For projects in Jordan
School and classroom acoustics in Jordan
Hard floors, bare walls and long corridors that amplify everything. Children with developing language, and anyone with a hearing difficulty, lose more from a live classroom than adults do, which is why intelligibility is the target rather than quiet. School and university buildings are stone and concrete with high ceilings and long corridors that carry every sound.
- Classroom RT
- A number, set against room volume, achieved mostly at the ceiling.
- Corridor spill
- Long hard circulation feeds every room off it. Treating the corridor helps every classroom at once.
- Halls and gyms
- Dual use rooms carrying speech, music and sport, where durability decides the product.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
What this is, and what it changes in a Jordan room
Hard floors, bare walls and long corridors that amplify everything. Children with developing language, and anyone with a hearing difficulty, lose more from a live classroom than adults do, which is why intelligibility is the target rather than quiet.
School and university buildings are stone and concrete with high ceilings and long corridors that carry every sound.
Work reaching us from Jordan is mostly hotels and hospitality, offices, institutional buildings, hospitals, schools, venues.
- Stone inside and out Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.
- Aqaba, then the drive north The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.
- Dry heat and sealed rooms Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.
- Classroom RT A number, set against room volume, achieved mostly at the ceiling.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for school acoustics are on the main product page. This page covers what that means for a project in Jordan.
02 / The build-up
The build-up, layer by layer
-

Layer 1
Ceiling baffles and clouds
PET felt suspended from the soffit, vertically as baffles or horizontally as clouds. In Jordan, split units and central plant with seasonal heating and cooling, condensers on roofs and balconies.
Horizontal clouds. Flat rafts over the occupied zone, which also reflect early speech energy back down where it helps.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Jordan, mosques, churches and civic halls are stone volumes with very long reverberation.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
-

Layer 3
Acoustic carpet and rugs
A tile carpet with a dense polyester face on a felt backing. In Jordan, school and university buildings are stone and concrete with high ceilings and long corridors that carry every sound.
Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / On the ground
What decides the build-up in Jordan
- Stone inside and out
Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.
- Aqaba, then the drive north
The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.
- Dry heat and sealed rooms
Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.
- Institutional and assembly spaces
Large halls in stone and concrete where speech stops being intelligible long before the room sounds obviously wrong.
- Assembly and performance rooms
Mosques, churches and civic halls are stone volumes with very long reverberation.
- School and campus buildings
School and university buildings are stone and concrete with high ceilings and long corridors that carry every sound.
04 / Room by room
Room by room, on a typical Jordan job
-

Classroom RT
A number, set against room volume, achieved mostly at the ceiling. Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.
- PET felt acoustic panels, 100% PET non-woven, no added binder
- Wood wool acoustic panels, 20 mm
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
-

Corridor spill
Long hard circulation feeds every room off it. Treating the corridor helps every classroom at once. The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.
- PET felt acoustic panels, 9, 12, 18 and 24 mm standard, tolerance plus or minus 5 percent
- Wood wool acoustic panels, 400 kg per cubic metre
- Acoustic panels, ASTM C423
-

Halls and gyms
Dual use rooms carrying speech, music and sport, where durability decides the product. Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.
- PET felt acoustic panels, 4 to 24 mm
- Wood wool acoustic panels, 0.30
- Acoustic panels, 9 to 24 mm, 1220 x 2440 mm standard, up to 2440 x 4270 mm, 1200 to 3600 GSM
For a Jordan interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.
04 / Climate and durability
Durability in Jordan, before acoustics is discussed
Jordan is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The failure we design against here is dust ingress and thermal movement in long runs.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Straight talk
Six mistakes that turn into a second fit-out
-
Panels at child height where they get damaged
It sounds like a small detail until the room is finished and the complaint arrives.
-
Treating one classroom and leaving the corridor
This is the one that comes back as a second fit-out rather than a snag.
-
Choosing a product that cannot take a football
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Treating it as a generic Jordan job
Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.
05 / Route to site
What the route into Jordan actually looks like
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Aqaba, then road north to Amman |
| Dispatch | 4 to 7 working days |
| Freight | Sea via Aqaba, then road |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight into Aqaba, then road north to Amman and beyond. Air freight for samples and urgent quantities.
Questions from Jordan projects
What makes school and classroom acoustics different in Jordan?
School and university buildings are stone and concrete with high ceilings and long corridors that carry every sound. Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.
Where should the budget go first on a Jordan project?
Classroom RT. A number, set against room volume, achieved mostly at the ceiling. Corridor spill. Long hard circulation feeds every room off it. Treating the corridor helps every classroom at once.
Do you have an office or installation team in Jordan?
No. We manufacture in India and supply into Jordan. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Jordan site?
ships from: Palwal, Haryana, India, arrives at: Aqaba, then road north to Amman, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Panels at child height where they get damaged. Treating one classroom and leaving the corridor.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Tell us the room, we will tell you the build-up
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.