Home > Dhaka > Auditorium acoustics and soundproofing

Auditorium with acoustic panels and soundproofing

For projects in Dhaka

Auditorium acoustics and soundproofing in Dhaka

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Community halls, places of worship and conference rooms are hard volumes carrying amplified speech.

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Rear wall
The single worst surface in most halls, and the first one to treat.
Quote
From a plan and a section, within 48 hours

01 / What it is

The product, described honestly, for a Dhaka brief

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.

Community halls, places of worship and conference rooms are hard volumes carrying amplified speech.

Work reaching us from Dhaka is mostly apartments, offices, garment unit admin blocks, hospitals, schools, hotels, studios.

  • Noise arrives from outside Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.
  • Generators in every gap Standby generation sits in courtyards and alleys next to bedrooms and offices. Enclosure at the source is the only thing that works.
  • Buildings against buildings There is often no gap at all between structures, so sound moves between buildings as well as within them.
  • Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Dhaka.

Auditorium soundproofing Wood wool acoustic panels

02 / The build-up

The stack, in the order it is installed

  1. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 1

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Dhaka, split units and diesel generator sets, with generators close to occupied rooms and running often.

    With a porous backing. Board over mineral backing where the room needs more than the board alone gives.

  2. PET acoustic felt wall panels in office interior

    Layer 2

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Dhaka, community halls, places of worship and conference rooms are hard volumes carrying amplified speech.

    Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.

  3. Acoustic carpet tiles and rugs on a modern floor

    Layer 3

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Dhaka, classrooms are concrete and tile with very large class sizes, and street noise enters through open windows all day.

    Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.

If you are specifying for a Dhaka project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / Local conditions

What we see driving Dhaka briefs

  • Noise arrives from outside

    Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.

  • Generators in every gap

    Standby generation sits in courtyards and alleys next to bedrooms and offices. Enclosure at the source is the only thing that works.

  • Buildings against buildings

    There is often no gap at all between structures, so sound moves between buildings as well as within them.

  • A short route from the plant

    Sea into Chattogram or overland through the border, which keeps lead times short and consignments flexible.

  • Assembly and performance rooms

    Community halls, places of worship and conference rooms are hard volumes carrying amplified speech.

  • School and campus buildings

    Classrooms are concrete and tile with very large class sizes, and street noise enters through open windows all day.

04 / Room by room

What each space in a Dhaka project needs

  • Auditorium walls with wood wool, felt and wooden slats

    Reverberation time

    Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.

  • Auditorium ceiling with acoustic baffles and clouds

    Early reflections

    Shaped surfaces that send energy to the rear seats rather than absorbing everything. Standby generation sits in courtyards and alleys next to bedrooms and offices. Enclosure at the source is the only thing that works.

  • Auditorium floor with acoustic carpeting

    Rear wall

    The single worst surface in most halls, and the first one to treat. There is often no gap at all between structures, so sound moves between buildings as well as within them.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Climate

What the Dhaka climate rules in and rules out

Dhaka is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.

Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.

The failure we design against here is mould, sagging fabric finishes and swelling in timber.

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

06 / Before you buy

Where this kind of project usually fails

  • Absorbing the whole room and losing the back rows

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Adding speakers to fix a reverberation problem

    Small on the drawing, expensive on site, and almost always found after handover.

  • Ignoring the rear wall because it is behind the audience

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating it as a generic Dhaka job

    Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.

05 / Supply

What the route into Dhaka actually looks like

Supply into Dhaka
Ships fromPalwal, Haryana, India
Arrives atChattogram or the land border, then road into Dhaka
Dispatch4 to 7 working days
FreightSea or land border
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Chattogram or overland through the land border, then road into Dhaka. Air freight for samples and urgent quantities.

FAQ

Questions from Dhaka projects

What makes auditorium acoustics and soundproofing different in Dhaka?

Community halls, places of worship and conference rooms are hard volumes carrying amplified speech. Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.

Where should the budget go first on a Dhaka project?

Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.

Do you have an office or installation team in Dhaka?

No. We manufacture in India and supply into Dhaka. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Dhaka site?

ships from: Palwal, Haryana, India, arrives at: Chattogram or the land border, then road into Dhaka, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.