Home > Mohali > Soundproofing materials

Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

Manufactured in India, supplied in Mohali

Soundproofing materials in Mohali

We manufacture soundproofing materials at our own plant at Palwal in Haryana, India, and supply them into Mohali. Mohali is a planned city with IT and pharmaceutical campuses, so the work is new buildings rather than retrofits.

SoundBlanket MLV
2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc
1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
Principle
Mass, then decoupling, then cavity absorption, then sealing
Test standards
ASTM E90 for the barrier, ASTM C423 for the absorber
Lead time
4 to 7 working days for stock items
  • ASTM E90 for the barrier, ASTM C423 for the absorber
  • Made at our own plant, Palwal, Haryana, India
  • One batch across the order, no blending between runs

This comes from our own plant, not a trading desk. We do not have an office in your city and we will not invent one. What we can give you is factory pricing, consistent material and a technical answer before you commit.

01 / The product

What this is, and what it changes in a Mohali room

The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. This is the page for someone whose problem is noise getting through, not a room that sounds wrong.

Work reaching us from Mohali is mostly IT campuses, pharmaceutical plants, institutional buildings, offices, schools, clinics.

Independent houses and RC frame apartments with stone and tile floors, in towns with agricultural and light industrial activity nearby.

  • Independent leaf A second wall that does not touch the first. Nothing else comes close for the money.
  • Resilient bar Where a full independent leaf will not fit. Effective, and very easy to short circuit with one wrong screw.
  • Floating floor Resilient layer and deck, to break impact energy before it reaches the structure.
  • What it will not do Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for our soundproofing materials are on the main product page. This page covers what that means for a project in Mohali.

SoundBlanket mass loaded vinyl BassBloc sound absorber Wall soundproofing systems

02 / Data sheet

The published figures, unchanged by location

The specification below is the same everywhere we supply, because a specification that changed by city would not be a specification. What changes is which grade and build-up is the right buy, and that is what the rest of this page is about.

  • Light retrofit2.5 mm membrane. Where depth is not available
  • Standard partition4 mm membrane on an independent leaf. The common specification
  • Heavy6 mm membrane and full decoupling. Plant, machine enclosure, low frequency
Soundproofing materials: published specification
SoundBlanket MLV2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
BassBloc1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
PrincipleMass, then decoupling, then cavity absorption, then sealing
Test standardsASTM E90 for the barrier, ASTM C423 for the absorber

On a Mohali job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

03 / In this market

What the buildings in Mohali do to the specification

  • New build, decisions still open

    On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.

  • Clean and controlled areas

    Pharmaceutical spaces where mechanical noise is a design problem rather than a comfort one.

  • IT floors, hard finishes

    Open plans with glass and hard flooring carry every call. The ceiling plane usually has to do the work.

  • Next day from the plant

    A few hours by road, so samples and replacements are straightforward.

  • Plant and HVAC

    Agro processing and light engineering plant, with generator sets and machinery close to occupied buildings.

  • The housing stock

    Independent houses and RC frame apartments with stone and tile floors, in towns with agricultural and light industrial activity nearby.

Architects working in Mohali usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

04 / Conditions

Durability in Mohali, before acoustics is discussed

Mohali is hot summers, mild winters and a distinct wet season, and that narrows the sensible material list before acoustics is even discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The risk we design against here is wet-season humidity behind linings.

For a Mohali interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

05 / Getting it there

How material reaches a Mohali site

Supply into Mohali
Made atOur own plant, Palwal, Haryana
Reaches site innext day
Dispatch2 to 4 working days
To sitenext day
PackingRolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.
Lead time4 to 7 working days for stock items.

Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

By road from Palwal, roughly three hundred kilometres, normally next day on a dedicated truck.

06 / Worth knowing

Where this goes wrong, said plainly

  • The wrong product for the problem

    Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

  • Square footage quoted before the room is understood

    Anyone can price a wall. Working out how much material the room actually needs usually reduces the order, which is why not everyone does it.

  • Suppliers who imply a Mohali presence

    Ask any supplier where the material is made and who carries the warranty. We make it at Palwal in Haryana and we say so on every page, including this one.

07 / In projects

The material in real interiors

Acoustic curtains
Acoustic curtains
Acoustic fabric panels
Acoustic fabric panels
Custom soundproofing systems
Custom soundproofing systems
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Acoustic wall panels in an airport lounge, soundproofing materials in Abu Dhabi
Auditorium with wooden acoustic wall and ceiling treatment
Auditorium with wooden acoustic wall and ceiling treatment
Cinema hall with fabric acoustic wall panels
Cinema hall with fabric acoustic wall panels
FAQ

Mohali: questions we are actually asked

Is there a Mohali factory behind this product?

No, and we will not say otherwise. We manufacture at our own plant at Palwal in Haryana, India, and supply into Mohali as the manufacturer rather than through a dealer. Mohali is a planned city with IT and pharmaceutical campuses, so the work is new buildings rather than retrofits. You buy at factory prices with one consistent batch across the order.

What changes the specification on a Mohali job?

On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover. Pharmaceutical spaces where mechanical noise is a design problem rather than a comfort one. Those two things move the build-up far more than the panel figure does.

Will this material last in the Mohali climate?

Mohali is hot summers, mild winters and a distinct wet season. PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH. The failure we design against here is wet-season humidity behind linings.

What is the delivery time into Mohali?

made at: Our own plant, Palwal, Haryana, reaches site in: next day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

Where do soundproofing materials fail to help?

Soundproofing fails at the gaps, not the materials. A service penetration, a back to back socket, or a door undercut will undo a correctly built wall. We would rather spend the conversation on the detail than on the product.

Is there a minimum order, and how does it arrive?

Minimum order is confirmed with the quote. Rolls on core tubes, boards palletised, fixings and tapes listed on the same packing list.

Next step

Drawings in, BOQ and a delivered date out

We quote from drawings, not from a square foot rate. Send a plan and the section through the critical wall or ceiling and you will get something you can actually build from.