Home > Jordan > Auditorium acoustics and soundproofing

Auditorium with acoustic panels and soundproofing

For projects in Jordan

Auditorium acoustics and soundproofing in Jordan

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem. Mosques, churches and civic halls are stone volumes with very long reverberation.

Reverberation time
Set against use. Speech and music want different numbers, and a dual use hall needs a decision.
Early reflections
Shaped surfaces that send energy to the rear seats rather than absorbing everything.
Rear wall
The single worst surface in most halls, and the first one to treat.
Quote
From a plan and a section, within 48 hours

01 / Start here

What you are buying, and what it fixes in Jordan

A large hard volume where speech falls apart long before anyone calls the room echoey. The target is intelligibility at the back row, which is a reverberation and early reflection problem, not a loudspeaker problem.

Mosques, churches and civic halls are stone volumes with very long reverberation.

Work reaching us from Jordan is mostly hotels and hospitality, offices, institutional buildings, hospitals, schools, venues.

  • Stone inside and out Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.
  • Aqaba, then the drive north The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.
  • Dry heat and sealed rooms Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.
  • Reverberation time Set against use. Speech and music want different numbers, and a dual use hall needs a decision.

Full specification

Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for auditorium acoustics are on the main product page. This page covers what that means for a project in Jordan.

Auditorium soundproofing Wood wool acoustic panels

02 / The build-up

The build-up, layer by layer

  1. Acoustic wooden slat wall and ceiling in a premium auditorium

    Layer 1

    Wooden slat acoustic panels

    Timber slats on an acoustic backing. In Jordan, split units and central plant with seasonal heating and cooling, condensers on roofs and balconies.

    Slats on a cavity. Backing plus an air gap behind moves absorption lower, which matters in music rooms.

  2. PET acoustic felt wall panels in office interior

    Layer 2

    PET felt acoustic panels

    A rigid non-woven panel pressed from 100% polyester fibre, a large part of it recycled. In Jordan, mosques, churches and civic halls are stone volumes with very long reverberation.

    Direct to wall. Panel bonded or mechanically fixed flat to the substrate. Simplest, and the weakest at low frequency.

  3. Acoustic carpet tiles and rugs on a modern floor

    Layer 3

    Acoustic carpet and rugs

    A tile carpet with a dense polyester face on a felt backing. In Jordan, school and university buildings are stone and concrete with high ceilings and long corridors that carry every sound.

    Loose lay on tackifier. Tiles lifted individually for access under a raised floor, which is why tile beats broadloom in an office.

Architects working in Jordan usually need the build-up before the product. We will draw the section and mark what does the work. See how we support architects.

03 / On the ground

What decides the build-up in Jordan

  • Stone inside and out

    Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

  • Aqaba, then the drive north

    The port is at the far south. We quote the sea leg and the road leg separately so the programme runs on real dates.

  • Dry heat and sealed rooms

    Air conditioned rooms stay closed, so sound accumulates inside and plant noise matters more than street noise.

  • Institutional and assembly spaces

    Large halls in stone and concrete where speech stops being intelligible long before the room sounds obviously wrong.

  • Assembly and performance rooms

    Mosques, churches and civic halls are stone volumes with very long reverberation.

  • School and campus buildings

    School and university buildings are stone and concrete with high ceilings and long corridors that carry every sound.

04 / Room by room

Room by room, on a typical Jordan job

For a Jordan interior where the finish leads, we will say plainly what each option costs you acoustically. See how we work with interior designers.

04 / Climate and durability

The Jordan climate decides the material list

Jordan is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.

Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.

The failure we design against here is dust ingress and thermal movement in long runs.

Where a consultant is already engaged on a Jordan project, we supply to their specification and send the test reports rather than describing them. More on working with acoustic consultants.

06 / Straight talk

Six mistakes that turn into a second fit-out

  • Absorbing the whole room and losing the back rows

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Adding speakers to fix a reverberation problem

    Small on the drawing, expensive on site, and almost always found after handover.

  • Ignoring the rear wall because it is behind the audience

    It sounds like a small detail until the room is finished and the complaint arrives.

  • Treating it as a generic Jordan job

    Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

05 / Supply

What the route into Jordan actually looks like

Supply into Jordan
Ships fromPalwal, Haryana, India
Arrives atAqaba, then road north to Amman
Dispatch4 to 7 working days
FreightSea via Aqaba, then road
SupportDrawings, build-ups, BOQ and material that arrives complete

Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

Sea freight into Aqaba, then road north to Amman and beyond. Air freight for samples and urgent quantities.

FAQ

Questions from Jordan projects

What makes auditorium acoustics and soundproofing different in Jordan?

Mosques, churches and civic halls are stone volumes with very long reverberation. Limestone cladding and hard floors give real mass but nothing absorbs anything. Ceiling absorption usually does most of the work.

Where should the budget go first on a Jordan project?

Reverberation time. Set against use. Speech and music want different numbers, and a dual use hall needs a decision. Early reflections. Shaped surfaces that send energy to the rear seats rather than absorbing everything.

Do you have an office or installation team in Jordan?

No. We manufacture in India and supply into Jordan. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.

How does material get to a Jordan site?

ships from: Palwal, Haryana, India, arrives at: Aqaba, then road north to Amman, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.

What goes wrong most often on this kind of project?

Absorbing the whole room and losing the back rows. Adding speakers to fix a reverberation problem.

What do you need from us to quote?

A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.

Next step

Send a plan and a section, get a real build-up

One drawing gets you a proper answer. Build-up, quantities, a delivered date, and an honest note on anything we think is the wrong approach.