Home > Ho Chi Minh City > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Ho Chi Minh City

HVAC, plant and machine noise control in Ho Chi Minh City

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / Start here

What this material is and where it earns its place in Ho Chi Minh City

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

Work reaching us from Ho Chi Minh City is mostly tube houses and apartments, towers and offices, manufacturing, hotels, schools, clinics.

  • Narrow, deep, shared on both sides The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
  • Traffic never stops Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.
  • New towers, hard interiors Concrete frames with tile and glass inside. The structure blocks, the room rings.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Ho Chi Minh City.

HVAC duct soundproofing Machine noise control

02 / The build-up

How the layers stack, from the structure inwards

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Ho Chi Minh City, split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  2. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 2

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Ho Chi Minh City, function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.

    Direct fix. Mechanically fixed to the soffit or wall. Durable and simple.

  3. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 3

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Ho Chi Minh City, classrooms are hard, naturally ventilated and open to street noise, with large class sizes.

    Corner loading. Low frequency energy collects in corners, so absorber in the corners does more than the same area spread across a wall.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / In this market

What we see driving Ho Chi Minh City briefs

  • Narrow, deep, shared on both sides

    The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.

  • Traffic never stops

    Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.

  • New towers, hard interiors

    Concrete frames with tile and glass inside. The structure blocks, the room rings.

  • Tropical humidity all year

    PET felt does not hold moisture or feed mould, which matters where mineral products sag within a couple of seasons.

  • Plant and HVAC

    Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.

04 / Room by room

Space by space, for Ho Chi Minh City briefs

  • Insulated HVAC ducts that need acoustic lagging

    At source

    Enclosure, barrier or anti vibration mounts at the machine. The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.

  • Air handling units in an industrial plant room

    In the path

    Duct lining, attenuators and lagging on the first run out of the plant. Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.

  • Boiler and pipework room that needs noise control

    At the receiver

    Only after the first two, and only for what is left. Concrete frames with tile and glass inside. The structure blocks, the room rings.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Durability

What the Ho Chi Minh City climate rules in and rules out

Ho Chi Minh City is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

06 / Worth knowing

Six mistakes that turn into a second fit-out

  • Absorption on the office wall for a plant room problem

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.

  • Ignoring structure borne vibration through the mounts

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating it as a generic Ho Chi Minh City job

    The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.

05 / Getting it there

Supply into Ho Chi Minh City, start to site

Supply into Ho Chi Minh City
Ships fromPalwal, Haryana, India
Arrives atCat Lai or Cai Mep, then a short road run into the city
Dispatch4 to 7 working days
FreightSea via Cat Lai or Cai Mep
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Cat Lai or Cai Mep, then a short road run into the city. Air freight for samples and urgent quantities.

FAQ

Questions from Ho Chi Minh City projects

What makes HVAC, plant and machine noise control different in Ho Chi Minh City?

Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts. The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.

Where should the budget go first on a Ho Chi Minh City project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Ho Chi Minh City?

No. We manufacture in India and supply into Ho Chi Minh City. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Ho Chi Minh City site?

ships from: Palwal, Haryana, India, arrives at: Cat Lai or Cai Mep, then a short road run into the city, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.