For projects in Munich
Office acoustics and soundproofing in Munich
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted. Mechanical ventilation with heat recovery is standard in newer stock, so duct-borne noise and terminal unit noise are the sources rather than open windows.
- Open plan
- Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
- Meeting rooms
- Privacy between rooms. That is partition and door work, not panels.
- Cabins and calls
- Short RT so a call sounds clean. A small amount of well placed absorber.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What you are buying, and what it fixes in Munich
Three separate problems get called one problem: speech carrying across an open floor, meeting rooms that leak, and hard rooms that ring. Each has a different answer and mixing them up is how budgets get wasted.
Mechanical ventilation with heat recovery is standard in newer stock, so duct-borne noise and terminal unit noise are the sources rather than open windows.
Work reaching us from Munich is mostly apartments and villas, corporate floors, studios, hotels, clinics, schools.
- Corporate and studio work Head office floors, media rooms and production studios around the city want measured performance and a finish that survives a design review.
- Altbau above, concrete below A stucco ceilinged Altbau flat and a post-war concrete block need different answers to the same complaint. We ask which one you are in before we quote anything.
- Specified, with numbers attached Send us the acoustician report and the target values. We will tell you what our build-up gets to and where it falls short, in writing, before you commit.
- Open plan Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for office acoustics are on the main product page. This page covers what that means for a project in Munich.
Office and conference room acoustics Acoustic office screens
02 / The build-up
What goes where, from the structure in
-

Layer 1
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Munich, mechanical ventilation with heat recovery is standard in newer stock, so duct-borne noise and terminal unit noise are the sources rather than open windows.
Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.
-

Layer 2
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Munich, concert halls, church buildings and civic Saal spaces are long-reverberation rooms where any intervention has to be reversible and visually disciplined.
On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.
-

Layer 3
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Munich, school and university buildings are built to a high thermal standard with hard, cleanable surfaces. Speech clarity in classrooms and long corridors is where the acoustic budget goes.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / Local conditions
What we see driving Munich briefs
- Corporate and studio work
Head office floors, media rooms and production studios around the city want measured performance and a finish that survives a design review.
- Altbau above, concrete below
A stucco ceilinged Altbau flat and a post-war concrete block need different answers to the same complaint. We ask which one you are in before we quote anything.
- Specified, with numbers attached
Send us the acoustician report and the target values. We will tell you what our build-up gets to and where it falls short, in writing, before you commit.
- Floor area is expensive here
Every centimetre the wall grows into the room is money. A dense membrane plus a resilient layer usually beats a thick framed build-up on both cost and depth.
- Plant and HVAC
Mechanical ventilation with heat recovery is standard in newer stock, so duct-borne noise and terminal unit noise are the sources rather than open windows.
04 / Room by room
Space by space, for Munich briefs
-

Open plan
Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Head office floors, media rooms and production studios around the city want measured performance and a finish that survives a design review.
- PET felt acoustic panels, 100% PET non-woven, no added binder
- Acoustic carpet and rugs, 4 mm
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Meeting rooms
Privacy between rooms. That is partition and door work, not panels. A stucco ceilinged Altbau flat and a post-war concrete block need different answers to the same complaint. We ask which one you are in before we quote anything.
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Acoustic carpet and rugs, High density polyester
- Acoustic panels, ASTM C423
-

Cabins and calls
Short RT so a call sounds clean. A small amount of well placed absorber. Send us the acoustician report and the target values. We will tell you what our build-up gets to and where it falls short, in writing, before you commit.
- PET felt acoustic panels, 4 to 24 mm
- Acoustic carpet and rugs, Felt
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Climate and durability
What the Munich climate rules in and rules out
Munich is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
On a Munich job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.
06 / Before you buy
Where this kind of project usually fails
-
Lining every wall while leaving the ceiling bare
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating a privacy problem with absorption
If the complaint is being overheard, no amount of absorption inside the room will fix it. That is a partition job and we will say so.
-
Glass cabins specified without a door and head detail
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Treating it as a generic Munich job
Head office floors, media rooms and production studios around the city want measured performance and a finish that survives a design review.
05 / Getting it there
How material reaches a Munich site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Hamburg or Bremerhaven, then rail and road south to Bavaria |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Hamburg |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
Sea freight into Hamburg or Bremerhaven, then rail and road south. It is a long inland leg and we build it into the dates we give you rather than pretending it is not there.
Questions from Munich projects
What makes office acoustics and soundproofing different in Munich?
Mechanical ventilation with heat recovery is standard in newer stock, so duct-borne noise and terminal unit noise are the sources rather than open windows. A stucco ceilinged Altbau flat and a post-war concrete block need different answers to the same complaint. We ask which one you are in before we quote anything.
Where should the budget go first on a Munich project?
Open plan. Distraction distance, not reverberation time. Ceiling absorption plus screens at the desk. Meeting rooms. Privacy between rooms. That is partition and door work, not panels.
Do you have an office or installation team in Munich?
No. We manufacture in India and supply into Munich. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Munich site?
ships from: Palwal, Haryana, India, arrives at: Hamburg or Bremerhaven, then rail and road south to Bavaria, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order.
What goes wrong most often on this kind of project?
Lining every wall while leaving the ceiling bare. Treating a privacy problem with absorption.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.