Home > Mohali > Recording studio acoustics and soundproofing

Recording studio with acoustic treatment and soundproofing

For projects in Mohali

Recording studio acoustics and soundproofing in Mohali

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later. Studios go into basements, terrace rooms and back rooms with neighbours on every side and a generator somewhere in the lane. Isolating from the building has to come before treating the room.

Isolation
A measured background level, agreed before anything is bought.
Low frequency
Corner and boundary absorption with real depth, not surface foam.
Early reflections
Controlled at the mix position, and only there.
Quote
From a plan and a section, within 48 hours

01 / The product

What you are buying, and what it fixes in Mohali

Two jobs that must not be confused: keeping the building out, and making the room honest inside. The first is mass and decoupling and has to be built first. The second is absorption and diffusion and can be tuned later.

Studios go into basements, terrace rooms and back rooms with neighbours on every side and a generator somewhere in the lane. Isolating from the building has to come before treating the room.

Work reaching us from Mohali is mostly IT campuses, pharmaceutical plants, institutional buildings, offices, schools, clinics.

  • New build, decisions still open On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.
  • Clean and controlled areas Pharmaceutical spaces where mechanical noise is a design problem rather than a comfort one.
  • IT floors, hard finishes Open plans with glass and hard flooring carry every call. The ceiling plane usually has to do the work.
  • Isolation A measured background level, agreed before anything is bought.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for studio soundproofing are on the main product page. This page covers what that means for a project in Mohali.

Recording studio soundproofing Acoustic foam and bass traps

02 / The build-up

The stack, in the order it is installed

  1. Acoustic Foam Panels & Echo Control in Abu Dhabi

    Layer 1

    Acoustic foam and BassBloc

    Open cell foam shapes for high frequency control, and BassBloc, a high density absorber built for the low mid range where ordinary foam does nothing. In Mohali, agro processing and light engineering plant, with generator sets and machinery close to occupied buildings.

    First reflection points. Mirror trick placement on side walls and ceiling, which is a handful of panels rather than a lined room.

  2. SoundBlanket mass loaded vinyl soundproofing membrane used in projects in Abu Dhabi

    Layer 2

    SoundBlanket mass loaded vinyl

    A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Mohali, auditoriums, banquet halls and places of worship are large hard volumes in concrete and stone where speech falls apart long before anyone calls the room echoey.

    Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.

  3. Soundproofing Material & Noise Isolation Supplier in Abu Dhabi

    Layer 3

    Soundproofing materials

    The blocking side of the range taken together: mass loaded vinyl, resilient layers, cavity absorption and the build-ups they belong in. In Mohali, large school and college campuses in concrete and tile, with halls carrying assembly and performance.

    Independent leaf. A second wall that does not touch the first. Nothing else comes close for the money.

If you are specifying for a Mohali project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.

03 / Local conditions

What we see driving Mohali briefs

  • New build, decisions still open

    On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.

  • Clean and controlled areas

    Pharmaceutical spaces where mechanical noise is a design problem rather than a comfort one.

  • IT floors, hard finishes

    Open plans with glass and hard flooring carry every call. The ceiling plane usually has to do the work.

  • Next day from the plant

    A few hours by road, so samples and replacements are straightforward.

  • The housing stock

    Independent houses and RC frame apartments with stone and tile floors, in towns with agricultural and light industrial activity nearby.

  • The studio and content scene

    Studios go into basements, terrace rooms and back rooms with neighbours on every side and a generator somewhere in the lane. Isolating from the building has to come before treating the room.

04 / Room by room

Room by room, on a typical Mohali job

Designers get colour, pattern and CNC options with the absorption figure attached to each. See how we work with interior designers.

04 / Climate and durability

Durability in Mohali, before acoustics is discussed

Mohali is hot summers, mild winters and a distinct wet season, and that narrows the material list before acoustics is discussed.

PET felt handles the wet months without absorbing moisture or feeding mould. Timber and wood wool want a ventilated cavity and a stable indoor RH.

The failure we design against here is wet-season humidity behind linings.

On a Mohali job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Read this first

Six mistakes that turn into a second fit-out

  • Buying foam to solve an isolation problem

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating the room before the shell is isolated

    Small on the drawing, expensive on site, and almost always found after handover.

  • Killing the room completely and calling it controlled

    More absorption is not better absorption. Past the target the room goes flat and people raise their voices to compensate.

  • Treating it as a generic Mohali job

    On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.

05 / Getting it there

How material reaches a Mohali site

Supply into Mohali
Made atOur own plant, Palwal, Haryana
Reaches site innext day
Dispatch2 to 4 working days
To sitenext day
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

By road from Palwal, roughly three hundred kilometres, normally next day on a dedicated truck.

FAQ

Questions from Mohali projects

What makes recording studio acoustics and soundproofing different in Mohali?

Studios go into basements, terrace rooms and back rooms with neighbours on every side and a generator somewhere in the lane. Isolating from the building has to come before treating the room. On a new campus the ceiling and partition can be designed properly, which costs a fraction of fixing it after handover.

Where should the budget go first on a Mohali project?

Isolation. A measured background level, agreed before anything is bought. Low frequency. Corner and boundary absorption with real depth, not surface foam.

Do you have an office or installation team in Mohali?

No. We manufacture in India and supply into Mohali. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Mohali site?

made at: Our own plant, Palwal, Haryana, reaches site in: next day, dispatch: 2 to 4 working days. Standard items dispatch in 2 to 4 working days from our plant at Palwal. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Buying foam to solve an isolation problem. Treating the room before the shell is isolated.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Tell us the room, we will tell you the build-up

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.