, felt and wooden slats

    Reverberation time

    Set against use. Speech and music want different numbers, and a dual use hall needs a decision. In the centre you often cannot alter the structure or the facade. The work has to be internal, shallow and ideally reversible, which rules out most thick framed systems.

  • Auditorium ceiling with acoustic baffles and clouds

    Early reflections

    Shaped surfaces that send energy to the rear seats rather than absorbing everything. Old buildings divided into hotel rooms and short lets put beds either side of walls that were never separating walls. Door and corridor details cause more complaints than anything else.

  • Auditorium floor with acoustic carpeting

    Rear wall

    The single worst surface in most halls, and the first one to treat. Stages, edit rooms and post production spaces need the shell to isolate before anything else is decided. There is no partial credit on a room like that.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Climate and durability

Durability in Prague, before acoustics is discussed

Prague is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The failure we design against here is condensation behind linings in older, poorly insulated stock.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Straight talk

Where this kind of project usually fails

  • Absorbing the whole room and losing the back rows

    Small on the drawing, expensive on site, and almost always found after handover.

  • Adding speakers to fix a reverberation problem

    Small on the drawing, expensive on site, and almost always found after handover.

  • Ignoring the rear wall because it is behind the audience

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating it as a generic Prague job

    In the centre you often cannot alter the structure or the facade. The work has to be internal, shallow and ideally reversible, which rules out most thick framed systems.

05 / Route to site

What the route into Prague actually looks like

Supply into Prague
Ships fromPalwal, Haryana, India
Arrives atHamburg, then rail and road into Prague
Dispatch4 to 7 working days
FreightSea via Hamburg
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Hamburg, then rail and road into Prague. Air freight for samples and urgent quantities.

FAQ

Questions from Prague projects

What makes auditorium acoustics and soundproofing different in Prague?

Concert halls, church buildings and civic rooms are long-decay volumes in stone and plaster. In the centre you often cannot alter the structure or the facade. The work has to be internal, shallow and ideally reversible, which rules out most thick framed systems.

Where should the budget go first on a Prague project?

Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.

Do you have an office or installation team in Prague?

No. We manufacture in India and supply into Prague. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Prague site?

ships from: Palwal, Haryana, India, arrives at: Hamburg, then rail and road into Prague, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.