For projects in Morocco
Cinema and multiplex soundproofing in Morocco
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Mosques and civic halls are tall volumes in masonry and tile with long decay times.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / The material
What this is, and what it changes in a Morocco room
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Mosques and civic halls are tall volumes in masonry and tile with long decay times.
Work reaching us from Morocco is mostly manufacturing plants, hotels and riads, offices, restaurants, schools, hospitals.
- Two very different markets Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
- Traditional buildings, hard surfaces Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
- Tanger Med is a major hub Frequent sailings and good onward connections make this one of the easier African routes to plan around.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Morocco.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Morocco, split units with condensers in courtyards and light wells, running hard through long summers.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Morocco, mosques and civic halls are tall volumes in masonry and tile with long decay times.
Over a resilient underlay. Where impact noise to the floor below is the actual complaint, the underlay does that work, not the carpet.
-

Layer 3
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Morocco, school buildings are hard surfaced with high ceilings and courtyards that amplify break time noise.
Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.
Architects working in Morocco usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / In this market
The Morocco conditions that change the answer
- Two very different markets
Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
- Traditional buildings, hard surfaces
Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
- Tanger Med is a major hub
Frequent sailings and good onward connections make this one of the easier African routes to plan around.
- Hot and dry inland, humid on the coast
PET felt is stable in both and does not sag, shed fibre or hold moisture.
- Assembly and performance rooms
Mosques and civic halls are tall volumes in masonry and tile with long decay times.
04 / Room by room
Where the money goes on a Morocco project
-

Screen to screen
Independent construction between auditoria, with services broken at the line. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic carpet and rugs, High density polyester
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic carpet and rugs, Felt
-

Plant and projection
Equipment noise into the auditorium, treated at source. Frequent sailings and good onward connections make this one of the easier African routes to plan around.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Acoustic carpet and rugs, 64 sq ft per pack
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Climate
Durability in Morocco, before acoustics is discussed
Morocco is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.
The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.
The failure we design against here is seasonal movement in timber and winter damp in unheated stock.
Where a consultant is already engaged on a Morocco project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Before you buy
Six mistakes that turn into a second fit-out
-
A shared service void running across the wall line
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating the auditorium to fix bleed from the next screen
Small on the drawing, expensive on site, and almost always found after handover.
-
Doors and lobbies specified late and undersized
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Treating it as a generic Morocco job
Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
05 / Route to site
Supply into Morocco, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Tanger Med or Casablanca, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Tanger Med |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Tanger Med or Casablanca, then road to site. Air freight for samples and urgent quantities.
Questions from Morocco projects
What makes cinema and multiplex soundproofing different in Morocco?
Mosques and civic halls are tall volumes in masonry and tile with long decay times. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
Where should the budget go first on a Morocco project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Morocco?
No. We manufacture in India and supply into Morocco. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Morocco site?
ships from: Palwal, Haryana, India, arrives at: Tanger Med or Casablanca, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.