For projects in Dhaka
Auditorium acoustics and soundproofing in Dhaka
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Community halls, places of worship and conference rooms are hard volumes carrying amplified speech.
- Reverberation time
- Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
- Early reflections
- Shaped surfaces that send energy to the rear seats rather than absorbing everything.
- Rear wall
- The single worst surface in most halls, and the first one to treat.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The product, described honestly, for a Dhaka brief
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.
Community halls, places of worship and conference rooms are hard volumes carrying amplified speech.
Work reaching us from Dhaka is mostly apartments, offices, garment unit admin blocks, hospitals, schools, hotels, studios.
- Noise arrives from outside Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.
- Generators in every gap Standby generation sits in courtyards and alleys next to bedrooms and offices. Enclosure at the source is the only thing that works.
- Buildings against buildings There is often no gap at all between structures, so sound moves between buildings as well as within them.
- Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Dhaka.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Wood wool acoustic panels
Wood fibre bound into a rigid board with an open texture. In Dhaka, split units and diesel generator sets, with generators close to occupied rooms and running often.
With a porous backing. Board over mineral backing where the room needs more than the board alone gives.
-

Layer 2
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Dhaka, community halls, places of worship and conference rooms are hard volumes carrying amplified speech.
Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Dhaka, classrooms are concrete and tile with very large class sizes, and street noise enters through open windows all day.
Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.
If you are specifying for a Dhaka project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / Local conditions
What we see driving Dhaka briefs
- Noise arrives from outside
Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.
- Generators in every gap
Standby generation sits in courtyards and alleys next to bedrooms and offices. Enclosure at the source is the only thing that works.
- Buildings against buildings
There is often no gap at all between structures, so sound moves between buildings as well as within them.
- A short route from the plant
Sea into Chattogram or overland through the border, which keeps lead times short and consignments flexible.
- Assembly and performance rooms
Community halls, places of worship and conference rooms are hard volumes carrying amplified speech.
- School and campus buildings
Classrooms are concrete and tile with very large class sizes, and street noise enters through open windows all day.
04 / Room by room
What each space in a Dhaka project needs
-

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.
- Wood wool acoustic panels, 1200 x 600 mm
- Ceiling baffles and clouds, 9 to 24 mm
- Acoustic carpet and rugs, High density polyester
-

Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything. Standby generation sits in courtyards and alleys next to bedrooms and offices. Enclosure at the source is the only thing that works.
- Wood wool acoustic panels, 20 mm
- Ceiling baffles and clouds, Made to the drawing, standard and custom
- Acoustic carpet and rugs, Felt
-

Rear wall
The single worst surface in most halls, and the first one to treat. There is often no gap at all between structures, so sound moves between buildings as well as within them.
- Wood wool acoustic panels, 400 kg per cubic metre
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
- Acoustic carpet and rugs, 64 sq ft per pack
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Climate
What the Dhaka climate rules in and rules out
Dhaka is warm and humid through most of the year, with a long wet season, and that narrows the material list before acoustics is discussed.
Humidity is the deciding factor. PET felt does not absorb moisture, shed fibre or feed mould, which is why it outlasts fabric-wrapped mineral wool in this climate. Wood wool and timber need a ventilated cavity behind them.
The failure we design against here is mould, sagging fabric finishes and swelling in timber.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Before you buy
Where this kind of project usually fails
-
Absorbing the whole room and losing the back rows
It sounds like a small detail until the room is finished and the complaint arrives.
-
Adding speakers to fix a reverberation problem
Small on the drawing, expensive on site, and almost always found after handover.
-
Ignoring the rear wall because it is behind the audience
It sounds like a small detail until the room is finished and the complaint arrives.
-
Treating it as a generic Dhaka job
Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.
05 / Supply
What the route into Dhaka actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Chattogram or the land border, then road into Dhaka |
| Dispatch | 4 to 7 working days |
| Freight | Sea or land border |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Chattogram or overland through the land border, then road into Dhaka. Air freight for samples and urgent quantities.
Questions from Dhaka projects
What makes auditorium acoustics and soundproofing different in Dhaka?
Community halls, places of worship and conference rooms are hard volumes carrying amplified speech. Traffic, generators and construction reach the room through windows and gaps long before they come through the wall. Treat the weakest path, not the biggest surface.
Where should the budget go first on a Dhaka project?
Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Do you have an office or installation team in Dhaka?
No. We manufacture in India and supply into Dhaka. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Dhaka site?
ships from: Palwal, Haryana, India, arrives at: Chattogram or the land border, then road into Dhaka, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.