Home > Ho Chi Minh City > Cinema and multiplex soundproofing

Premium multiplex cinema auditorium with acoustic treatment

For projects in Ho Chi Minh City

Cinema and multiplex soundproofing in Ho Chi Minh City

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

Screen to screen
Independent construction between auditoria, with services broken at the line.
In room response
Heavy absorption on side and rear walls so the mix is heard as intended.
Plant and projection
Equipment noise into the auditorium, treated at source.
Quote
From a plan and a section, within 48 hours

01 / The product

What you are buying, and what it fixes in Ho Chi Minh City

Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.

Function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

Work reaching us from Ho Chi Minh City is mostly tube houses and apartments, towers and offices, manufacturing, hotels, schools, clinics.

  • Narrow, deep, shared on both sides The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
  • Traffic never stops Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.
  • New towers, hard interiors Concrete frames with tile and glass inside. The structure blocks, the room rings.
  • Screen to screen Independent construction between auditoria, with services broken at the line.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Ho Chi Minh City.

Multiplex and cinema soundproofing

02 / The build-up

What goes where, from the structure in

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Ho Chi Minh City, split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  2. Acoustic carpet tiles and rugs on a modern floor

    Layer 2

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Ho Chi Minh City, function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

    Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.

  3. PET acoustic felt wall panels in office interior

    Layer 3

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Ho Chi Minh City, classrooms are hard, naturally ventilated and open to street noise, with large class sizes.

    Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.

Architects working in Ho Chi Minh City usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / What drives the brief

The Ho Chi Minh City conditions that change the answer

  • Narrow, deep, shared on both sides

    The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.

  • Traffic never stops

    Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.

  • New towers, hard interiors

    Concrete frames with tile and glass inside. The structure blocks, the room rings.

  • Tropical humidity all year

    PET felt does not hold moisture or feed mould, which matters where mineral products sag within a couple of seasons.

  • Assembly and performance rooms

    Function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

04 / Room by room

Room by room, on a typical Ho Chi Minh City job

  • Cinema hall with acoustic fabric wall system

    Screen to screen

    Independent construction between auditoria, with services broken at the line. The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.

  • Felt acoustic panels in multiplex cinema

    In room response

    Heavy absorption on side and rear walls so the mix is heard as intended. Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.

  • Acoustic foams and bass traps in cinema hall

    Plant and projection

    Equipment noise into the auditorium, treated at source. Concrete frames with tile and glass inside. The structure blocks, the room rings.

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Durability

Why the climate in Ho Chi Minh City changes the material, not the target

Ho Chi Minh City is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

On a Ho Chi Minh City job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Worth knowing

Where this kind of project usually fails

  • A shared service void running across the wall line

    The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.

  • Treating the auditorium to fix bleed from the next screen

    Small on the drawing, expensive on site, and almost always found after handover.

  • Doors and lobbies specified late and undersized

    A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.

  • Treating it as a generic Ho Chi Minh City job

    The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.

05 / Route to site

Supply into Ho Chi Minh City, start to site

Supply into Ho Chi Minh City
Ships fromPalwal, Haryana, India
Arrives atCat Lai or Cai Mep, then a short road run into the city
Dispatch4 to 7 working days
FreightSea via Cat Lai or Cai Mep
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Cat Lai or Cai Mep, then a short road run into the city. Air freight for samples and urgent quantities.

FAQ

Questions from Ho Chi Minh City projects

What makes cinema and multiplex soundproofing different in Ho Chi Minh City?

Function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music. The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.

Where should the budget go first on a Ho Chi Minh City project?

Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.

Do you have an office or installation team in Ho Chi Minh City?

No. We manufacture in India and supply into Ho Chi Minh City. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Ho Chi Minh City site?

ships from: Palwal, Haryana, India, arrives at: Cat Lai or Cai Mep, then a short road run into the city, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.