For projects in Ireland
Venue and restaurant acoustics in Ireland
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Church buildings, parish halls and school halls carry speech and music in the same hard volume.
- Containment
- Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
- Table level comfort
- Absorption at the ceiling so guests stop raising their voices at each other.
- Entrance and service
- Doors, lobbies and extract paths, which is where most of the leakage actually is.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The product, described honestly, for a Ireland brief
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.
Church buildings, parish halls and school halls carry speech and music in the same hard volume.
Work reaching us from Ireland is mostly apartment schemes, plant and industrial buildings, offices, schools, clinics, studios.
- New build means decisions are still open Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
- Apartment schemes at scale The same separating wall repeated across hundreds of units. A detail that is slightly wrong is wrong everywhere, so consistency matters more than the headline figure.
- Industrial and plant noise Process plant, generators and cooling equipment sit close to occupied space and close to neighbours. That is a mass and isolation job, not an absorption job.
- Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Ireland.
Nightclub and venue soundproofing SoundBlanket mass loaded vinyl
02 / The build-up
The build-up, layer by layer
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Ireland, heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Ireland, church buildings, parish halls and school halls carry speech and music in the same hard volume.
Ceiling first. In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Ireland, school buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building.
Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.
For a Ireland practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / In this market
What we see driving Ireland briefs
- New build means decisions are still open
Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
- Apartment schemes at scale
The same separating wall repeated across hundreds of units. A detail that is slightly wrong is wrong everywhere, so consistency matters more than the headline figure.
- Industrial and plant noise
Process plant, generators and cooling equipment sit close to occupied space and close to neighbours. That is a mass and isolation job, not an absorption job.
- Damp, mild climate
Our PET felt does not absorb moisture, shed fibre or feed mould, which matters on cold external walls and in sealed rooms.
- Assembly and performance rooms
Church buildings, parish halls and school halls carry speech and music in the same hard volume.
04 / Room by room
What each space in a Ireland project needs
-

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
- Soundproofing materials, 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Wooden slat acoustic panels, 2440 x 192 mm and 2440 x 128 mm
-

Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other. The same separating wall repeated across hundreds of units. A detail that is slightly wrong is wrong everywhere, so consistency matters more than the headline figure.
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Wooden slat acoustic panels, 14, 16 and 18 mm
-

Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is. Process plant, generators and cooling equipment sit close to occupied space and close to neighbours. That is a mass and isolation job, not an absorption job.
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic panels, ASTM C423
- Wooden slat acoustic panels, 96 sq ft per unit
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Durability
The Ireland climate decides the material list
Ireland is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Read this first
Where this kind of project usually fails
-
Panels on the wall as a neighbour noise solution
It sounds like a small detail until the room is finished and the complaint arrives.
-
A lobby with both doors able to open at once
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Extract ducting that bypasses every wall you built
Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.
-
Treating it as a generic Ireland job
Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
05 / Logistics
Getting it to Ireland, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Dublin or Cork, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Dublin or Cork |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Dublin or Cork, then road to site. Air freight for samples and urgent quantities.
Questions from Ireland projects
What makes venue and restaurant acoustics different in Ireland?
Church buildings, parish halls and school halls carry speech and music in the same hard volume. Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
Where should the budget go first on a Ireland project?
Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.
Do you have an office or installation team in Ireland?
No. We manufacture in India and supply into Ireland. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Ireland site?
ships from: Palwal, Haryana, India, arrives at: Dublin or Cork, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.