Home > Ho Chi Minh City > Home theatre soundproofing and acoustics

Luxury home theatre with acoustic panels and soundproofing

For projects in Ho Chi Minh City

Home theatre soundproofing and acoustics in Ho Chi Minh City

Serious equipment in a room with no isolation plan. The complaint is almost never the speakers. It is bass leaving the room and an untreated box making the system sound worse than it is. Tube houses and apartment towers in concrete and block, sharing walls with neighbours on both sides and hard floors throughout.

Containment
Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point.
Low frequency inside
Corner absorption with depth, before any surface treatment.
Reflections
Side wall and ceiling first reflection points at the seating position.
Quote
From a plan and a section, within 48 hours

01 / What it is

The material, and what it actually does on a Ho Chi Minh City job

Serious equipment in a room with no isolation plan. The complaint is almost never the speakers. It is bass leaving the room and an untreated box making the system sound worse than it is.

Tube houses and apartment towers in concrete and block, sharing walls with neighbours on both sides and hard floors throughout.

Work reaching us from Ho Chi Minh City is mostly tube houses and apartments, towers and offices, manufacturing, hotels, schools, clinics.

  • Narrow, deep, shared on both sides The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
  • Traffic never stops Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.
  • New towers, hard interiors Concrete frames with tile and glass inside. The structure blocks, the room rings.
  • Containment Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for home theatre soundproofing are on the main product page. This page covers what that means for a project in Ho Chi Minh City.

Home theatre soundproofing SoundBlanket mass loaded vinyl

02 / The build-up

The stack, in the order it is installed

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Ho Chi Minh City, split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

    Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.

  2. ...

    Layer 2

    Soundproof curtains

    A layered curtain with a mass loaded vinyl core, used where an opening has to stay an opening. In Ho Chi Minh City, function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

    Double layer at a doorway. Two curtains with an air gap where a single layer will not reach the target.

  3. Acoustic carpet tiles and rugs on a modern floor

    Layer 3

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Ho Chi Minh City, classrooms are hard, naturally ventilated and open to street noise, with large class sizes.

    Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.

For a Ho Chi Minh City practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / In this market

What we see driving Ho Chi Minh City briefs

  • Narrow, deep, shared on both sides

    The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.

  • Traffic never stops

    Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.

  • New towers, hard interiors

    Concrete frames with tile and glass inside. The structure blocks, the room rings.

  • Tropical humidity all year

    PET felt does not hold moisture or feed mould, which matters where mineral products sag within a couple of seasons.

  • The housing stock

    Tube houses and apartment towers in concrete and block, sharing walls with neighbours on both sides and hard floors throughout.

04 / Room by room

What each space in a Ho Chi Minh City project needs

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Durability

Why the climate in Ho Chi Minh City changes the material, not the target

Ho Chi Minh City is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

Where a consultant is already engaged on a Ho Chi Minh City project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Before you buy

The six errors that cost the most

  • Foam on the walls as a soundproofing measure

    Small on the drawing, expensive on site, and almost always found after handover.

  • A standard door on a room built to hold bass

    A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.

  • Treating before the room is sealed

    A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.

  • Treating it as a generic Ho Chi Minh City job

    The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.

05 / Route to site

What the route into Ho Chi Minh City actually looks like

Supply into Ho Chi Minh City
Ships fromPalwal, Haryana, India
Arrives atCat Lai or Cai Mep, then a short road run into the city
Dispatch4 to 7 working days
FreightSea via Cat Lai or Cai Mep
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Cat Lai or Cai Mep, then a short road run into the city. Air freight for samples and urgent quantities.

FAQ

Questions from Ho Chi Minh City projects

What makes home theatre soundproofing and acoustics different in Ho Chi Minh City?

Tube houses and apartment towers in concrete and block, sharing walls with neighbours on both sides and hard floors throughout. The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.

Where should the budget go first on a Ho Chi Minh City project?

Containment. Bass through the wall, floor and door. Mass and decoupling, with the door usually the weakest point. Low frequency inside. Corner absorption with depth, before any surface treatment.

Do you have an office or installation team in Ho Chi Minh City?

No. We manufacture in India and supply into Ho Chi Minh City. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Ho Chi Minh City site?

ships from: Palwal, Haryana, India, arrives at: Cat Lai or Cai Mep, then a short road run into the city, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Foam on the walls as a soundproofing measure. A standard door on a room built to hold bass.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.

script src="/assets/vendor/glightbox/js/glightbox.min.js">