Home > Hong Kong > Hospital and healthcare acoustics

Hospital corridor with acoustic ceiling and wall treatment

For projects in Hong Kong

Hospital and healthcare acoustics in Hong Kong

Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. Central plant, split units and VRF packed into light wells and podium decks close to every flat.

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work.
Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime.
Quote
From a plan and a section, within 48 hours

01 / Start here

The material, and what it actually does on a Hong Kong job

Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.

Central plant, split units and VRF packed into light wells and podium decks close to every flat.

Work reaching us from Hong Kong is mostly apartments, offices, hotels and dining, clinics, schools, studios.

  • Depth is the expensive part Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.
  • Concrete towers, live rooms The structure blocks a great deal already. The problem is hard interiors and impact through slabs rather than airborne transfer.
  • Plant on every roof and podium Cooling plant sits within metres of windows in a dense city, so plant noise reaches more people than any single source.
  • Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in Hong Kong.

Hospital soundproofing

02 / The build-up

What goes where, from the structure in

  1. PET acoustic felt wall panels in office interior

    Layer 1

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Hong Kong, central plant, split units and VRF packed into light wells and podium decks close to every flat.

    On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.

  2. Acoustic hanging ceiling baffles in a large open space

    Layer 2

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Hong Kong, church buildings, halls and function rooms are compact hard volumes carrying amplified speech.

    Horizontal clouds. Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.

  3. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 3

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Hong Kong, school buildings are compact and hard surfaced with very intensive use and no spare volume.

    Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.

Architects working in Hong Kong usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / Local conditions

What the buildings in Hong Kong do to the specification

  • Depth is the expensive part

    Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.

  • Concrete towers, live rooms

    The structure blocks a great deal already. The problem is hard interiors and impact through slabs rather than airborne transfer.

  • Plant on every roof and podium

    Cooling plant sits within metres of windows in a dense city, so plant noise reaches more people than any single source.

  • The port is right here

    Direct sea into Hong Kong keeps the chain short and the landed cost predictable.

  • Plant and HVAC

    Central plant, split units and VRF packed into light wells and podium decks close to every flat.

04 / Room by room

What each space in a Hong Kong project needs

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Climate and durability

Durability in Hong Kong, before acoustics is discussed

Hong Kong is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

06 / Straight talk

Where this kind of project usually fails

  • Fabric wrapped products in a clinical area

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Absorption used where privacy was the requirement

    Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.

  • Ceiling void left open above a partition

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating it as a generic Hong Kong job

    Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.

05 / Logistics

Getting it to Hong Kong, with real dates

Supply into Hong Kong
Ships fromPalwal, Haryana, India
Arrives atHong Kong, then a short road run to site
Dispatch4 to 7 working days
FreightSea into Hong Kong
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight direct into Hong Kong, then a short road run to site. Air freight for samples and urgent quantities.

FAQ

Questions from Hong Kong projects

What makes hospital and healthcare acoustics different in Hong Kong?

Central plant, split units and VRF packed into light wells and podium decks close to every flat. Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.

Where should the budget go first on a Hong Kong project?

Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.

Do you have an office or installation team in Hong Kong?

No. We manufacture in India and supply into Hong Kong. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Hong Kong site?

ships from: Palwal, Haryana, India, arrives at: Hong Kong, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.

script src="/assets/vendor/glightbox/js/glightbox.min.js">