Home > Dhaka > Office acoustics and soundproofing

Modern office interior with acoustic treatment

For projects in Dhaka

Office acoustics and soundproofing in Dhaka

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Split units and diesel generator sets, with generators close to occupied rooms and running often.

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Meeting rooms
Privacy between rooms. That is partition and door work, not panels.
Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber.
Quote
From a plan and a section, within 48 hours

01 / Start here

The product, described honestly, for a Dhaka brief

Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.

Split units and diesel generator sets, with generators close to occupied rooms and running often.

Work reaching us from Dhaka is mostly apartments, offices, garment unit admin blocks, hospitals, schools, hotels, studios.

  • Noise arrives from outside Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.
  • Generators in every gap Standby generation sits in courtyards and alleys next to bedrooms and offices. Enclosure at the source is the only thing that works.
  • Buildings against buildings There is often no gap at all between structures, so sound moves between buildings as well as within them.
  • Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Dhaka.

Office and conference room acoustics Acoustic office screens

02 / The build-up

The stack, in the order it is installed

  1. PET acoustic felt wall panels in office interior

    Layer 1

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Dhaka, split units and diesel generator sets, with generators close to occupied rooms and running often.

    Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.

  2. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 2

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Dhaka, community halls, places of worship and conference rooms are hard volumes carrying amplified speech.

    Ceiling first. In most rooms the ceiling is the largest untreated surface and the cheapest square metre of result.

  3. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 3

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Dhaka, classrooms are concrete and tile with very large class sizes, and street noise enters through open windows all day.

    Wall, decoupled. Independent stud, membrane between the boards, cavity absorption, two boards. The membrane is one part of a system, never the whole answer.

We would rather argue about the build-up at design stage than on site. See how we support architects.

03 / In this market

What we see driving Dhaka briefs

  • Noise arrives from outside

    Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.

  • Generators in every gap

    Standby generation sits in courtyards and alleys next to bedrooms and offices. Enclosure at the source is the only thing that works.

  • Buildings against buildings

    There is often no gap at all between structures, so sound moves between buildings as well as within them.

  • A short route from the plant

    Sea into Chattogram or overland through the border, which keeps lead times short and consignments flexible.

  • Plant and HVAC

    Split units and diesel generator sets, with generators close to occupied rooms and running often.

04 / Room by room

What each space in a Dhaka project needs

  • Office ceiling with acoustic clouds and baffles

    Open plan

    Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.

  • Acoustic wall panels in office

    Meeting rooms

    Privacy between rooms. That is partition and door work, not panels. Standby generation sits in courtyards and alleys next to bedrooms and offices. Enclosure at the source is the only thing that works.

  • Office acoustic carpet tiles and rugs

    Cabins and calls

    Short RT so a call sounds clean. A small amount of well placed absorber. There is often no gap at all between structures, so sound moves between buildings as well as within them.

For a Dhaka interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate and durability

Durability in Dhaka, before acoustics is discussed

Dhaka is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

On a Dhaka job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Straight talk

Where this kind of project usually fails

  • Lining every wall while leaving the ceiling bare

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating a privacy problem with absorption

    Privacy is a transmission problem. Absorption makes the room sound nicer and does not stop anyone hearing through the wall.

  • Glass cabins specified without a door and head detail

    A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.

  • Treating it as a generic Dhaka job

    Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.

05 / Getting it there

Supply into Dhaka, start to site

Supply into Dhaka
Ships fromPalwal, Haryana, India
Arrives atChattogram or the land border, then road into Dhaka
Dispatch4 to 7 working days
FreightSea or land border
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Chattogram or overland through the land border, then road into Dhaka. Air freight for samples and urgent quantities.

FAQ

Questions from Dhaka projects

What makes office acoustics and soundproofing different in Dhaka?

Split units and diesel generator sets, with generators close to occupied rooms and running often. Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.

Where should the budget go first on a Dhaka project?

Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.

Do you have an office or installation team in Dhaka?

No. We manufacture in India and supply into Dhaka. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Dhaka site?

ships from: Palwal, Haryana, India, arrives at: Chattogram or the land border, then road into Dhaka, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.