Home > Morocco > Hospital and healthcare acoustics

Hospital corridor with acoustic ceiling and wall treatment

For projects in Morocco

Hospital and healthcare acoustics in Morocco

Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed. Split units with condensers in courtyards and light wells, running hard through long summers.

Consulting room privacy
Speech privacy between rooms, which is partition, door and ceiling void work.
Ward noise floor
Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.
Cleanability
Non shedding, non absorbent surfaces that survive a cleaning regime.
Quote
From a plan and a section, within 48 hours

01 / The material

What this material is and where it earns its place in Morocco

Two duties at once: privacy where confidential conversations happen, and a lower noise floor where people are trying to rest. Hygiene and cleanability rule out a lot of products before acoustics is even discussed.

Split units with condensers in courtyards and light wells, running hard through long summers.

Work reaching us from Morocco is mostly manufacturing plants, hotels and riads, offices, restaurants, schools, hospitals.

  • Two very different markets Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
  • Traditional buildings, hard surfaces Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
  • Tanger Med is a major hub Frequent sailings and good onward connections make this one of the easier African routes to plan around.
  • Consulting room privacy Speech privacy between rooms, which is partition, door and ceiling void work.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for healthcare acoustics are on the main product page. This page covers what that means for a project in Morocco.

Hospital soundproofing

02 / The build-up

What goes where, from the structure in

  1. PET acoustic felt wall panels in office interior

    Layer 1

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Morocco, split units with condensers in courtyards and light wells, running hard through long summers.

    Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.

  2. Acoustic hanging ceiling baffles in a large open space

    Layer 2

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Morocco, mosques and civic halls are tall volumes in masonry and tile with long decay times.

    Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.

  3. Acoustic Panel Manufacturer Supplying in Abu Dhabi

    Layer 3

    Acoustic panels

    The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Morocco, school buildings are hard surfaced with high ceilings and courtyards that amplify break time noise.

    Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.

If you are specifying for a Morocco project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / Local conditions

The Morocco conditions that change the answer

  • Two very different markets

    Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.

  • Traditional buildings, hard surfaces

    Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.

  • Tanger Med is a major hub

    Frequent sailings and good onward connections make this one of the easier African routes to plan around.

  • Hot and dry inland, humid on the coast

    PET felt is stable in both and does not sag, shed fibre or hold moisture.

  • Plant and HVAC

    Split units with condensers in courtyards and light wells, running hard through long summers.

04 / Room by room

Where the money goes on a Morocco project

  • Hospital consultation room with acoustic wall treatment

    Consulting room privacy

    Speech privacy between rooms, which is partition, door and ceiling void work. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.

  • Hospital corridor with acoustic ceiling baffles and clouds

    Ward noise floor

    Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling. Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.

  • Hospital corridor doors with acoustic seals and curtains

    Cleanability

    Non shedding, non absorbent surfaces that survive a cleaning regime. Frequent sailings and good onward connections make this one of the easier African routes to plan around.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Conditions

What the Morocco climate rules in and rules out

Morocco is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.

The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.

The failure we design against here is seasonal movement in timber and winter damp in unheated stock.

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

06 / Read this first

Where this kind of project usually fails

  • Fabric wrapped products in a clinical area

    Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.

  • Absorption used where privacy was the requirement

    Privacy is a transmission problem. Absorption makes the room sound nicer and does not stop anyone hearing through the wall.

  • Ceiling void left open above a partition

    Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.

  • Treating it as a generic Morocco job

    Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.

05 / Route to site

Supply into Morocco, start to site

Supply into Morocco
Ships fromPalwal, Haryana, India
Arrives atTanger Med or Casablanca, then road to site
Dispatch4 to 7 working days
FreightSea via Tanger Med
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Tanger Med or Casablanca, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Morocco projects

What makes hospital and healthcare acoustics different in Morocco?

Split units with condensers in courtyards and light wells, running hard through long summers. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.

Where should the budget go first on a Morocco project?

Consulting room privacy. Speech privacy between rooms, which is partition, door and ceiling void work. Ward noise floor. Alarms, trolleys and staff conversation in hard corridors. Absorption at the ceiling.

Do you have an office or installation team in Morocco?

No. We manufacture in India and supply into Morocco. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Morocco site?

ships from: Palwal, Haryana, India, arrives at: Tanger Med or Casablanca, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Fabric wrapped products in a clinical area. Absorption used where privacy was the requirement.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.

script src="/assets/vendor/glightbox/js/glightbox.min.js">