For projects in London
Auditorium acoustics and soundproofing in London
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Church buildings, village and parish halls, and school halls carry speech, music and sport in one long-decay volume.
- Reverberation time
- Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
- Early reflections
- Shaped surfaces that send energy to the rear seats rather than absorbing everything.
- Rear wall
- The single worst surface in most halls, and the first one to treat.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
What this is, and what it changes in a London room
A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.
Church buildings, village and parish halls, and school halls carry speech, music and sport in one long-decay volume.
Work reaching us from London is mostly flat conversions, offices, studios, bars and restaurants, schools, clinics.
- Rail and Underground rumble Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.
- Single brick party walls A joist floor between two flats was never built for two households. Membrane plus an independent lining, then absorption.
- Night economy neighbours Soho, Shoreditch, Camden and Clapham venues sit under flats. Bass containment and table-level comfort are two different jobs.
- Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in London.
02 / The build-up
How the layers stack, from the structure inwards
-

Layer 1
Wooden slat acoustic panels
Timber slats on an acoustic backing. In London, older stock has radiators and open windows, newer stock has mechanical ventilation with heat recovery, so duct-borne noise is a newer problem than the buildings suggest.
Slats on felt backing. The standard. Absorption comes from the backing behind the gaps, so the slat gap ratio is an acoustic decision, not only a visual one.
-

Layer 2
PET felt acoustic panels
A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In London, church buildings, village and parish halls, and school halls carry speech, music and sport in one long-decay volume.
Over a porous backing. Panel over mineral or PET backing where the room needs genuine low mid control.
-

Layer 3
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In London, school buildings mix Victorian halls with post war system build and new academies, so hard floors, high ceilings and long corridors are the constant.
Vertical baffles. Hung on edge in rows. Both faces absorb, so coverage figures based on plan area understate them.
If you are specifying for a London project, we can give you a section, a BOQ and the honest limits of each layer. See how we support architects.
03 / In this market
What the buildings in London do to the specification
- Rail and Underground rumble
Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.
- Single brick party walls
A joist floor between two flats was never built for two households. Membrane plus an independent lining, then absorption.
- Night economy neighbours
Soho, Shoreditch, Camden and Clapham venues sit under flats. Bass containment and table-level comfort are two different jobs.
- Damp winters
PET felt does not absorb moisture, shed fibre or feed mould, which matters in older stock with cold wall build-ups.
- Assembly and performance rooms
Church buildings, village and parish halls, and school halls carry speech, music and sport in one long-decay volume.
- School and campus buildings
School buildings mix Victorian halls with post war system build and new academies, so hard floors, high ceilings and long corridors are the constant.
04 / Room by room
Room by room, on a typical London job
-

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.
- PET felt acoustic panels, 100% PET non-woven, no added binder
- Ceiling baffles and clouds, 9 to 24 mm
- Acoustic carpet and rugs, High density polyester
-

Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything. A joist floor between two flats was never built for two households. Membrane plus an independent lining, then absorption.
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Ceiling baffles and clouds, Made to the drawing, standard and custom
- Acoustic carpet and rugs, Felt
-

Rear wall
The single worst surface in most halls, and the first one to treat. Soho, Shoreditch, Camden and Clapham venues sit under flats. Bass containment and table-level comfort are two different jobs.
- PET felt acoustic panels, 4 to 24 mm
- Ceiling baffles and clouds, Both faces work, which is why suspended area outperforms the same area laid flat
- Acoustic carpet and rugs, 64 sq ft per pack
For a London interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Conditions
Durability in London, before acoustics is discussed
London is cool and damp, with long heating seasons and cold external walls, and that narrows the material list before acoustics is discussed.
Cold wall build-ups and long heating seasons mean interstitial condensation is a real risk behind any lining. PET felt is unaffected by damp air and will not feed mould where a fabric-faced mineral product would.
The failure we design against here is condensation behind linings in older, poorly insulated stock.
If a consultant has set the target, we will quote against their figures rather than ours, and stay out of the scope they own. More on working with acoustic consultants.
06 / Read this first
What we watch go wrong on jobs like this
-
Absorbing the whole room and losing the back rows
Small on the drawing, expensive on site, and almost always found after handover.
-
Adding speakers to fix a reverberation problem
It sounds like a small detail until the room is finished and the complaint arrives.
-
Ignoring the rear wall because it is behind the audience
Small on the drawing, expensive on site, and almost always found after handover.
-
Treating it as a generic London job
Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.
05 / Getting it there
Supply into London, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Felixstowe, London Gateway or Southampton |
| Dispatch | 4 to 7 working days |
| Freight | Sea and air |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we say so before you order, not after.
Sea freight to Felixstowe, London Gateway or Southampton. Air freight for samples and urgent quantities. Clearance through your agent or ours.
Questions from London projects
What makes auditorium acoustics and soundproofing different in London?
Church buildings, village and parish halls, and school halls carry speech, music and sport in one long-decay volume. Structure borne, so surface panels do nothing. It needs mass and decoupling in the floor, wall or ceiling first.
Where should the budget go first on a London project?
Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Do you have an office or installation team in London?
No. We manufacture in India and supply into London. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a London site?
ships from: Palwal, Haryana, India, arrives at: Felixstowe, London Gateway or Southampton, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.