Home > Ho Chi Minh City > Hospital and healthcare acoustics
For projects in Ho Chi Minh City
Hospital and healthcare acoustics in Ho Chi Minh City
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.
- Consulting room privacy
- Speech privacy between rooms, which is partition, door and ceiling void work.
- Ward noise floor
- Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
- Cleanability
- Non shedding, non absorbent surfaces that survive a cleaning regime.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The material, and what it actually does on a Ho Chi Minh City job
Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.
Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.
Work reaching us from Ho Chi Minh City is mostly tube houses and apartments, towers and offices, manufacturing, hotels, schools, clinics.
- Narrow, deep, shared on both sides The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
- Traffic never stops Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.
- New towers, hard interiors Concrete frames with tile and glass inside. The structure blocks, the room rings.
- Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in Ho Chi Minh City.
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Ho Chi Minh City, split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.
Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.
-

Layer 2
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Ho Chi Minh City, function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Ho Chi Minh City, classrooms are hard, naturally ventilated and open to street noise, with large class sizes.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
If you are specifying for a Ho Chi Minh City project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / In this market
What decides the build-up in Ho Chi Minh City
- Narrow, deep, shared on both sides
The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
- Traffic never stops
Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.
- New towers, hard interiors
Concrete frames with tile and glass inside. The structure blocks, the room rings.
- Tropical humidity all year
PET felt does not hold moisture or feed mould, which matters where mineral products sag within a couple of seasons.
- Plant and HVAC
Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.
04 / Room by room
Where the money goes on a Ho Chi Minh City project
-

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work. The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
- PET felt acoustic panels, 100% PET non-woven, no added binder
- Ceiling baffles and clouds, 9 to 24 mm
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling. Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Ceiling baffles and clouds, Made to the drawing, standard and custom
- Acoustic panels, ASTM C423
-

Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime. Concrete frames with tile and glass inside. The structure blocks, the room rings.
- PET felt acoustic panels, 4 to 24 mm
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Climate
The Ho Chi Minh City climate decides the material list
Ho Chi Minh City is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
On a Ho Chi Minh City job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
06 / Before you buy
The six errors that cost the most
-
Fabric wrapped products in a clinical area
Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.
-
Absorption used where privacy was the requirement
Nobody has ever achieved speech privacy with a panel. Privacy needs mass, a sealed head detail and a door that actually closes.
-
Ceiling void left open above a partition
The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.
-
Treating it as a generic Ho Chi Minh City job
The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
05 / Getting it there
Supply into Ho Chi Minh City, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Cat Lai or Cai Mep, then a short road run into the city |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Cat Lai or Cai Mep |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Cat Lai or Cai Mep, then a short road run into the city. Air freight for samples and urgent quantities.
Questions from Ho Chi Minh City projects
What makes hospital and healthcare acoustics different in Ho Chi Minh City?
Split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts. The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
Where should the budget go first on a Ho Chi Minh City project?
Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Do you have an office or installation team in Ho Chi Minh City?
No. We manufacture in India and supply into Ho Chi Minh City. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Ho Chi Minh City site?
ships from: Palwal, Haryana, India, arrives at: Cat Lai or Cai Mep, then a short road run into the city, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.