For projects in Jeddah
Venue and restaurant acoustics in Jeddah
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other. Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
- Containment
- Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
- Table level comfort
- Absorption at the ceiling so guests stop raising their voices at each other.
- Entrance and service
- Doors, lobbies and extract paths, which is where most of the leakage actually is.
- Quote
- From a plan and a section, within 48 hours
01 / Start here
What this is, and what it changes in a Jeddah room
Two different jobs that get quoted as one: keeping bass inside the building for the neighbours, and making the room comfortable enough that guests can talk. Solving one does nothing for the other.
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Work reaching us from Jeddah is mostly hotels and hospitality, corporate offices, apartments, hospitals, schools, retail.
- A gateway for pilgrimage hospitality Large hotel quantities often continue inland from here. Tell us if that is happening and we stage and pack for the second leg.
- The port is at the city Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
- Coastal humidity PET felt does not absorb moisture, shed fibre or feed mould, which matters on a humid Red Sea coast where mineral products sag.
- Containment Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope.
Full specification
Thickness, density, NRC by frequency, fire class, standard sizes and build-up detail for venue soundproofing are on the main product page. This page covers what that means for a project in Jeddah.
Nightclub and venue soundproofing SoundBlanket mass loaded vinyl
02 / The build-up
The stack, in the order it is installed
-

Layer 1
SoundBlanket mass loaded vinyl
A limp, high density sheet that adds mass to a partition, floor or duct without adding depth. In Jeddah, cooling runs year round at high load, so chillers, AHUs and large duct runs are constant sources. Plant room lining and duct attenuation carry most of the result.
Floor, floating. Membrane under a resilient layer and a floating deck, so impact energy is broken before it reaches the slab.
-

Layer 2
Acoustic panels
The full absorber range rather than one product: plain PET felt, printed felt, grooved panels and fabric finishes, chosen by how the room is used and how it has to look. In Jeddah, mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
Mixed finish. Plain felt where it is out of eye line, printed or grooved where it is seen.
-

Layer 3
Wooden slat acoustic panels
Timber slats on an acoustic backing. In Jeddah, new school and university buildings are large, hard and highly glazed. Lecture theatres and sports halls are the spaces that fail first, and ceiling absorption is the practical fix.
Slats on felt backing. The standard. Absorption comes from the backing behind the gaps, so the slat gap ratio is an acoustic decision, not only a visual one.
We would rather argue about the build-up at design stage than on site. See how we support architects.
03 / In this market
What we see driving Jeddah briefs
- A gateway for pilgrimage hospitality
Large hotel quantities often continue inland from here. Tell us if that is happening and we stage and pack for the second leg.
- The port is at the city
Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
- Coastal humidity
PET felt does not absorb moisture, shed fibre or feed mould, which matters on a humid Red Sea coast where mineral products sag.
- Guest rooms fail at the door
Corridor noise and the next room cause more complaints than room acoustics. Door and wall detailing is where the work is.
- Assembly and performance rooms
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief.
04 / Room by room
Room by room, on a typical Jeddah job
-

Containment
Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Large hotel quantities often continue inland from here. Tell us if that is happening and we stage and pack for the second leg.
- Soundproofing materials, 2100 kg per cubic metre. 2.5 mm STC 30 at 5.25 kg per sq m, 4 mm STC 34 at 8.4, 6 mm at 12.6
- Acoustic panels, 1800 x 900 mm, image printed into the felt rather than onto a facing
- Wooden slat acoustic panels, 2440 x 192 mm and 2440 x 128 mm
-

Table level comfort
Absorption at the ceiling so guests stop raising their voices at each other. Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
- Soundproofing materials, 1800 x 900 x 20 mm, 100 kg per cubic metre, NRC 0.85
- Acoustic panels, Cut pattern in PET felt, adds visual rhythm without changing the absorber
- Wooden slat acoustic panels, 14, 16 and 18 mm
-

Entrance and service
Doors, lobbies and extract paths, which is where most of the leakage actually is. PET felt does not absorb moisture, shed fibre or feed mould, which matters on a humid Red Sea coast where mineral products sag.
- Soundproofing materials, Mass, then decoupling, then cavity absorption, then sealing
- Acoustic panels, ASTM C423
- Wooden slat acoustic panels, 96 sq ft per unit
Interior designers tend to arrive with the look already decided. We will tell you which finish gets there without losing the acoustics. See how we work with interior designers.
04 / Climate and durability
The Jeddah climate decides the material list
Jeddah is hot and dry for most of the year, with dust and high daytime surface temperatures, and that narrows the material list before acoustics is discussed.
Dust is the enemy of open-cell products. PET felt does not shed, does not hold dust in the way fabric-wrapped glass wool does, and wipes down. Timber needs a stable indoor RH or it moves.
The failure we design against here is dust ingress and thermal movement in long runs.
Consultants get the raw data, not a sales sheet. That is the whole of our side of the job, and it is set out under working with acoustic consultants.
06 / Worth knowing
Six mistakes that turn into a second fit-out
-
Panels on the wall as a neighbour noise solution
This is the one that comes back as a second fit-out rather than a snag.
-
A lobby with both doors able to open at once
Soundproofing fails at the gaps, not the materials. One unsealed service penetration can undo a correctly built wall.
-
Extract ducting that bypasses every wall you built
Noise with a source is fixed at the source. Treating the receiving room is the expensive way to get a small result.
-
Treating it as a generic Jeddah job
Large hotel quantities often continue inland from here. Tell us if that is happening and we stage and pack for the second leg.
05 / Route to site
Supply into Jeddah, start to site
| Ships from | Palwal, Haryana, India |
|---|---|
| Arrives at | Jeddah, then a short road run or onward inland |
| Dispatch | 4 to 7 working days |
| Freight | Sea into Jeddah |
| Support | Drawings, build-ups, BOQ and material that arrives complete |
Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
Sea freight direct into Jeddah, then a short road run to site or onward inland. Air freight for samples and urgent quantities.
Questions from Jeddah projects
What makes venue and restaurant acoustics different in Jeddah?
Mosques, conference halls and hotel ballrooms are tall hard volumes where intelligibility over a long reverberation tail is the whole brief. Direct sea into Jeddah keeps the road leg short and the landed cost predictable, which is unusual in this region.
Where should the budget go first on a Jeddah project?
Containment. Low frequency through structure to flats above and beside. Mass, decoupling and a sealed envelope. Table level comfort. Absorption at the ceiling so guests stop raising their voices at each other.
Do you have an office or installation team in Jeddah?
No. We manufacture in India and supply into Jeddah. We give you drawings, build-ups, a BOQ and material that arrives complete, and we will tell you plainly when a job needs a local contractor we cannot be.
How does material get to a Jeddah site?
ships from: Palwal, Haryana, India, arrives at: Jeddah, then a short road run or onward inland, dispatch: 4 to 7 working days. Standard items dispatch in 4 to 7 working days. Grooved panels and custom colours take longer, and we say so before you order, not after.
What goes wrong most often on this kind of project?
Panels on the wall as a neighbour noise solution. A lobby with both doors able to open at once.
What do you need from us to quote?
A plan, a section through the critical partition or ceiling, and what the room is for. From that we can give a build-up and a BOQ rather than a price per square foot.
Next step
Send the drawings, get a straight answer
Send what you have. We will give you a layer by layer build-up, a bill of quantities and a date material lands, and we will flag anything in the brief that will not achieve what you want.