Home > Prague > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Prague

HVAC, plant and machine noise control in Prague

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Mechanical ventilation in newer buildings and radiator heating in older stock, so duct noise is a newer problem than it looks.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / The material

What this is, and what it changes in a Prague room

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Mechanical ventilation in newer buildings and radiator heating in older stock, so duct noise is a newer problem than it looks.

Work reaching us from Prague is mostly hotel conversions, apartments, production and studio spaces, offices, restaurants, clinics.

  • Protected buildings, internal fixes only In the centre you often cannot alter the structure or the facade. The work has to be internal, shallow and ideally reversible, which rules out most thick framed systems.
  • Conversions into guest rooms Old buildings divided into hotel rooms and short lets put beds either side of walls that were never separating walls. Door and corridor details cause more complaints than anything else.
  • A production city Stages, edit rooms and post production spaces need the shell to isolate before anything else is decided. There is no partial credit on a room like that.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Prague.

HVAC duct soundproofing Machine noise control

02 / The build-up

How the layers stack, from the structure inwards

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Prague, mechanical ventilation in newer buildings and radiator heating in older stock, so duct noise is a newer problem than it looks.

    Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.

  2. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 2

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Prague, concert halls, church buildings and civic rooms are long-decay volumes in stone and plaster.

    Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Prague, school buildings are hard surfaced with long corridors, and gymnasiums double as assembly halls.

    Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.

If you are specifying for a Prague project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / In this market

What we see driving Prague briefs

  • Protected buildings, internal fixes only

    In the centre you often cannot alter the structure or the facade. The work has to be internal, shallow and ideally reversible, which rules out most thick framed systems.

  • Conversions into guest rooms

    Old buildings divided into hotel rooms and short lets put beds either side of walls that were never separating walls. Door and corridor details cause more complaints than anything else.

  • A production city

    Stages, edit rooms and post production spaces need the shell to isolate before anything else is decided. There is no partial credit on a room like that.

  • Hard stone, long reverberation

    Stone, plaster and tile in tall rooms hold sound for a long time. Speech stops being intelligible well before the room sounds obviously wrong.

  • Plant and HVAC

    Mechanical ventilation in newer buildings and radiator heating in older stock, so duct noise is a newer problem than it looks.

04 / Room by room

Room by room, on a typical Prague job

For a Prague interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate and durability

Why the climate in Prague changes the material, not the target

Prague is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The failure we design against here is condensation behind linings in older, poorly insulated stock.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Before you buy

Where this kind of project usually fails

  • Absorption on the office wall for a plant room problem

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Ignoring structure borne vibration through the mounts

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating it as a generic Prague job

    In the centre you often cannot alter the structure or the facade. The work has to be internal, shallow and ideally reversible, which rules out most thick framed systems.

05 / Route to site

Supply into Prague, start to site

Supply into Prague
Ships fromPalwal, Haryana, India
Arrives atHamburg, then rail and road into Prague
Dispatch4 to 7 working days
FreightSea via Hamburg
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Hamburg, then rail and road into Prague. Air freight for samples and urgent quantities.

FAQ

Questions from Prague projects

What makes HVAC, plant and machine noise control different in Prague?

Mechanical ventilation in newer buildings and radiator heating in older stock, so duct noise is a newer problem than it looks. In the centre you often cannot alter the structure or the facade. The work has to be internal, shallow and ideally reversible, which rules out most thick framed systems.

Where should the budget go first on a Prague project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Prague?

No. We manufacture in India and supply into Prague. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Prague site?

ships from: Palwal, Haryana, India, arrives at: Hamburg, then rail and road into Prague, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.