Home > Manchester > Auditorium acoustics and soundproofing

Auditorium with acoustic panels and soundproofing

For projects in Manchester

Auditorium acoustics and soundproofing in Manchester

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Church buildings, civic halls and converted industrial spaces are long-decay volumes with hard surfaces throughout.

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Rear wall
The single worst surface in most halls, and the first one to treat.
Quote
From a plan and a section, within 48 hours

01 / The material

What this material is and where it earns its place in Manchester

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.

Church buildings, civic halls and converted industrial spaces are long-decay volumes with hard surfaces throughout.

Work reaching us from Manchester is mostly warehouse conversions, student housing, studios, bars, offices, schools.

  • Warehouse conversions Exposed brick, timber joists and steel look superb and hold nothing back. Neighbour noise between units is the first complaint, echo the second.
  • Student and build to rent blocks Repeat rooms mean a repeatable detail. Get the wall and floor build-up right once and it works across every level.
  • Metrolink and city centre traffic Ground level trams and buses put low frequency into the structure, which panels on the wall will not touch.
  • Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Manchester.

Auditorium soundproofing Wood wool acoustic panels

02 / The build-up

The build-up, layer by layer

  1. Wood wool acoustic panels for walls and ceilings in Abu Dhabi

    Layer 1

    Wood wool acoustic panels

    Wood fibre bound into a rigid board with an open texture. In Manchester, radiators and open windows in older stock, mechanical ventilation in new build, so the noise source depends on the age of the building.

    With a porous backing. Board over mineral backing where the room needs more than the board alone gives.

  2. Acoustic wooden slat wall and ceiling in a premium auditorium

    Layer 2

    Wooden slat acoustic panels

    Timber slats on an acoustic backing. In Manchester, church buildings, civic halls and converted industrial spaces are long-decay volumes with hard surfaces throughout.

    Slats on felt backing. The standard. Absorption comes from the backing behind the gaps, so the slat gap ratio is an acoustic decision, not only a visual one.

  3. PET acoustic felt wall panels in office interior

    Layer 3

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Manchester, school buildings run hard floors and long corridors, with sports halls and dining halls the loudest rooms.

    On a 25 to 50 mm air gap. The same panel on battens. The air gap moves absorption down in frequency at no extra material cost, and is the cheapest improvement available.

Architects working in Manchester usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / On the ground

What we see driving Manchester briefs

  • Warehouse conversions

    Exposed brick, timber joists and steel look superb and hold nothing back. Neighbour noise between units is the first complaint, echo the second.

  • Student and build to rent blocks

    Repeat rooms mean a repeatable detail. Get the wall and floor build-up right once and it works across every level.

  • Metrolink and city centre traffic

    Ground level trams and buses put low frequency into the structure, which panels on the wall will not touch.

  • Wet climate

    PET felt does not take up moisture or feed mould, which suits older brick stock and cold external walls.

  • Assembly and performance rooms

    Church buildings, civic halls and converted industrial spaces are long-decay volumes with hard surfaces throughout.

  • School and campus buildings

    School buildings run hard floors and long corridors, with sports halls and dining halls the loudest rooms.

04 / Room by room

Room by room, on a typical Manchester job

  • Auditorium walls with wood wool, felt and wooden slats

    Reverberation time

    Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Exposed brick, timber joists and steel look superb and hold nothing back. Neighbour noise between units is the first complaint, echo the second.

  • Auditorium ceiling with acoustic baffles and clouds

    Early reflections

    Shaped surfaces that send energy to the rear seats rather than absorbing everything. Repeat rooms mean a repeatable detail. Get the wall and floor build-up right once and it works across every level.

  • Auditorium floor with acoustic carpeting

    Rear wall

    The single worst surface in most halls, and the first one to treat. Ground level trams and buses put low frequency into the structure, which panels on the wall will not touch.

If the visual is fixed and the room still has to perform, that is a solvable problem and a conversation worth having early. See how we work with interior designers.

04 / Climate

Why the climate in Manchester changes the material, not the target

Manchester is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.

Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.

The failure we design against here is condensation behind linings in older, poorly insulated stock.

On a Manchester job with a consultant involved, our part is material that matches the submitted data. See working with acoustic consultants.

06 / Worth knowing

Where this kind of project usually fails

  • Absorbing the whole room and losing the back rows

    Small on the drawing, expensive on site, and almost always found after handover.

  • Adding speakers to fix a reverberation problem

    This is the one that comes back as a second fit-out rather than a snag.

  • Ignoring the rear wall because it is behind the audience

    This is the one that comes back as a second fit-out rather than a snag.

  • Treating it as a generic Manchester job

    Exposed brick, timber joists and steel look superb and hold nothing back. Neighbour noise between units is the first complaint, echo the second.

05 / Logistics

Supply into Manchester, start to site

Supply into Manchester
Ships fromPalwal, Haryana, India
Arrives atLiverpool, Felixstowe or Southampton
Dispatch4 to 7 working days
FreightSea via Liverpool
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we tell you before you order.

Sea freight into Liverpool, Felixstowe or Southampton. Air freight for samples and urgent quantities. Clearance through your agent or ours.

FAQ

Questions from Manchester projects

What makes auditorium acoustics and soundproofing different in Manchester?

Church buildings, civic halls and converted industrial spaces are long-decay volumes with hard surfaces throughout. Exposed brick, timber joists and steel look superb and hold nothing back. Neighbour noise between units is the first complaint, echo the second.

Where should the budget go first on a Manchester project?

Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.

Do you have an office or installation team in Manchester?

No. We manufacture in India and supply into Manchester. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Manchester site?

ships from: Palwal, Haryana, India, arrives at: Liverpool, Felixstowe or Southampton, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we tell you before you order.

What goes wrong most often on this kind of project?

Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Drawings in, BOQ and a delivered date out

A plan and a section is enough. We will come back with a build-up, a BOQ and a delivered date, and we will say so if what you are asking for will not work.