For projects in Dhaka
HVAC, plant and machine noise control in Dhaka
Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split units and diesel generator sets, with generators close to occupied rooms and running often.
- At source
- Enclosure, barrier or anti vibration mounts at the machine.
- In the path
- Duct lining, attenuators and lagging on the first run out of the plant.
- At the receiver
- Only after the first two, and only for what is left.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What this is, and what it changes in a Dhaka room
Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.
Split units and diesel generator sets, with generators close to occupied rooms and running often.
Work reaching us from Dhaka is mostly apartments, offices, garment unit admin blocks, hospitals, schools, hotels, studios.
- Noise arrives from outside Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.
- Generators in every gap Standby generation sits in courtyards and alleys next to bedrooms and offices. Enclosure at the source is the only thing that works.
- Buildings against buildings There is often no gap at all between structures, so sound moves between buildings as well as within them.
- At source Enclosure, barrier or anti vibration mounts at the machine.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Dhaka.
02 / The build-up
The build-up, layer by layer
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Dhaka, split units and diesel generator sets, with generators close to occupied rooms and running often.
Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
-

Layer 2
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Dhaka, community halls, places of worship and conference rooms are hard volumes carrying amplified speech.
Resilient bar. Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
-

Layer 3
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Dhaka, classrooms are concrete and tile with very large class sizes, and street noise enters through open windows all day.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
For a Dhaka practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / In this market
What decides the build-up in Dhaka
- Noise arrives from outside
Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.
- Generators in every gap
Standby generation sits in courtyards and alleys next to bedrooms and offices. Enclosure at the source is the only thing that works.
- Buildings against buildings
There is often no gap at all between structures, so sound moves between buildings as well as within them.
- A short route from the plant
Sea into Chattogram or overland through the border, which keeps lead times short and consignments flexible.
- Plant and HVAC
Split units and diesel generator sets, with generators close to occupied rooms and running often.
04 / Room by room
What each space in a Dhaka project needs
-

At source
Enclosure, barrier or anti vibration mounts at the machine. Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.
- Wood wool acoustic panels, 1200 x 600 mm
- Acoustic foam and BassBloc, 20 mm
- Ceiling baffles and clouds, Made to the drawing, standard and custom
-

In the path
Duct lining, attenuators and lagging on the first run out of the plant. Standby generation sits in courtyards and alleys next to bedrooms and offices. Enclosure at the source is the only thing that works.
- Wood wool acoustic panels, 20 mm
- Acoustic foam and BassBloc, 100 kg per cubic metre
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
-

At the receiver
Only after the first two, and only for what is left. There is often no gap at all between structures, so sound moves between buildings as well as within them.
- Wood wool acoustic panels, 400 kg per cubic metre
- Acoustic foam and BassBloc, 100 to 500 Hz
- Ceiling baffles and clouds, ASTM C423
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Conditions
Why the climate in Dhaka changes the material, not the target
Dhaka is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
Where a consultant is already engaged on a Dhaka project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Worth knowing
What we watch go wrong on jobs like this
-
Absorption on the office wall for a plant room problem
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Lagging a duct that is carrying the noise as breakout from the fan
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Ignoring structure borne vibration through the mounts
Small on the drawing, expensive on site, and almost always found after handover.
-
Treating it as a generic Dhaka job
Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.
05 / Getting it there
Supply into Dhaka, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Chattogram or the land border, then road into Dhaka |
| Dispatch | 4 to 7 working days |
| Freight | Sea or land border |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Chattogram or overland through the land border, then road into Dhaka. Air freight for samples and urgent quantities.
Questions from Dhaka projects
What makes HVAC, plant and machine noise control different in Dhaka?
Split units and diesel generator sets, with generators close to occupied rooms and running often. Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.
Where should the budget go first on a Dhaka project?
At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.
Do you have an office or installation team in Dhaka?
No. We manufacture in India and supply into Dhaka. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Dhaka site?
ships from: Palwal, Haryana, India, arrives at: Chattogram or the land border, then road into Dhaka, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.