For projects in Hong Kong
Office acoustics and soundproofing in Hong Kong
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Central plant, split units and VRF packed into light wells and podium decks close to every flat.
- Open plan
- Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
- Meeting rooms
- Privacy between rooms. That is partition and door work, not panels.
- Cabins and calls
- Short RT so a call sounds clean. A small amount of well placed absorber.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The material, and what it actually does on a Hong Kong job
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.
Central plant, split units and VRF packed into light wells and podium decks close to every flat.
Work reaching us from Hong Kong is mostly apartments, offices, hotels and dining, clinics, schools, studios.
- Depth is the expensive part Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.
- Concrete towers, live rooms The structure blocks a great deal already. The problem is hard interiors and impact through slabs rather than airborne transfer.
- Plant on every roof and podium Cooling plant sits within metres of windows in a dense city, so plant noise reaches more people than any single source.
- Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Hong Kong.
Office and conference room acoustics Acoustic office screens
02 / The build-up
What goes where, from the structure in
-

Layer 1
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Hong Kong, central plant, split units and VRF packed into light wells and podium decks close to every flat.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
-

Layer 2
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Hong Kong, church buildings, halls and function rooms are compact hard volumes carrying amplified speech.
Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.
-

Layer 3
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Hong Kong, school buildings are compact and hard surfaced with very intensive use and no spare volume.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
Architects working in Hong Kong usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / In this market
What decides the build-up in Hong Kong
- Depth is the expensive part
Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.
- Concrete towers, live rooms
The structure blocks a great deal already. The problem is hard interiors and impact through slabs rather than airborne transfer.
- Plant on every roof and podium
Cooling plant sits within metres of windows in a dense city, so plant noise reaches more people than any single source.
- The port is right here
Direct sea into Hong Kong keeps the chain short and the landed cost predictable.
- Plant and HVAC
Central plant, split units and VRF packed into light wells and podium decks close to every flat.
04 / Room by room
Room by room, on a typical Hong Kong job
-

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.
- PET felt acoustic panels, 100% PET non-woven, no added binder
- Acoustic carpet and rugs, 4 mm
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Meeting rooms
Privacy between rooms. That is partition and door work, not panels. The structure blocks a great deal already. The problem is hard interiors and impact through slabs rather than airborne transfer.
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Acoustic carpet and rugs, High density polyester
- Acoustic panels, ASTM C423
-

Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber. Cooling plant sits within metres of windows in a dense city, so plant noise reaches more people than any single source.
- PET felt acoustic panels, 4 to 24 mm
- Acoustic carpet and rugs, Felt
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate and durability
Durability in Hong Kong, before acoustics is discussed
Hong Kong is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The failure we design against here is wet-season humidity behind linings.
Where a consultant is already engaged on a Hong Kong project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Before you buy
What we watch go wrong on jobs like this
-
Lining every wall while leaving the ceiling bare
A treated wall under a bare hard ceiling gives you a fraction of the reduction you paid for, and the room still sounds wrong.
-
Treating a privacy problem with absorption
Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.
-
Glass cabins specified without a door and head detail
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Treating it as a generic Hong Kong job
Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.
05 / Logistics
What the route into Hong Kong actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Hong Kong, then a short road run to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea into Hong Kong |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight direct into Hong Kong, then a short road run to site. Air freight for samples and urgent quantities.
Questions from Hong Kong projects
What makes office acoustics and soundproofing different in Hong Kong?
Central plant, split units and VRF packed into light wells and podium decks close to every flat. Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.
Where should the budget go first on a Hong Kong project?
Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.
Do you have an office or installation team in Hong Kong?
No. We manufacture in India and supply into Hong Kong. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Hong Kong site?
ships from: Palwal, Haryana, India, arrives at: Hong Kong, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.