Home > Mohali > Auditorium acoustics and soundproofing

Auditorium with acoustic panels and soundproofing

For projects in Mohali

Auditorium acoustics and soundproofing in Mohali

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Rear wall
The single worst surface in most halls, and the first one to treat.
Quote
From a plan and a section, within 48 hours

01 / What it is

The product, described honestly, for a Mohali brief

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.

Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.

Work reaching us from Mohali is mostly IT campuses, pharmaceutical plants, institutional buildings, offices, schools, clinics.

  • New build, decisions still open On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.
  • Clean and controlled areas Pharmaceutical spaces where mechanical noise is a design problem rather than a comfort one.
  • IT floors, hard finishes Open plans with glass and hard flooring carry every call. The ceiling plane usually has to do the work.
  • Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Mohali.

Auditorium soundproofing Wood wool acoustic panels

02 / The build-up

What goes where, from the structure in

  1. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 1

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Mohali, agro processing and light engineering plant, with generator sets and machinery close to occupied buildings.

    With a porous backing. Board over mineral backing where the room needs more than the board alone gives.

  2. Acoustic hanging ceiling baffles in a large open space

    Layer 2

    Ceiling baffles and clouds

    PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Mohali, auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.

    Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.

  3. Acoustic carpet tiles and rugs on a modern floor

    Layer 3

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Mohali, large school and college campuses in concrete and tile, with halls carrying assembly and performance.

    Zoned. Carpet in the circulation and meeting zones, hard floor elsewhere, so the treatment sits where the noise is made.

If you are specifying for a Mohali project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / Local conditions

What the buildings in Mohali do to the specification

  • New build, decisions still open

    On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.

  • Clean and controlled areas

    Pharmaceutical spaces where mechanical noise is a design problem rather than a comfort one.

  • IT floors, hard finishes

    Open plans with glass and hard flooring carry every call. The ceiling plane usually has to do the work.

  • Next day from the plant

    A few hours by road, so samples and replacements are straightforward.

  • Assembly and performance rooms

    Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.

  • School and campus buildings

    Large school and college campuses in concrete and tile, with halls carrying assembly and performance.

04 / Room by room

What each space in a Mohali project needs

  • Auditorium walls with wood wool, felt and wooden slats

    Reverberation time

    Set against use. Speech and music want different numbers, and a dual use hall needs a decision. On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.

  • Auditorium ceiling with acoustic baffles and clouds

    Early reflections

    Shaped surfaces that send energy to the rear seats rather than absorbing everything. Pharmaceutical spaces where mechanical noise is a design problem rather than a comfort one.

  • Auditorium floor with acoustic carpeting

    Rear wall

    The single worst surface in most halls, and the first one to treat. Open plans with glass and hard flooring carry every call. The ceiling plane usually has to do the work.

For a Mohali interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Durability

The Mohali climate decides the material list

Mohali is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

On a Mohali job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Worth knowing

Six mistakes that turn into a second fit-out

  • Absorbing the whole room and losing the back rows

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Adding speakers to fix a reverberation problem

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Ignoring the rear wall because it is behind the audience

    Small on the drawing, expensive on site, and almost always found after handover.

  • Treating it as a generic Mohali job

    On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.

05 / Getting it there

Supply into Mohali, start to site

Supply into Mohali
Made atOur own plant, Palwal, Haryana
Reaches site innext day
Dispatch2 to 4 working days
To sitenext day
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

By road from Palwal, roughly three hundred kilometres, normally next day on a dedicated truck.

FAQ

Questions from Mohali projects

What makes auditorium acoustics and soundproofing different in Mohali?

Auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey. On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.

Where should the budget go first on a Mohali project?

Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.

Do you have an office or installation team in Mohali?

No. We manufacture in India and supply into Mohali. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Mohali site?

made at: Our own plant, Palwal, Haryana, reaches site in: next day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send the drawings, get a straight answer

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.