For projects in Ireland
Office acoustics and soundproofing in Ireland
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
- Open plan
- Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
- Meeting rooms
- Privacy between rooms. That is partition and door work, not panels.
- Cabins and calls
- Short RT so a call sounds clean. A small amount of well placed absorber.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
What this is, and what it changes in a Ireland room
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.
Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
Work reaching us from Ireland is mostly apartment schemes, plant and industrial buildings, offices, schools, clinics, studios.
- New build means decisions are still open Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
- Apartment schemes at scale The same separating wall repeated across hundreds of units. A detail that is slightly wrong is wrong everywhere, so consistency matters more than the headline figure.
- Industrial and plant noise Process plant, generators and cooling equipment sit close to occupied space and close to neighbours. That is a mass and isolation job, not an absorption job.
- Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Ireland.
Office and conference room acoustics Acoustic office screens
02 / The build-up
What goes where, from the structure in
-

Layer 1
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Ireland, heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Ireland, church buildings, parish halls and school halls carry speech and music in the same hard volume.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
-

Layer 3
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Ireland, school buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
If you are specifying for a Ireland project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / On the ground
What decides the build-up in Ireland
- New build means decisions are still open
Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
- Apartment schemes at scale
The same separating wall repeated across hundreds of units. A detail that is slightly wrong is wrong everywhere, so consistency matters more than the headline figure.
- Industrial and plant noise
Process plant, generators and cooling equipment sit close to occupied space and close to neighbours. That is a mass and isolation job, not an absorption job.
- Damp, mild climate
Our PET felt does not absorb moisture, shed fibre or feed mould, which matters on cold external walls and in sealed rooms.
- Plant and HVAC
Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
04 / Room by room
What each space in a Ireland project needs
-

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
- Ceiling baffles and clouds, 100% PET non-woven, the panel family
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
-

Meeting rooms
Privacy between rooms. That is partition and door work, not panels. The same separating wall repeated across hundreds of units. A detail that is slightly wrong is wrong everywhere, so consistency matters more than the headline figure.
- Ceiling baffles and clouds, 9 to 24 mm
- PET felt acoustic panels, 4 to 24 mm
- SoundBlanket mass loaded vinyl, 12.6 kg per sq m, STC on request
-

Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber. Process plant, generators and cooling equipment sit close to occupied space and close to neighbours. That is a mass and isolation job, not an absorption job.
- Ceiling baffles and clouds, Made to the drawing, standard and custom
- PET felt acoustic panels, 1220 x 2440 mm standard, 4 x 8 ft
- SoundBlanket mass loaded vinyl, 5 x 1.2 m, 6 sq m per roll
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Climate
What the Ireland climate rules in and rules out
Ireland is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Before you buy
Six mistakes that turn into a second fit-out
-
Lining every wall while leaving the ceiling bare
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating a privacy problem with absorption
If the complaint is being overheard, no amount of absorption inside the room will fix it. That is a partition job and we will say so.
-
Glass cabins specified without a door and head detail
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Treating it as a generic Ireland job
Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
05 / Logistics
What the route into Ireland actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Dublin or Cork, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Dublin or Cork |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Dublin or Cork, then road to site. Air freight for samples and urgent quantities.
Questions from Ireland projects
What makes office acoustics and soundproofing different in Ireland?
Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries. Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
Where should the budget go first on a Ireland project?
Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.
Do you have an office or installation team in Ireland?
No. We manufacture in India and supply into Ireland. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Ireland site?
ships from: Palwal, Haryana, India, arrives at: Dublin or Cork, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.