For projects in Auckland
Venue and restaurant acoustics in Auckland
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. School halls, marae and community centres carry speech and performance in the same hard room.
- Containment
- Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
- Table level comfort
- Absorption at the ceiling so guests stop raising their voices at each other.
- Entrance and service
- Doors, lobbies and extract paths, which is where most of the leakage actually is.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this material is and where it earns its place in Auckland
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.
School halls, marae and community centres carry speech and performance in the same hard room.
Work reaching us from Auckland is mostly apartments and townhouses, offices, hospitality, schools, clinics, studios.
- Apartments built light and fast Townhouse and apartment stock built quickly in timber frame. The separating construction is where noise complaints concentrate.
- Weathertightness shapes the build-up Wall assemblies here are designed around drainage and drying. An acoustic layer has to work with that, not trap moisture in it.
- Volcanic ground, seismic detailing Flexible junctions are required, so a rigid acoustic bridge across a movement joint is not acceptable.
- Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Auckland.
Nightclub and venue soundproofing SoundBlanket mass loaded vinyl
02 / The build-up
The stack, in the order it is installed
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Auckland, heat pumps and ducted systems, with outdoor units close to boundaries in dense suburbs.
Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.
-

Layer 2
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Auckland, school halls, marae and community centres carry speech and performance in the same hard room.
Floating floor. Resilient layer and deck, to break impact energy before it reaches the structure.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Auckland, classroom acoustics are taken seriously and open plan learning spaces are common, which makes speech intelligibility the design target.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
Architects working in Auckland usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / On the ground
What decides the build-up in Auckland
- Apartments built light and fast
Townhouse and apartment stock built quickly in timber frame. The separating construction is where noise complaints concentrate.
- Weathertightness shapes the build-up
Wall assemblies here are designed around drainage and drying. An acoustic layer has to work with that, not trap moisture in it.
- Volcanic ground, seismic detailing
Flexible junctions are required, so a rigid acoustic bridge across a movement joint is not acceptable.
- The port is in the city
Direct sea into Auckland keeps the road leg short, though the sea leg itself is long and we quote it fully.
- Assembly and performance rooms
School halls, marae and community centres carry speech and performance in the same hard room.
04 / Room by room
What each space in a Auckland project needs
-

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Townhouse and apartment stock built quickly in timber frame. The separating construction is where noise complaints concentrate.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other. Wall assemblies here are designed around drainage and drying. An acoustic layer has to work with that, not trap moisture in it.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic panels, ASTM C423
-

Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is. Flexible junctions are required, so a rigid acoustic bridge across a movement joint is not acceptable.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Conditions
The Auckland climate decides the material list
Auckland is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Read this first
What we watch go wrong on jobs like this
-
Panels on the wall as a neighbour noise solution
It sounds like a small detail until the room is finished and the complaint arrives.
-
A lobby with both doors able to open at once
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Extract ducting that bypasses every wall you built
Enclose the machine, break the vibration path, then deal with what is left. Doing it in the other order costs more and achieves less.
-
Treating it as a generic Auckland job
Townhouse and apartment stock built quickly in timber frame. The separating construction is where noise complaints concentrate.
05 / Logistics
Getting it to Auckland, with real dates
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Auckland, then a short road run to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea into Auckland |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight direct into Auckland, then a short road run to site. Air freight for samples and urgent quantities.
Questions from Auckland projects
What makes venue and restaurant acoustics different in Auckland?
School halls, marae and community centres carry speech and performance in the same hard room. Townhouse and apartment stock built quickly in timber frame. The separating construction is where noise complaints concentrate.
Where should the budget go first on a Auckland project?
Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.
Do you have an office or installation team in Auckland?
No. We manufacture in India and supply into Auckland. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Auckland site?
ships from: Palwal, Haryana, India, arrives at: Auckland, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
What goes wrong most often on this kind of project?
Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.