Home > Ho Chi Minh City > Recording studio acoustics and soundproofing
For projects in Ho Chi Minh City
Recording studio acoustics and soundproofing in Ho Chi Minh City
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. A fast growing content scene works out of rooms in tube houses and commercial floors with thin partitions.
- Isolation
- A measured background level, agreed before anything is bought.
- Low frequency
- Corner and boundary absorption with real depth, not surface foam.
- Early reflections
- Controlled at the mix position, and only there.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What you are buying, and what it fixes in Ho Chi Minh City
Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.
A fast growing content scene works out of rooms in tube houses and commercial floors with thin partitions.
Work reaching us from Ho Chi Minh City is mostly tube houses and apartments, towers and offices, manufacturing, hotels, schools, clinics.
- Narrow, deep, shared on both sides The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
- Traffic never stops Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.
- New towers, hard interiors Concrete frames with tile and glass inside. The structure blocks, the room rings.
- Isolation A measured background level, agreed before anything is bought.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Ho Chi Minh City.
02 / The build-up
The build-up, layer by layer
-

Layer 1
Acoustic foam and BassBloc
Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Ho Chi Minh City, split units with condensers on facades and in narrow gaps between buildings that act as reverberant shafts.
First reflection points. Mirror trick placement on side walls and ceiling, which is a handful of panels rather than a lined room.
-

Layer 2
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Ho Chi Minh City, function halls, places of worship and conference rooms are hard volumes carrying amplified speech and music.
Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.
-

Layer 3
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Ho Chi Minh City, classrooms are hard, naturally ventilated and open to street noise, with large class sizes.
Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.
Architects working in Ho Chi Minh City usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / Local conditions
The Ho Chi Minh City conditions that change the answer
- Narrow, deep, shared on both sides
The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
- Traffic never stops
Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.
- New towers, hard interiors
Concrete frames with tile and glass inside. The structure blocks, the room rings.
- Tropical humidity all year
PET felt does not hold moisture or feed mould, which matters where mineral products sag within a couple of seasons.
- The housing stock
Tube houses and apartment towers in concrete and block, sharing walls with neighbours on both sides and hard floors throughout.
- The studio and content scene
A fast growing content scene works out of rooms in tube houses and commercial floors with thin partitions.
04 / Room by room
What each space in a Ho Chi Minh City project needs
-

Isolation
A measured background level, agreed before anything is bought. The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
- Acoustic foam and BassBloc, 1800 x 900 mm
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Soundproof curtains, 5.5 kg per sq m
-

Low frequency
Corner and boundary absorption with real depth, not surface foam. Constant street noise gets in through openings and glazing. The facade is where the first money should go, not the wall.
- Acoustic foam and BassBloc, 20 mm
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Soundproof curtains, Up to 30 dB
-

Early reflections
Controlled at the mix position, and only there. Concrete frames with tile and glass inside. The structure blocks, the room rings.
- Acoustic foam and BassBloc, 100 kg per cubic metre
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Soundproof curtains, 30
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate and durability
The Ho Chi Minh City climate decides the material list
Ho Chi Minh City is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Worth knowing
The six errors that cost the most
-
Buying foam to solve an isolation problem
It sounds like a small detail until the room is finished and the complaint arrives.
-
Treating the room before the shell is isolated
It sounds like a small detail until the room is finished and the complaint arrives.
-
Killing the room completely and calling it controlled
More absorption is not better absorption. Past the target the room goes flat and people raise their voices to compensate.
-
Treating it as a generic Ho Chi Minh City job
The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
05 / Route to site
Getting it to Ho Chi Minh City, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Cat Lai or Cai Mep, then a short road run into the city |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Cat Lai or Cai Mep |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Cat Lai or Cai Mep, then a short road run into the city. Air freight for samples and urgent quantities.
Questions from Ho Chi Minh City projects
What makes recording studio acoustics and soundproofing different in Ho Chi Minh City?
A fast growing content scene works out of rooms in tube houses and commercial floors with thin partitions. The tube house has party walls left and right and an open front onto the street, so noise arrives from three directions at once.
Where should the budget go first on a Ho Chi Minh City project?
Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.
Do you have an office or installation team in Ho Chi Minh City?
No. We manufacture in India and supply into Ho Chi Minh City. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Ho Chi Minh City site?
ships from: Palwal, Haryana, India, arrives at: Cat Lai or Cai Mep, then a short road run into the city, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Buying foam to solve an isolation problem. Treating the room before the shell is isolated.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.