Home > Hong Kong > School and classroom acoustics

Modern school classroom with felt acoustic panels on walls

For projects in Hong Kong

School and classroom acoustics in Hong Kong

Hard floors, bare walls and long corridors that amplify everything. Children with developing language, and anyone with a hearing difficulty, lose more from a live classroom than adults do, which is why intelligibility is the target rather than quiet. School buildings are compact and hard surfaced with very intensive use and no spare volume.

Classroom RT
A number, set against room volume, achieved mostly at the ceiling.
Corridor spill
Long hard circulation feeds every room off it. Treating the corridor helps every classroom at once.
Halls and gyms
Dual use rooms carrying speech, music and sport, where durability decides the product.
Quote
From a plan and a section, within 48 hours

01 / What it is

The material, and what it actually does on a Hong Kong job

Hard floors, bare walls and long corridors that amplify everything. Children with developing language, and anyone with a hearing difficulty, lose more from a live classroom than adults do, which is why intelligibility is the target rather than quiet.

School buildings are compact and hard surfaced with very intensive use and no spare volume.

Work reaching us from Hong Kong is mostly apartments, offices, hotels and dining, clinics, schools, studios.

  • Depth is the expensive part Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.
  • Concrete towers, live rooms The structure blocks a great deal already. The problem is hard interiors and impact through slabs rather than airborne transfer.
  • Plant on every roof and podium Cooling plant sits within metres of windows in a dense city, so plant noise reaches more people than any single source.
  • Classroom RT A number, set against room volume, achieved mostly at the ceiling.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for school acoustics are on the main product page. This page covers what that means for a project in Hong Kong.

School and classroom acoustics PET felt acoustic panels

02 / The build-up

What goes where, from the structure in

  1. PET acoustic felt wall panels in office interior

    Layer 1

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Hong Kong, central plant, split units and VRF packed into light wells and podium decks close to every flat.

    On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.

  2. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 2

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Hong Kong, church buildings, halls and function rooms are compact hard volumes carrying amplified speech.

    Direct fix. Mechanically fixed to the soffit or wall. Durable and simple.

  3. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 3

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Hong Kong, school buildings are compact and hard surfaced with very intensive use and no spare volume.

    Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.

Architects working in Hong Kong usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / In this market

What decides the build-up in Hong Kong

  • Depth is the expensive part

    Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.

  • Concrete towers, live rooms

    The structure blocks a great deal already. The problem is hard interiors and impact through slabs rather than airborne transfer.

  • Plant on every roof and podium

    Cooling plant sits within metres of windows in a dense city, so plant noise reaches more people than any single source.

  • The port is right here

    Direct sea into Hong Kong keeps the chain short and the landed cost predictable.

  • Assembly and performance rooms

    Church buildings, halls and function rooms are compact hard volumes carrying amplified speech.

  • School and campus buildings

    School buildings are compact and hard surfaced with very intensive use and no spare volume.

04 / Room by room

Room by room, on a typical Hong Kong job

  • Classroom walls treated with felt acoustic panels

    Classroom RT

    A number, set against room volume, achieved mostly at the ceiling. Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.

  • Library with felt acoustic panels

    Corridor spill

    Long hard circulation feeds every room off it. Treating the corridor helps every classroom at once. The structure blocks a great deal already. The problem is hard interiors and impact through slabs rather than airborne transfer.

  • School corridor treated with felt acoustic panels

    Halls and gyms

    Dual use rooms carrying speech, music and sport, where durability decides the product. Cooling plant sits within metres of windows in a dense city, so plant noise reaches more people than any single source.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Climate

Durability in Hong Kong, before acoustics is discussed

Hong Kong is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

06 / Read this first

The six errors that cost the most

  • Panels at child height where they get damaged

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating one classroom and leaving the corridor

    Small on the drawing, expensive on site, and almost always found after handover.

  • Choosing a product that cannot take a football

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Treating it as a generic Hong Kong job

    Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.

05 / Getting it there

How material reaches a Hong Kong site

Supply into Hong Kong
Ships fromPalwal, Haryana, India
Arrives atHong Kong, then a short road run to site
Dispatch4 to 7 working days
FreightSea into Hong Kong
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight direct into Hong Kong, then a short road run to site. Air freight for samples and urgent quantities.

FAQ

Questions from Hong Kong projects

What makes school and classroom acoustics different in Hong Kong?

School buildings are compact and hard surfaced with very intensive use and no spare volume. Every millimetre a wall grows into the room is paid for at Hong Kong rates. A dense thin membrane usually beats a thicker framed build-up here on total cost.

Where should the budget go first on a Hong Kong project?

Classroom RT. A number, set against room volume, achieved mostly at the ceiling. Corridor spill. Long hard circulation feeds every room off it. Treating the corridor helps every classroom at once.

Do you have an office or installation team in Hong Kong?

No. We manufacture in India and supply into Hong Kong. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Hong Kong site?

ships from: Palwal, Haryana, India, arrives at: Hong Kong, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Panels at child height where they get damaged. Treating one classroom and leaving the corridor.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.