Home > Ho Chi Minh City > Office acoustics and soundproofing
For projects in Ho Chi Minh City
Office acoustics and soundproofing in Ho Chi Minh City
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.
- Open plan
- Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
- Meeting rooms
- Privacy between rooms. That is partition and door work, not panels.
- Cabins and calls
- Short RT so a call sounds clean. A small amount of well placed absorber.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this material is and where it earns its place in Ho Chi Minh City
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.
Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.
Work reaching us from Ho Chi Minh City is mostly tube houses and apartments, towers and offices, manufacturing, hotels, schools, clinics.
- New towers, hard interiors Concrete frames with tile and glass inside. The structure blocks, the room rings.
- Narrow, deep, shared on both sides The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
- Traffic never stops Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.
- Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Ho Chi Minh City.
Office and conference room acoustics Acoustic office screens
02 / The build-up
The stack, in the order it is installed
-

Layer 1
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Ho Chi Minh City, split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.
On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Ho Chi Minh City, function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
-

Layer 3
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Ho Chi Minh City, classrooms are hard, naturally ventilated and open to street noise, with large class sizes.
Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / On the ground
What the buildings in Ho Chi Minh City do to the specification
- New towers, hard interiors
Concrete frames with tile and glass inside. The structure blocks, the room rings.
- Narrow, deep, shared on both sides
The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
- Traffic never stops
Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.
- Tropical humidity all year
PET felt does not hold moisture or feed mould, which matters where mineral products sag within a couple of seasons.
- Plant and HVAC
Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.
04 / Room by room
Room by room, on a typical Ho Chi Minh City job
-

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Concrete frames with tile and glass inside. The structure blocks, the room rings.
- PET felt acoustic panels, 100% PET non-woven, no added binder
- Acoustic carpet and rugs, 4 mm
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Meeting rooms
Privacy between rooms. That is partition and door work, not panels. The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Acoustic carpet and rugs, High density polyester
- Acoustic panels, ASTM C423
-

Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber. Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.
- PET felt acoustic panels, 4 to 24 mm
- Acoustic carpet and rugs, Felt
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
For a Ho Chi Minh City interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Climate and durability
Durability in Ho Chi Minh City, before acoustics is discussed
Ho Chi Minh City is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Worth knowing
The six errors that cost the most
-
Lining every wall while leaving the ceiling bare
The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.
-
Treating a privacy problem with absorption
Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.
-
Glass cabins specified without a door and head detail
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Treating it as a generic Ho Chi Minh City job
Concrete frames with tile and glass inside. The structure blocks, the room rings.
05 / Route to site
Getting it to Ho Chi Minh City, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Cat Lai or Cai Mep, then a short road run into the city |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Cat Lai or Cai Mep |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Cat Lai or Cai Mep, then a short road run into the city. Air freight for samples and urgent quantities.
Questions from Ho Chi Minh City projects
What makes office acoustics and soundproofing different in Ho Chi Minh City?
Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts. The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
Where should the budget go first on a Ho Chi Minh City project?
Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.
Do you have an office or installation team in Ho Chi Minh City?
No. We manufacture in India and supply into Ho Chi Minh City. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Ho Chi Minh City site?
ships from: Palwal, Haryana, India, arrives at: Cat Lai or Cai Mep, then a short road run into the city, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.