For projects in Montreal
Cinema and multiplex soundproofing in Montreal
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Community centres, school gymnasiums and church halls carry speech, music and sport in the same hard volume.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
The product, described honestly, for a Montreal brief
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Community centres, school gymnasiums and church halls carry speech, music and sport in the same hard volume.
Work reaching us from Montreal is mostly plex and condo housing, studios and rehearsal rooms, offices, restaurants, schools, clinics.
- Plex floors pass everything Stacked flats with timber joists send footfall and speech straight down. A resilient layer under the new floor does more than any ceiling treatment below it.
- A city that makes a lot of noise on purpose Rehearsal rooms, studios and practice spaces in residential buildings are normal here. Isolation is what keeps them viable, not absorption.
- The port is in the city Containers come up the St Lawrence and land in Montreal itself, which keeps the road leg short and the landed cost predictable.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Montreal.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Montreal, forced air heating runs most of the year, so duct-borne noise and return air paths carry sound between rooms as reliably as the walls do.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
-

Layer 2
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Montreal, community centres, school gymnasiums and church halls carry speech, music and sport in the same hard volume.
Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.
-

Layer 3
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Montreal, school buildings run hard floors and lay-in tile with long heating seasons and sealed envelopes, so rooms stay live and mechanical noise is always present.
Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.
If you are specifying for a Montreal project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / What drives the brief
The Montreal conditions that change the answer
- Plex floors pass everything
Stacked flats with timber joists send footfall and speech straight down. A resilient layer under the new floor does more than any ceiling treatment below it.
- A city that makes a lot of noise on purpose
Rehearsal rooms, studios and practice spaces in residential buildings are normal here. Isolation is what keeps them viable, not absorption.
- The port is in the city
Containers come up the St Lawrence and land in Montreal itself, which keeps the road leg short and the landed cost predictable.
- Long sealed winters
Buildings close up for months and mechanical systems run hard. Noise stops escaping and accumulates inside instead.
- Assembly and performance rooms
Community centres, school gymnasiums and church halls carry speech, music and sport in the same hard volume.
04 / Room by room
What each space in a Montreal project needs
-

Screen to screen
Independent construction between auditoria, with services broken at the line. Stacked flats with timber joists send footfall and speech straight down. A resilient layer under the new floor does more than any ceiling treatment below it.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic carpet and rugs, High density polyester
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Rehearsal rooms, studios and practice spaces in residential buildings are normal here. Isolation is what keeps them viable, not absorption.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic carpet and rugs, Felt
-

Plant and projection
Equipment noise into the auditorium, treated at source. Containers come up the St Lawrence and land in Montreal itself, which keeps the road leg short and the landed cost predictable.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Soundproofing materials, ASTM E90 for the barrier, ASTM C423 for the absorber
- Acoustic carpet and rugs, 64 sq ft per pack
For a Montreal interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Climate
The Montreal climate decides the material list
Montreal is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Worth knowing
Where this kind of project usually fails
-
A shared service void running across the wall line
The ceiling is almost always the largest untreated surface, so leaving it out means paying for panels that cannot reach the target.
-
Treating the auditorium to fix bleed from the next screen
This is the one that comes back as a second fit-out rather than a snag.
-
Doors and lobbies specified late and undersized
A gap undoes the partition it sits in. Sealing is the cheapest line on the quote and the first one to get cut.
-
Treating it as a generic Montreal job
Stacked flats with timber joists send footfall and speech straight down. A resilient layer under the new floor does more than any ceiling treatment below it.
05 / Getting it there
What the route into Montreal actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Port of Montreal, then a short road run to site |
| Dispatch | 4 to 7 working days |
| Freight | Sea into Port of Montreal |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
Sea freight into the Port of Montreal, then a short road run to site. Air freight for samples and urgent quantities.
Questions from Montreal projects
What makes cinema and multiplex soundproofing different in Montreal?
Community centres, school gymnasiums and church halls carry speech, music and sport in the same hard volume. Stacked flats with timber joists send footfall and speech straight down. A resilient layer under the new floor does more than any ceiling treatment below it.
Where should the budget go first on a Montreal project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Montreal?
No. We manufacture in India and supply into Montreal. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Montreal site?
ships from: Palwal, Haryana, India, arrives at: Port of Montreal, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send a plan and a section, get a real build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.