For projects in Mohali
Cinema and multiplex soundproofing in Mohali
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes. Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.
- Screen to screen
- Independent construction between auditoria, with services broken at the line.
- In room response
- Heavy absorption on side and rear walls so the mix is heard as intended.
- Plant and projection
- Equipment noise into the auditorium, treated at source.
- Quote
- From a plan and a section, within 48 hours
01 / The product
What this material is and where it earns its place in Mohali
Screens stacked beside and above each other, each running full range at high level. Bleed between auditoria is the failure everyone hears, and it is decided by the shell, not the finishes.
Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.
Work reaching us from Mohali is mostly IT campuses, pharmaceutical plants, institutional buildings, offices, schools, clinics.
- New build, decisions still open On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.
- Clean and controlled areas Pharmaceutical spaces where mechanical noise is a design problem rather than a comfort one.
- IT floors, hard finishes Open plans with glass and hard flooring carry every call. The ceiling plane usually has to do the work.
- Screen to screen Independent construction between auditoria, with services broken at the line.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for cinema soundproofing are on the main product page. This page covers what that means for a project in Mohali.
02 / The build-up
The stack, in the order it is installed
-

Layer 1
Soundproofing materials
The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Mohali, agro processing and light engineering plant, with generator sets and machinery close to occupied buildings.
Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Mohali, auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.
Wall array. Panels placed at first reflection points rather than spread evenly. Fewer panels, better result.
-

Layer 3
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Mohali, large school and college campuses in concrete and tile, with halls carrying assembly and performance.
Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / In this market
What decides the build-up in Mohali
- New build, decisions still open
On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.
- Clean and controlled areas
Pharmaceutical spaces where mechanical noise is a design problem rather than a comfort one.
- IT floors, hard finishes
Open plans with glass and hard flooring carry every call. The ceiling plane usually has to do the work.
- Next day from the plant
A few hours by road, so samples and replacements are straightforward.
- Assembly and performance rooms
Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.
04 / Room by room
Where the money goes on a Mohali project
-

Screen to screen
Independent construction between auditoria, with services broken at the line. On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.
- SoundBlanket mass loaded vinyl, 2100 kg per cubic metre
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- PET felt acoustic panels, 4 to 24 mm
-

In room response
Heavy absorption on side and rear walls so the mix is heard as intended. Pharmaceutical spaces where mechanical noise is a design problem rather than a comfort one.
- SoundBlanket mass loaded vinyl, STC 30, 5.25 kg per sq m
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- PET felt acoustic panels, 1220 x 2440 mm standard, 4 x 8 ft
-

Plant and projection
Equipment noise into the auditorium, treated at source. Open plans with glass and hard flooring carry every call. The ceiling plane usually has to do the work.
- SoundBlanket mass loaded vinyl, STC 34, 8.4 kg per sq m
- Acoustic panels, ASTM C423
- PET felt acoustic panels, 2440 x 4270 mm, 2.44 x 4.27 m, 8 x 14 ft
Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.
04 / Climate
What the Mohali climate rules in and rules out
Mohali is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.
PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.
The failure we design against here is wet-season humidity behind linings.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Straight talk
The six errors that cost the most
-
A shared service void running across the wall line
Square metre for square metre the ceiling is the cheapest result in the room. Skipping it and buying wall panels instead is the most common way to overspend.
-
Treating the auditorium to fix bleed from the next screen
This is the one that comes back as a second fit-out rather than a snag.
-
Doors and lobbies specified late and undersized
A 6 mm undercut under a door leaves a hole the size of a brick. The wall around it is then decorative.
-
Treating it as a generic Mohali job
On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.
05 / Route to site
How material reaches a Mohali site
| Made at | Our own plant, Palwal, Haryana |
|---|---|
| Reaches site in | next day |
| Dispatch | 2 to 4 working days |
| To site | next day |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
By road from Palwal, roughly three hundred kilometres, normally next day on a dedicated truck.
Questions from Mohali projects
What makes cinema and multiplex soundproofing different in Mohali?
Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey. On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.
Where should the budget go first on a Mohali project?
Screen to screen. Independent construction between auditoria, with services broken at the line. In room response. Heavy absorption on side and rear walls so the mix is heard as intended.
Do you have an office or installation team in Mohali?
No. We manufacture in India and supply into Mohali. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Mohali site?
made at: Our own plant, Palwal, Haryana, reaches site in: next day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
A shared service void running across the wall line. Treating the auditorium to fix bleed from the next screen.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Drawings in, BOQ and a delivered date out
We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.