For projects in Ireland
HVAC, plant and machine noise control in Ireland
Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
- At source
- Enclosure, barrier or anti vibration mounts at the machine.
- In the path
- Duct lining, attenuators and lagging on the first run out of the plant.
- At the receiver
- Only after the first two, and only for what is left.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The product, described honestly, for a Ireland brief
Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.
Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
Work reaching us from Ireland is mostly apartment schemes, plant and industrial buildings, offices, schools, clinics, studios.
- New build means decisions are still open Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
- Apartment schemes at scale The same separating wall repeated across hundreds of units. A detail that is slightly wrong is wrong everywhere, so consistency matters more than the headline figure.
- Industrial and plant noise Process plant, generators and cooling equipment sit close to occupied space and close to neighbours. That is a mass and isolation job, not an absorption job.
- At source Enclosure, barrier or anti vibration mounts at the machine.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Ireland.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Ireland, heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.
-

Layer 2
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Ireland, church buildings, parish halls and school halls carry speech and music in the same hard volume.
Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.
-

Layer 3
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Ireland, school buildings run hard floors and lay-in ceilings with long corridors, and sports halls are the worst rooms in the building.
Horizontal clouds. Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.
Architects working in Ireland usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / Local conditions
What the buildings in Ireland do to the specification
- New build means decisions are still open
Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
- Apartment schemes at scale
The same separating wall repeated across hundreds of units. A detail that is slightly wrong is wrong everywhere, so consistency matters more than the headline figure.
- Industrial and plant noise
Process plant, generators and cooling equipment sit close to occupied space and close to neighbours. That is a mass and isolation job, not an absorption job.
- Damp, mild climate
Our PET felt does not absorb moisture, shed fibre or feed mould, which matters on cold external walls and in sealed rooms.
- Plant and HVAC
Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries.
04 / Room by room
What each space in a Ireland project needs
-

At source
Enclosure, barrier or anti vibration mounts at the machine. Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
- Soundproofing materials, 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- Wood wool acoustic panels, 20 mm
- Acoustic foam and BassBloc, 100 kg per cubic metre
-

In the path
Duct lining, attenuators and lagging on the first run out of the plant. The same separating wall repeated across hundreds of units. A detail that is slightly wrong is wrong everywhere, so consistency matters more than the headline figure.
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Wood wool acoustic panels, 400 kg per cubic metre
- Acoustic foam and BassBloc, 100 to 500 Hz
-

At the receiver
Only after the first two, and only for what is left. Process plant, generators and cooling equipment sit close to occupied space and close to neighbours. That is a mass and isolation job, not an absorption job.
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Wood wool acoustic panels, 0.30
- Acoustic foam and BassBloc, 0.85
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Durability
The Ireland climate decides the material list
Ireland is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Before you buy
What we watch go wrong on jobs like this
-
Absorption on the office wall for a plant room problem
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Lagging a duct that is carrying the noise as breakout from the fan
Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.
-
Ignoring structure borne vibration through the mounts
Small on the drawing, expensive on site, and almost always found after handover.
-
Treating it as a generic Ireland job
Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
05 / Logistics
Supply into Ireland, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Dublin or Cork, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Dublin or Cork |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Dublin or Cork, then road to site. Air freight for samples and urgent quantities.
Questions from Ireland projects
What makes HVAC, plant and machine noise control different in Ireland?
Heat pumps and mechanical ventilation in newer stock, with outdoor units close to boundaries. Isolation designed into the drawing costs a fraction of retrofitting it after handover. Send the sections early and we will mark where a build-up will disappoint.
Where should the budget go first on a Ireland project?
At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.
Do you have an office or installation team in Ireland?
No. We manufacture in India and supply into Ireland. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Ireland site?
ships from: Palwal, Haryana, India, arrives at: Dublin or Cork, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.