Home > Taiwan > Soundproofing materials

Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

Manufactured in India, supplied in Taiwan

Soundproofing materials in Taiwan

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Taiwan. Made at our own plant in India and shipped into Kaohsiung or Taipei, then road to site.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

We make this ourselves and ship it to you. No local branch, no borrowed certifications, no dealer margin. One batch across the whole order, and an honest answer when the product is wrong for the problem.

01 / The material

What you are buying, and what it fixes in Taiwan

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from Taiwan is mostly manufacturing and measurement rooms, apartments, offices, hotels, schools, hospitals.

Reinforced concrete towers and older walk ups with hard tile floors, sitting very close together on narrow streets.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Taiwan.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / The numbers

Published specification, identical wherever we ship it

Nothing below changes by location. The decisions that do change are grade, thickness and how the material is mounted, and those are covered further down.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.

03 / In this market

What decides the build-up in Taiwan

  • Measurement rooms are unforgiving

    A test or metrology space needs a genuinely low background before any reading means anything. That is isolation against a written target.

  • Built to move

    Seismic detailing means junctions that must stay flexible. An acoustic layer cannot bridge a movement joint rigidly.

  • Dense apartment living

    Concrete blocks where impact through the slab is the recurring complaint rather than airborne transfer.

  • Typhoons and humidity

    PET felt does not hold moisture or feed mould, which matters through a humid season in a sealed room.

  • Plant and HVAC

    Split units and VRF with condensers on facades and in narrow gaps between buildings.

  • The housing stock

    Reinforced concrete towers and older walk ups with hard tile floors, sitting very close together on narrow streets.

We would rather argue about the build-up at design stage than on site. See how we support architects.

04 / Climate

Why the climate in Taiwan changes the material, not the target

Taiwan is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The risk we design against here is wet-season humidity behind linings.

For a Taiwan interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

05 / Supply

How material reaches a Taiwan site

Supply into Taiwan
Ships fromPalwal, Haryana, India
Arrives atKaohsiung or Taipei, then road to site
Dispatch4 to 7 working days
FreightSea via Kaohsiung
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Kaohsiung or Taipei, then road to site. Air freight for samples and urgent quantities.

06 / Straight talk

What we will tell you that a reseller will not

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • Square footage quoted before the room is understood

    Anyone can price a wall. Working out how much material the room actually needs usually reduces the order, which is why not everyone does it.

  • Local approvals that nobody actually holds

    We hold no Taiwan certification and we will not borrow one. The test data we publish is ours, and we will send the reports rather than describe them.

07 / In projects

The product on finished jobs

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

Taiwan: questions we are actually asked

Are these soundproofing materials made in Taiwan?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Taiwan as the manufacturer rather than through a dealer. Made at our own plant in India and shipped into Kaohsiung or Taipei, then road to site. You buy at factory prices with one consistent batch across the order.

What decides the specification for a Taiwan project?

A test or metrology space needs a genuinely low background before any reading means anything. That is isolation against a written target. Seismic detailing means junctions that must stay flexible. An acoustic layer cannot bridge a movement joint rigidly. Those two things move the build-up far more than the panel figure does.

Will this material last in the Taiwan climate?

Taiwan is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.

What is the delivery time into Taiwan?

ships from: Palwal, Haryana, India, arrives at: Kaohsiung or Taipei, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Where do soundproofing materials fail to help?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

What is the minimum order and how is it packed?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Send the drawings, get a straight answer

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.