Home > Morocco > Auditorium acoustics and soundproofing

Auditorium with acoustic panels and soundproofing

For projects in Morocco

Auditorium acoustics and soundproofing in Morocco

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Mosques and civic halls are tall volumes in masonry and tile with long decay times.

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Rear wall
The single worst surface in most halls, and the first one to treat.
Quote
From a plan and a section, within 48 hours

01 / Start here

The material, and what it actually does on a Morocco job

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.

Mosques and civic halls are tall volumes in masonry and tile with long decay times.

Work reaching us from Morocco is mostly manufacturing plants, hotels and riads, offices, restaurants, schools, hospitals.

  • Two very different markets Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.
  • Traditional buildings, hard surfaces Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.
  • Tanger Med is a major hub Frequent sailings and good onward connections make this one of the easier African routes to plan around.
  • Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Morocco.

Auditorium soundproofing Wood wool acoustic panels

02 / The build-up

The stack, in the order it is installed

  1. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 1

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Morocco, split units with condensers in courtyards and light wells, running hard through long summers.

    On a cavity. Mounted on battens with an air gap, which is where the low mid performance comes from.

  2. PET acoustic felt wall panels in office interior

    Layer 2

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Morocco, mosques and civic halls are tall volumes in masonry and tile with long decay times.

    Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.

  3. Acoustic hanging ceiling baffles in a large open space

    Layer 3

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Morocco, school buildings are hard surfaced with high ceilings and courtyards that amplify break time noise.

    Mixed with services. Set out around ducts, trays and lighting rather than fighting them, coordinated from your reflected ceiling plan.

For a Morocco practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / On the ground

What decides the build-up in Morocco

  • Two very different markets

    Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.

  • Traditional buildings, hard surfaces

    Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.

  • Tanger Med is a major hub

    Frequent sailings and good onward connections make this one of the easier African routes to plan around.

  • Hot and dry inland, humid on the coast

    PET felt is stable in both and does not sag, shed fibre or hold moisture.

  • Assembly and performance rooms

    Mosques and civic halls are tall volumes in masonry and tile with long decay times.

  • School and campus buildings

    School buildings are hard surfaced with high ceilings and courtyards that amplify break time noise.

04 / Room by room

Space by space, for Morocco briefs

  • Auditorium walls with wood wool, felt and wooden slats

    Reverberation time

    Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.

  • Auditorium ceiling with acoustic baffles and clouds

    Early reflections

    Shaped surfaces that send energy to the rear seats rather than absorbing everything. Tile, stone and plaster in tall rooms hold sound for a long time, and the structure usually cannot be altered.

  • Auditorium floor with acoustic carpeting

    Rear wall

    The single worst surface in most halls, and the first one to treat. Frequent sailings and good onward connections make this one of the easier African routes to plan around.

Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.

04 / Conditions

What the Morocco climate rules in and rules out

Morocco is hot dry summers and mild wet winters, and that narrows the material list before acoustics is discussed.

The swing between a dry summer and a wet winter moves timber. PET felt is dimensionally stable across that swing; slat panels want a stable substrate and a ventilated fixing.

The failure we design against here is seasonal movement in timber and winter damp in unheated stock.

Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.

06 / Straight talk

Where this kind of project usually fails

  • Absorbing the whole room and losing the back rows

    This is the one that comes back as a second fit-out rather than a snag.

  • Adding speakers to fix a reverberation problem

    Small on the drawing, expensive on site, and almost always found after handover.

  • Ignoring the rear wall because it is behind the audience

    Small on the drawing, expensive on site, and almost always found after handover.

  • Treating it as a generic Morocco job

    Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.

05 / Logistics

What the route into Morocco actually looks like

Supply into Morocco
Ships fromPalwal, Haryana, India
Arrives atTanger Med or Casablanca, then road to site
Dispatch4 to 7 working days
FreightSea via Tanger Med
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Tanger Med or Casablanca, then road to site. Air freight for samples and urgent quantities.

FAQ

Questions from Morocco projects

What makes auditorium acoustics and soundproofing different in Morocco?

Mosques and civic halls are tall volumes in masonry and tile with long decay times. Automotive and component plants need enclosure and mass. Hospitality in older buildings needs shallow internal work. We quote them differently.

Where should the budget go first on a Morocco project?

Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.

Do you have an office or installation team in Morocco?

No. We manufacture in India and supply into Morocco. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Morocco site?

ships from: Palwal, Haryana, India, arrives at: Tanger Med or Casablanca, then road to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.