Home > Montreal > HVAC, plant and machine noise control

HVAC duct and condenser noise control in Abu Dhabi

For projects in Montreal

HVAC, plant and machine noise control in Montreal

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space. Forced air heating runs most of the year, so duct-borne noise and return air paths carry sound between rooms as reliably as the walls do.

At source
Enclosure, barrier or anti vibration mounts at the machine.
In the path
Duct lining, attenuators and lagging on the first run out of the plant.
At the receiver
Only after the first two, and only for what is left.
Quote
From a plan and a section, within 48 hours

01 / What it is

The material, and what it actually does on a Montreal job

Noise with a source. Almost every honest fix is at the machine, the duct or the plant room, and almost nothing useful happens by lining the far wall of the occupied space.

Forced air heating runs most of the year, so duct-borne noise and return air paths carry sound between rooms as reliably as the walls do.

Work reaching us from Montreal is mostly plex and condo housing, studios and rehearsal rooms, offices, restaurants, schools, clinics.

  • Plex floors pass everything Stacked flats with timber joists send footfall and speech straight down. A resilient layer under the new floor does more than any ceiling treatment below it.
  • A city that makes a lot of noise on purpose Rehearsal rooms, studios and practice spaces in residential buildings are normal here. Isolation is what keeps them viable, not absorption.
  • The port is in the city Containers come up the St Lawrence and land in Montreal itself, which keeps the road leg short and the landed cost predictable.
  • At source Enclosure, barrier or anti vibration mounts at the machine.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for HVAC and plant noise control are on the main product page. This page covers what that means for a project in Montreal.

HVAC duct soundproofing Machine noise control

02 / The build-up

How the layers stack, from the structure inwards

  1. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 1

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Montreal, forced air heating runs most of the year, so duct-borne noise and return air paths carry sound between rooms as reliably as the walls do.

    Duct and plant wrap. Membrane wrapped over the duct with a decoupling layer beneath, sealed at every lap.

  2. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 2

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Montreal, community centres, school gymnasiums and church halls carry speech, music and sport in the same hard volume.

    Direct fix. Mechanically fixed to the soffit or wall. Durable and simple.

  3. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 3

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Montreal, school buildings run hard floors and lay-in tile with long heating seasons and sealed envelopes, so rooms stay live and mechanical noise is always present.

    First reflection points. Mirror trick placement on side walls and ceiling, which is a handful of panels rather than a lined room.

For a Montreal practice, the useful thing is a detail you can put in a drawing set, not a brochure. See how we support architects.

03 / On the ground

What the buildings in Montreal do to the specification

  • Plex floors pass everything

    Stacked flats with timber joists send footfall and speech straight down. A resilient layer under the new floor does more than any ceiling treatment below it.

  • A city that makes a lot of noise on purpose

    Rehearsal rooms, studios and practice spaces in residential buildings are normal here. Isolation is what keeps them viable, not absorption.

  • The port is in the city

    Containers come up the St Lawrence and land in Montreal itself, which keeps the road leg short and the landed cost predictable.

  • Long sealed winters

    Buildings close up for months and mechanical systems run hard. Noise stops escaping and accumulates inside instead.

  • Plant and HVAC

    Forced air heating runs most of the year, so duct-borne noise and return air paths carry sound between rooms as reliably as the walls do.

04 / Room by room

Space by space, for Montreal briefs

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

04 / Climate and durability

Durability in Montreal, before acoustics is discussed

Montreal is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The failure we design against here is condensation behind linings in older, poorly insulated stock.

Where a consultant is already engaged on a Montreal project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Before you buy

What we watch go wrong on jobs like this

  • Absorption on the office wall for a plant room problem

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Lagging a duct that is carrying the noise as breakout from the fan

    Plant noise treated as a room problem is the most reliable way to spend a budget and change nothing anyone can hear.

  • Ignoring structure borne vibration through the mounts

    Small on the drawing, expensive on site, and almost always found after handover.

  • Treating it as a generic Montreal job

    Stacked flats with timber joists send footfall and speech straight down. A resilient layer under the new floor does more than any ceiling treatment below it.

05 / Supply

What the route into Montreal actually looks like

Supply into Montreal
Ships fromPalwal, Haryana, India
Arrives atPort of Montreal, then a short road run to site
Dispatch4 to 7 working days
FreightSea into Port of Montreal
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

Sea freight into the Port of Montreal, then a short road run to site. Air freight for samples and urgent quantities.

FAQ

Questions from Montreal projects

What makes HVAC, plant and machine noise control different in Montreal?

Forced air heating runs most of the year, so duct-borne noise and return air paths carry sound between rooms as reliably as the walls do. Stacked flats with timber joists send footfall and speech straight down. A resilient layer under the new floor does more than any ceiling treatment below it.

Where should the budget go first on a Montreal project?

At source. Enclosure, barrier or anti vibration mounts at the machine. In the path. Duct lining, attenuators and lagging on the first run out of the plant.

Do you have an office or installation team in Montreal?

No. We manufacture in India and supply into Montreal. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Montreal site?

ships from: Palwal, Haryana, India, arrives at: Port of Montreal, then a short road run to site, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. The sea leg from India is long, so plan the full door to door window into the programme. We give real dates, not optimistic ones.

What goes wrong most often on this kind of project?

Absorption on the office wall for a plant room problem. Lagging a duct that is carrying the noise as breakout from the fan.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.