For projects in Morocco
HVAC, plant and machine noise control in Morocco
Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Split units with condensers in courtyards and light wells, running hard through long summers.
- At source
- Enclosure, barrier or anti vibration mounts at the machine.
- In the path
- Duct lining, attenuators and lagging on the first run out of the plant.
- At the receiver
- Only after the first two, and only for what is left.
- Quote
- From a plan and a section, within 48 hours
01 / What it is
The product, described honestly, for a Morocco brief
Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.
Split units with condensers in courtyards and light wells, running hard through long summers.
Work reaching us from Morocco is mostly manufacturing plants, hotels and riads, offices, restaurants, schools, hospitals.
- Two very different markets Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
- Traditional buildings, hard surfaces Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
- Tanger Med is a major hub Frequent sailings and good onward connections make this one of the easier African routes to plan around.
- At source Enclosure, barrier or anti vibration mounts at the machine.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Morocco.
02 / The build-up
What goes where, from the structure in
-

Layer 1
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Morocco, split units with condensers in courtyards and light wells, running hard through long summers.
Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.
-

Layer 2
Acoustic foam and BassBloc
Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Morocco, mosques and civic halls are tall volumes in masonry and tile with long decay times.
Behind a fabric frame. Where the room has to look finished, absorber inside a frame rather than foam on show.
-

Layer 3
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Morocco, school buildings are hard surfaced with high ceilings and courtyards that amplify break time noise.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
Architects working in Morocco usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.
03 / In this market
What the buildings in Morocco do to the specification
- Two very different markets
Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
- Traditional buildings, hard surfaces
Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
- Tanger Med is a major hub
Frequent sailings and good onward connections make this one of the easier African routes to plan around.
- Hot and dry inland, humid on the coast
PET felt is stable in both and does not sag, shed fibre or hold moisture.
- Plant and HVAC
Split units with condensers in courtyards and light wells, running hard through long summers.
04 / Room by room
Space by space, for Morocco briefs
-

At source
Enclosure, barrier or anti vibration mounts at the machine. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
- Soundproofing materials, 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- Acoustic foam and BassBloc, 20 mm
- Ceiling baffles and clouds, Made to the drawing, standard and custom
-

In the path
Duct lining, attenuators and lagging on the first run out of the plant. Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic foam and BassBloc, 100 kg per cubic metre
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
-

At the receiver
Only after the first two, and only for what is left. Frequent sailings and good onward connections make this one of the easier African routes to plan around.
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic foam and BassBloc, 100 to 500 Hz
- Ceiling baffles and clouds, ASTM C423
If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.
04 / Climate and durability
Durability in Morocco, before acoustics is discussed
Morocco is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.
The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.
The failure we design against here is seasonal movement in timber and winter damp in unheated stock.
Where a consultant is already engaged on a Morocco project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.
06 / Worth knowing
Six mistakes that turn into a second fit-out
-
Absorption on the office wall for a plant room problem
Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.
-
Lagging a duct that is carrying the noise as breakout from the fan
Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.
-
Ignoring structure borne vibration through the mounts
This is the one that comes back as a second fit-out rather than a snag.
-
Treating it as a generic Morocco job
Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
05 / Route to site
How material reaches a Morocco site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Tanger Med or Casablanca, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Tanger Med |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Tanger Med or Casablanca, then road to site. Air freight for samples and urgent quantities.
Questions from Morocco projects
What makes HVAC, plant and machine noise control different in Morocco?
Split units with condensers in courtyards and light wells, running hard through long summers. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
Where should the budget go first on a Morocco project?
At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.
Do you have an office or installation team in Morocco?
No. We manufacture in India and supply into Morocco. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Morocco site?
ships from: Palwal, Haryana, India, arrives at: Tanger Med or Casablanca, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.