For projects in Morocco
Auditorium acoustics and soundproofing in Morocco
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Mosques and civic halls are tall volumes in masonry and tile with long decay times.
- Reverberation time
- Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
- Early reflections
- Shaped surfaces that send energy to the rear seats rather than absorbing everything.
- Rear wall
- The single worst surface in most halls, and the first one to treat.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
The material, and what it actually does on a Morocco job
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.
Mosques and civic halls are tall volumes in masonry and tile with long decay times.
Work reaching us from Morocco is mostly manufacturing plants, hotels and riads, offices, restaurants, schools, hospitals.
- Two very different markets Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
- Traditional buildings, hard surfaces Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
- Tanger Med is a major hub Frequent sailings and good onward connections make this one of the easier African routes to plan around.
- Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Morocco.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Wood wool acoustic panels
Wood fibre bound into a rigid board with an open texture. In Morocco, split units with condensers in courtyards and light wells, running hard through long summers.
On a cavity. Mounted on battens with an air gap, which is where the low mid performance comes from.
-

Layer 2
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Morocco, mosques and civic halls are tall volumes in masonry and tile with long decay times.
Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.
-

Layer 3
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Morocco, school buildings are hard surfaced with high ceilings and courtyards that amplify break time noise.
Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.
For a Morocco practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.
03 / On the ground
What decides the build-up in Morocco
- Two very different markets
Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
- Traditional buildings, hard surfaces
Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
- Tanger Med is a major hub
Frequent sailings and good onward connections make this one of the easier African routes to plan around.
- Hot and dry inland, humid on the coast
PET felt is stable in both and does not sag, shed fibre or hold moisture.
- Assembly and performance rooms
Mosques and civic halls are tall volumes in masonry and tile with long decay times.
- School and campus buildings
School buildings are hard surfaced with high ceilings and courtyards that amplify break time noise.
04 / Room by room
Space by space, for Morocco briefs
-

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
- Wooden slat acoustic panels, MDF, FR MDF, HDF or HDHMR
- Ceiling baffles and clouds, 9 to 24 mm
- Acoustic carpet and rugs, High density polyester
-

Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything. Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
- Wooden slat acoustic panels, 13-3, 14-2, 28-4 and 59-5
- Ceiling baffles and clouds, Made to the drawing, standard and custom
- Acoustic carpet and rugs, Felt
-

Rear wall
The single worst surface in most halls, and the first one to treat. Frequent sailings and good onward connections make this one of the easier African routes to plan around.
- Wooden slat acoustic panels, 2440 x 192 mm and 2440 x 128 mm
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
- Acoustic carpet and rugs, 64 sq ft per pack
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Conditions
What the Morocco climate rules in and rules out
Morocco is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.
The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.
The failure we design against here is seasonal movement in timber and winter damp in unheated stock.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Straight talk
Where this kind of project usually fails
-
Absorbing the whole room and losing the back rows
This is the one that comes back as a second fit-out rather than a snag.
-
Adding speakers to fix a reverberation problem
Small on the drawing, expensive on site, and almost always found after handover.
-
Ignoring the rear wall because it is behind the audience
Small on the drawing, expensive on site, and almost always found after handover.
-
Treating it as a generic Morocco job
Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
05 / Logistics
What the route into Morocco actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Tanger Med or Casablanca, then road to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Tanger Med |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Tanger Med or Casablanca, then road to site. Air freight for samples and urgent quantities.
Questions from Morocco projects
What makes auditorium acoustics and soundproofing different in Morocco?
Mosques and civic halls are tall volumes in masonry and tile with long decay times. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
Where should the budget go first on a Morocco project?
Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Do you have an office or installation team in Morocco?
No. We manufacture in India and supply into Morocco. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Morocco site?
ships from: Palwal, Haryana, India, arrives at: Tanger Med or Casablanca, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.